Original source · versioned page text
Request For Delegation Under Section 42 Of The Transport Infrastructure Act 1994 Associated With OPW25/0072 Development Application For Operational Works (Vehicle Crossover, Roadworks, Drainage Works, Earthworks, Vegetation Clearing And Waterway Barrier Works) - 36 Roses Road Federal · Attachment 2 - (OPW25 0072) - Proposal Plans
Plans and drawings: the text below has words only, no drawings.
ATTACHMENT 2 - (OPW25/0072) - PROPOSAL PLANS 85 .0 0 85. 5 88.0 4. .0 8 77 88 .5.0 84 88 .5.0 66 250.810 8855.5.0 84.5 83 .0 ..5.05 .0 .5 84 888332 2 CT247.421 .5 84.584.083.5 8 883.0 2.5 82.582.0 83 .5 424 83.0 .5802 85. . 82.5 R20 24T0P239 8833. WV 84.0 0 C 49 84.5 85.0 84.5 83 8 37.6 83. 82 83 83.5 TC165.655 .5 TC2 .5 .03.8 .0 CT150.337 0 84.0 81 70 85.5 54.0 72.6 180 8.772 83 .5 .5 84 7 160 3.10 .26 CT1 84 .5 7 5 9.43 181 86.0 TC1 2 CT2 17 85.5 85.0 7 CT 01 2 81.5 0 8.6 82 .22 14 CT201.771 TC205.464 7. R20 85 86. 86.58 1 . 13 4.00 0 P2 193 81.5 .5 0 CT20 R20 TC 81.5 2 TC R20 200 R1 6. 5 7.0 87.5 88.0 84.5 R20 88.5 R20 0 89.0 12 89.5 90.0 90.5 86.0 86.5 0 87.0 84 91. 87.5 85 88.0 85 88.5 89.0 .5 .5 89.5 84.0 .0 90.0 0 10 97 .4 90.5 94 CT .5 86 91.5 .5 90.0 9 .5 89.0 88.5 0 88.0 87.5 89 87.0 91 .5 R6 .5 8 8 86 88 88. 87.5 7.0 6.5 0 .5 0 80 17 88.5 77.3 TP 88 89 C 89 90 . 5 .0 52 .5 .0 9 7 0. TC R6 0 90.5 0 3.0 60 91 .0 86 .7 51 .5 91 CT 92. 3 0 1.4 0 4 R6 TC 0 40 2 .48 37 9 CT 2.5 93. 0 93.0 R20 4.00 93.5 12.50 2T0C20.7 94.0 1 6 94 .0 95.0 94.0 94.5 LAYOUT PLAN 2.20 6.85 0.00 0 SU TRUCK meters 95. EMH 0 Width : 2.50 0 6 12 18m Track : 2.50 Lock to Lock Time : 6.00 Scale 1:300 @A1 Steering Angle : 36.6 95.5 Callaghan & Toth 36 ROSES ROAD FEDERAL Civil, Environmental & Hydraulic Engineers C MICHAEL JONES DESIGN FEATURES PLAN A1 OPERATIONAL WORKS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 1 page
Page 2
6.00
4.00
1.00
6.00
MIN 0.92
0.92
2 1
NEW CULVERT SET OUT COORDINATES
10.00 PT EASTING NORTHING DESCRIPTION
10.00 1 481548.3055 7080880.2557 RCBC END
2 481539.2221 7080880.8951 RCBC END
2.00
EMH
1.00
DRIVEWAY CROSS-OVER DETAIL PLAN 0 2 4 6m
Scale 1:100 @A1
ASPHALT GRAVEL
0.26
1.9m span
ELECTRICITY
TELSTRA
0.30
FIBRE OPTIC
1.40
SECTION X-X 0 1 2 3m
Scale 1:50 @A1
Callaghan & Toth 36 ROSES ROAD FEDERAL
Civil, Environmental & Hydraulic Engineers C
MICHAEL JONES DRIVEWAY CROSS-OVER DETAIL PLAN
A1
OPERATIONAL WORKS