Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                              Officer:            Kerri Coyle
                                              Direct Telephone:   (07) 5449 5223
                                              Response Address:   PO Box 141, Tewantin QLD 4565
                                              Email:              [email protected]
                                              Our Reference:      2006/823
                                              Your Reference:
27 January 2009

Viridian Noosa Pty Ltd
PO Box 2360
NOOSA HEADS QLD 4567



Dear Madam

                          Change to an Existing Approval
                                   Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 21 January 2009 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:
1        APPLICATION DETAILS

    Application No:               2006/823
    Street address:               5 Morwong Drive, Noosa Heads
    Real property description:    Lot 113 SP 188650
    Planning Scheme:              The Noosa Plan

2        DECISION DETAILS

Council on 15 February 2007 decided to issue the following type of approval:-
       Development Permit for Material Change of Use - Visitor Accommodation - Type 4
        Conventional (Resort), Entertainment & Dining - Type 1 Food & Beverages (Conference Room
        & Restaurant), Retail Business - Type 2 Shop & Salon (Shop), Commercial Business - Type 2
        Medical (Health Spa)
In relation to representations, Council on 19 April 2007 decided to:
A.       Agree to amend Conditions 5, 20, 35.2, 42.1, 66, 68, 70, 71, 73, 83, 140, 162, 167, 176, 182,
         204, 213.2.9, 213.3, 237, 242, 258, 263, 283, 284.3.1, 284.11, 286, 292, 306
B.       Agree to delete Condition 42.6
C.       Refuse to Change Condition 238 as the location of stockpiles is a normal requirement of
         EMP’s and are nominated on erosion & sediment control plans to ensure adequate controls
         are considered in the construction planning
D.       Refuse to change Condition 212 as requested but agree to amend
E.       Issue a Negotiated Decision Notice
In relation to an application to change conditions of the Development Approval Council on 27
February 2008 decided to:

                                                                                            Page 1 of 59
Full text of the other 58 pages

Page 2

                                                                                     2006/823

A.    Approve the change with the following changes to Conditions 1, 2, 20, 284.3.12, 286, 315 and
      Advice Conditions 1 and 2
B.    Issue a Compiled Decision Notice
In relation to the request to make a change to the existing approval, Council on 21 January 2009
decided to:
A.    Approve a change to Conditions 1, 2, 18 & 20
B.    Include an addition condition
C.    Include two additional advice conditions
D.    Issue a Change to an Existing Approval

3     RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4     ASSESSMENT MANAGER CONDITIONS
LAND USE
1.    The development permit for Material Change of Use of Premises is issued for an integrated
      Resort comprising:
      1.1.   Visitor Accommodation– Type 4 Conventional (Resort),
             1.1.1.   Resort residential buildings – 199 Accommodation/Dwelling Units comprising:
                      1.1.1.1. 5 x 1 bedroom accommodation units and 100 x 1 bedroom dwelling
                               units;
                      1.1.1.2. 47 x 2 bedroom dwelling units;
                      1.1.1.3. 46 x 3 bedroom dwelling units; and
                      1.1.1.4. 1 x Manager’s Residence comprising a 2 bedroom dwelling unit.
             1.1.2.   Ancillary resort reception and resort facilities as indicated on the approved
                      plans.
      1.2.   Entertainment & Dining – Type 1 Food & Beverages (Conference Room & Restaurant),
      1.3.   Retail Business – Type 2 Shop & Salon (Shop),
      1.4.   Commercial Business – Type 2 Medical (Health Spa).
2.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans as may be amended by these conditions
      are prepared by JMA Architects; and dated; and numbered as listed in the following table:
          Plan No.                      Plan Title                    Version             Date
     1013-DA-00-01       MASTER PLAN - Valley Master Option 7            4             30/08/2006
     1013-DA-00-02       MASTER PLAN - Valley Master CAS                 4             30/08/2006
     1013-DA-00-03       MASTER PLAN - Valley Aerial                     4             30/08/2006
     1013-DA-01-01       SITE PLAN - Basement                            5             28/11/2006
     1013-DA-01-02       SITE PLAN - Level 1                             5             28/11/2006
     1013-DA-01-03       SITE PLAN - Level 2                             5             28/11/2006
     1013-DA-01-04       SITE PLAN - Level 3                             5             28/11/2006
     1013-DA-01-05       SITE PLAN - Penthouses                          5             28/11/2006
     1013-DA-01-06       SITE PLAN - Proposal Overlay                    5             28/11/2006
     1013-DA-01-07       SITE PLAN - Amenity Plan                        5             28/11/2006
                                                                                  Page 2 of 59

Page 3

                                                                       2006/823


     Plan No.                    Plan Title               Version           Date
1013-DA-01-08     SITE PLAN - Height Summary                 5           28/11/2006
1013-DA-01-09     SITE PLAN – Carparking Plan                5           28/11/2006

1013-DA-02-01     SITE SECTIONS - Site Sections 1           4            31/08/2006
1013-DA-02-02     SITE SECTIONS - Site Sections 2           4            31/08/2006
1013-DA-02-03     SITE SECTIONS - Site Sections 3           4            31/08/2006
1013-DA-02-04     SITE SECTIONS - Site Sections 4           4            31/08/2006
1013-DA-02-05     SITE SECTIONS - Site Sections 5           4            31/08/2006

1013-DA-03-A-01   A BLOCK - Floor Plans                     4            30/08/2006
1013-DA-03-A-02   A BLOCK - Floor Plans                     4            30/08/2006
1013-DA-03-A-03   A BLOCK - Area Calculations               4            30/08/2006
1013-DA-03-A-04   A BLOCK - Elevations                      4            30/08/2006
1013-DA-03-A-05   A BLOCK - Sections                        4            30/08/2006

1013-DA-03-B-01   B BLOCK - Floor Plans                     4            30/08/2006
1013-DA-03-B-02   B BLOCK - Area Calculations               4            30/08/2006
1013-DA-03-B-03   B BLOCK - Elevations                      4            30/08/2006
1013-DA-03-B-04   B BLOCK - Section                         4            30/08/2006

1013-DA-03-C-01   C BLOCK - Floor Plans                     4            30/08/2006
1013-DA-03-C-02   C BLOCK - Floor Plans                     4            30/08/2006
1013-DA-03-C-03   C BLOCK - Area Calculations               4            30/08/2006
1013-DA-03-C-04   C BLOCK - Elevations                      4            30/08/2006
1013-DA-03-C-05   C BLOCK - Section                         4            30/08/2006

1013-DA-03-D-01   D BLOCK - Floor Plans                     5            29/11/2006
1013-DA-03-D-02   D BLOCK - Floor Plans                     5            29/11/2006
1013-DA-03-D-03   D BLOCK - Floor Plans                     5            29/11/2006
1013-DA-03-D-04   D BLOCK - Area Calculations               5            29/11/2006
1013-DA-03-D-05   D BLOCK - Area Calculations               5            29/11/2006
1013-DA-03-D-06   D BLOCK - Golden Door                     5            29/11/2006
1013-DA-03-D-07   D BLOCK - Elevations                      5            29/11/2006
1013-DA-03-D-08   D BLOCK - Elevations                      5            29/11/2006
1013-DA-03-D-09   D BLOCK - Sections                        5            29/11/2006
As amended by:
PDA1 4/01         BUILDING D – Site Plan                                  05/11/07
PDA1 4/02         BUILDING D – D Block - Basement                         05/11/07
PDA1 4/03         BUILDING D – D Block – First Floor                      05/11/07
PDA1 4/04         BUILDING D – D Block – Second Floor                     05/11/07
PDA1 4/05         BUILDING D – D Block – Third Floor                      05/11/07
PDA1 4/06         BUILDING D – D Block – Penthouses                       05/11/07
PDA1 4/07         BUILDING D – Section 2                                  06/02/08
PDA1 4/08         BUILDING D – Section 3                                  05/11/07
                  BUILDING D – Health Spa Wing – First                    05/11/07
PDA1 4/09         Level
                  BUILDING D – Health Spa Wing – Second                   05/11/07
PDA1 4/10         Level
                  BUILDING D – Health Spa Wing – Third                    05/11/07
PDA1 4/11         Level
PDA1 4/12         BUILDING D – Unit Type W                                05/11/07
PDA1 4/13         BUILDING D – Health Spa                                 05/11/07
                                                                    Page 3 of 59

Page 4

                                                                      2006/823


    Plan No.                     Plan Title              Version           Date
PDA1 4/14         BUILDING D – Layout 002                                05/11/07

1013-DA-03-E-01   E BLOCK - Floor Plans                    4            30/08/2006
1013-DA-03-E-02   E BLOCK - Floor Plans                    4            30/08/2006
1013-DA-03-E-03   E BLOCK - Area Calculations              4            30/08/2006
1013-DA-03-E-04   E BLOCK - Area Calculations              4            30/08/2006
1013-DA-03-E-05   E BLOCK - Elevations                     4            30/08/2006
1013-DA-03-E-06   E BLOCK - Section                        4            30/08/2006

1013-DA-03-F-01   F BLOCK - Floor Plans                    4            30/08/2006
1013-DA-03-F-02   F BLOCK - Floor Plans                    4            30/08/2006
1013-DA-03-F-03   F BLOCK - Area Calculations              4            30/08/2006
1013-DA-03-F-04   F BLOCK - Area Calculations              4            30/08/2006
1013-DA-03-F-05   F BLOCK - Elevations                     4            30/08/2006
1013-DA-03-F-06   F BLOCK - Section                        4            30/08/2006
1013-DA-03-F-07   F BLOCK - Section                        4            30/08/2006

1013-DA-03-G-01   G BLOCK - Floor Plans                    5            30/11/2006
1013-DA-03-G-02   G BLOCK - Floor Plans                    5            30/11/2006
1013-DA-03-G-03   G BLOCK - Area Calculations              5            30/11/2006
1013-DA-03-G-04   G BLOCK - Section                        5            30/11/2006
1013-DA-03-G-05   G BLOCK - Elevations                     5            30/11/2006

1013-DA-03-H-01   H BLOCK - Floor Plans                    5            30/11/2006
1013-DA-03-H-02   H BLOCK - Floor Plans                    5            30/11/2006
1013-DA-03-H-03   H BLOCK - Floor Plans                    5            30/11/2006
1013-DA-03-H-04   H BLOCK - Area Calculations              5            30/11/2006
1013-DA-03-H-05   H BLOCK - Section                        5            30/11/2006
1013-DA-03-H-06   H BLOCK - Elevations                     5            30/11/2006
As amended by:
PDA1 1/1-11       LOFT UNITS – Site Plan                                 05/11/07
PDA1 1/1-12       LOFT UNITS – Building Plan – Level 2                   05/11/07
PDA1 1/1-13       LOFT UNITS – Building Plan – Level 3                   05/11/07
PDA1 1/1-14       LOFT UNITS – Section 1                                 06/02/08
PDA1 1/1-15       LOFT UNITS – Section 4                                 05/11/07
PDA1 1/1-16       LOFT UNITS – Section b                                 06/02/08
PDA1 1/1-17       LOFT UNITS – Section f                                 05/11/07
PDA1 1/1-18       LOFT UNITS – Section e                                 05/11/07
PDA1 1/1-19       LOFT UNITS – Elevation 3                               05/11/07
PDA1 1/1-20       LOFT UNITS – Elevation 4                               05/11/07
PDA1 1/1-21       LOFT UNITS – Unit Plans                                05/11/07
PDA1 1/1-22       LOFT UNITS – Internal Elevations                       05/11/07
PDA1 1/2-01       MANAGERS UNIT – Site Plan                              05/11/07
                  MANAGERS UNIT – Building Plan – Sub                    05/11/07
PDA1 1/2-02       Floor
                  MANAGERS UNIT – Building Plan –                        05/11/07
PDA1 1/2-03       Basement
PDA1 1/2-04       MANAGERS UNIT – Section 1                              05/11/07
PDA1 1/2-05       MANAGERS UNIT – Section C                              05/11/07
PDA1 1/2-06       MANAGERS UNIT – Floor Plan                             05/11/07

1013-DA-03-I-01   I BLOCK - Floor Plans                    4            30/08/2006
                                                                   Page 4 of 59

Page 5

                                                                        2006/823


     Plan No.                     Plan Title               Version           Date
1013-DA-03-I-02   I BLOCK - Floor Plans                       4           30/08/2006
1013-DA-03-I-03   I BLOCK - Area Calculations                 4           30/08/2006
1013-DA-03-I-04   I BLOCK - Elevations                        4           30/08/2006
1013-DA-03-I-05   I BLOCK - Section                           4           30/08/2006
As amended by:
PDA1 2/01-01      GAMES ROOM – Site Plan                                   05/11/07
PDA1 2/01-02      GAMES ROOM – Building Plan                               05/11/07
PDA1 2/01-03      GAMES ROOM – Section 6                                   05/11/07
PDA1 2/01-04      GAMES ROOM – Floor Plan                                  05/11/07
PDA3 1/7          I BLOCK – Site Plan                                      17/06/08
PDA4-01           I BLOCK – First Floor                                    02/09/08
PDA4-02           I BLOCK – Second Floor                                   02/09/08
PDA4-03           I BLOCK – Third Floor                                    02/09/08
PDA3 4/7          I BLOCK – Elevation 1-2                                  17/06/08
PDA3 5/7          I BLOCK – Section B & 3                                  17/06/08
PDA3 6/7          I BLOCK – Unit 9.318 Plans                               17/06/08
PDA3 7/7          I BLOCK – Unit 9.417 Plan                                17/06/08

1013-DA-03-J-01   J BLOCK - Floor Plans                      4            30/08/2006
1013-DA-03-J-02   J BLOCK - Floor Plans                      4            30/08/2006
1013-DA-03-J-03   J BLOCK - Area Calculations                4            30/08/2006
1013-DA-03-J-04   J BLOCK - Elevations                       4            30/08/2006
1013-DA-03-J-05   J BLOCK - Section                          4            30/08/2006

1013-DA-03-V-01   V BLOCK - Floor Plans                      6            2/11/2006
1013-DA-03-V-02   V BLOCK - Area Calculations                5            2/11/2006
1013-DA-03-V-03   V BLOCK - Elevations                       5            2/11/2006
1013-DA-03-V-04   V BLOCK - Sections                         5            2/11/2006
1013-DA-03-V-05   V BLOCK - Refuse Truck In                  5            2/11/2006
1013-DA-03-V-06   V BLOCK - Refuse Truck Out                 5            2/11/2006
1013-DA-03-V-07   V BLOCK - Detail Sections for Refuse       5            2/11/2006
1013-DA-03-V-08   V BLOCK – Kitchen plan                     5            2/11/2006
1013-DA-03-V-09   V BLOCK – Waste Management Area            5            2/11/2006
As amended by:
PDA1 3/01         BUILDING V - Site Plan                                   05/11/07
PDA1 3/02         BUILDING V - Lower Level                                 05/11/07
PDA1 3/03         BUILDING V - Upper Level - Kitchen                       05/11/07
PDA1 ¾            BUIDLING V - Upper Level - Conference                    05/11/07
PDA1 3/05         BUILDING V – Roof Level                                  05/11/07
PDA1 3/06         BUILDING V – Section 1                                   06/02/08
PDA1 3/07         BUILDING V – Section 4                                   05/11/07
PDA1 3/08         BUILDING V – Section 5                                   05/11/07
PDA1 3/09         BUILDING V – Section B                                   05/11/07
PDA1 3/10         BUILDING V – Section C                                   05/11/07
PDA1 3/11         BUILDING V – Section D                                   05/11/07
PDA3 1/7          V BLOCK – Site Plan                                      2/09/08
PDA3 2/7          V BLOCK – Building Plan – Street Level                   2/09/08
PDA3 3/7          V BLOCK – Building Plan - Roof                           2/09/08
PDA3 4/7          V BLOCK – Elevations 1 & 2                               2/09/08
PDA3 5/7          V BLOCK – Elevations 3 & 4                               2/09/08
PDA3 6/7          V BLOCK – Section D & 1                                  2/09/08
PDA3 7/7          V BLOCK – Section 3 & 4                                  2/09/08
                                                                     Page 5 of 59

Page 6

                                                                                        2006/823


            Plan No.                      Plan Title                   Version             Date

     1013-DA-04-01       UNIT PLANS - Typical Resort Villas                4             30/08/2006
     1013-DA-04-02       UNIT PLANS - Typical Resort Villas                4             30/08/2006
     1013-DA-04-03       UNIT PLANS - Special Resort Villas                4             30/08/2006
     1013-DA-04-04       UNIT PLANS - Special Resort Villas                4             30/08/2006
     1013-DA-04-05       UNIT PLANS - Special Resort Villas                4             30/08/2006
     1013-DA-04-06       UNIT PLANS - Typical Resort Units                 4             30/08/2006
     1013-DA-04-07       UNIT PLANS - Special Resort Units                 4             30/08/2006
     1013-DA-04-08       UNIT PLANS - Special Resort Units                 4             30/08/2006
     1013-DA-04-09       UNIT PLANS - Special Resort Units                 4             30/08/2006
     1013-DA-04-10       UNIT PLANS - Resort Apartment                     4             30/08/2006
3.   The proposed development is to provide a conference facility in accordance with the plans
     detailed in the letter dated 7 February 2007 by Viridian Noosa Pty. Ltd. The conference facility
     shall be in accordance with the plans numbered ‘a’, ‘b’, ‘c’, and ‘d’ and will provide for the
     following:
     Plan ‘a’               Super Banquet              1 Banquet Dinner          800 Delegates
     Plan ‘b’               Classroom                  5-6 classrooms            564 Delegates
     Plan ‘c’               Breakout Conferences       6-8 workgroups            890 Delegates
     Plan ‘d’               Super Conferences          1 speaker                 964 Delegates
     The conference facility shall include the 90sq.m multi-media room and theatrette located in ‘D’
     Block.
4.   The ‘A Block Building’ main wall shall be setback a minimum of 5 metres from the side
     boundary. The deck shall be setback a minimum of 2.93 metres from the northern side
     boundary, and the associated roof shall be setback a minimum of 2.65 metres with screening
     vegetation provided between Building A and the adjacent southern buildings located on Lot 13
     on SP151409 to the satisfaction of the Manager of Land Use. The vegetation screening to be
     established in this area shall ensure visual privacy is provided to the adjoining villas, and
     filtered vegetation screening is provided to Building A from Main Beach.
5.   Buildings A, B, C, E, F (except for 1 garage which shall be 2 degrees), J, V (restaurant outdoor
     dining area) on site shall incorporate a minimum roof pitch of 5 degrees. Amended plans
     detailing any variations to roof levels resulting from this condition shall include amended
     building heights and shall be submitted to Council and be to the reasonable satisfaction of the
     Manager Land Use prior to the issue of a Development Permit for Building Works.
6.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting nuisance or other emissions.
7.   The open space and setback areas are to be landscaped in accordance with Council’s Policy
     on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
     qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
     the premises being occupied and maintained at all times thereafter.
8.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use. These landscape
     plans required to be submitted are to denote areas of existing vegetation or existing trees
     proposed/required to be retained.
9.   Cleared vegetation is to be suitably processed by the following method on site:-
     9.1.    Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
             loose in heaps less than 2.5 metres high with a minimum of 10 metres between edges
             of heaps;
                                                                                   Page 6 of 59

Page 7

                                                                                        2006/823

      9.2.   Utilised for on site landscaping and stabilisation purposes;
      9.3.   The Applicant is advised that burning off is an unacceptable method of disposal.
10.   Any advertising sign or device is to comply with Council's policies on advertising.
11.   Secure bicycle racks shall be provided on site to accommodate a minimum of 20 bicycles.
      The proposed bicycle racks shall be designed in accordance with Australian Standards. The
      racks shall be identified on the landscaping plans and shall be located to the reasonable
      satisfaction of the Manager, Land Use.
12.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of work confirming compliance with the maximum
      allowable building height as required by either the conditions of approval or the Planning
      Scheme.
13.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
14.   Security in the form of a cash bond or trading bank guarantee to the sum of $1,000,000 must
      be submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for Operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
15.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
16.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 15 February 2011, unless an application to extend the currency is approved by
      Council.
17.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice including all retaining wall construction, prior to obtaining a Development Permit for
      Building Works.
18.   Roof runoff shall be directed to a rainwater storage system or tank to buildings as nominated
      on the approved plans (minimum storage 3000 litres per villa for Blocks A, B, C, E, F, & J
      containing 39 resort villas, and for Blocks D, G, H, & I which contain 160 units provide
                                             2
      minimum storage based on 12 litres/m of total roof area) that is plumbed to service the toilets
      and landscaping. The design of the rainwater storage system where above ground and in
      external tanks shall be earthy colours and designed to the satisfaction of the Manager –
      Plumbing Services.
19.   All of the Conditions are integral to and non-severable from the development approval. In the
      interpretation of these Conditions or the exercise of any discretion by the Council or its
      officers, the overriding consideration shall be to ensure that the visual and environmental
      impact of the Development on the Site is minimal and to enhance and maintain the
      Environmental Values of the Site.
Development Parameters
20.   The Development shall be undertaken strictly in accordance with the development parameters
      specified below, except where otherwise specified in these conditions:



                                                                                     Page 7 of 59

Page 8

                                                                     2006/823

A Block
          Development Parameter                Required Standard
Building Height (Storeys)         3 storeys maximum
Building Height                   not to exceed RL 47.3
Site Cover                        not to exceed the site cover for Block A as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for Block
                                  A as shown on the Approved Plan
Building Colours                  external colours as specified in these
                                  conditions will be selected to integrate with
                                  the colours of the natural environment
Building Materials                colorbond roofs, aluminium window frames,
                                  lightweight external wall cladding, non-
                                  reflective window glass and masonry
                                  elements in the base, timber or metal posts
                                  and handrails
B Block
          Development Parameter                Required Standard
Building Height (Storeys)         2 Storeys maximum
Building Height                   not to exceed RL 49.0
Site Cover                        not to exceed the site cover Block B as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for Block
                                  B as shown on the Approved Plans
Building Colours                  External colours as specified in these
                                  conditions will be selected to integrate with
                                  the colours of the natural environment
Building Materials                colorbond roofs, aluminium window frames,
                                  lightweight external wall cladding, non-
                                  reflective window glass and masonry
                                  elements in the base, timber or metal posts
                                  and handrails
Configuration of Units            3 x 3 Bedroom Units

C Block
          Development Parameter                Required Standard
Building Height (Storeys)         3 storeys maximum
Building Height                   not to exceed RL 51.0
Site Cover                        not to exceed the site cover for Block C as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for Block
                                  C as shown on the Approved Plans
Building Colours                  external colours as specified in these
                                  conditions will vary between buildings and
                                  also within each building
Building Materials                colorbond roofs, aluminium window frames,
                                  lightweight external wall cladding, non-
                                  reflective window glass and masonry
                                  elements in the base, timber or metal posts
                                  and handrails
Configuration of Units            8 x 4 Bedroom Units


                                                                  Page 8 of 59

Page 9

                                                                     2006/823



D Block
          Development Parameter                 Required Standard
Building Height (Storeys)         4 storeys maximum
Building Height                   not to exceed RL 53.5
Site Cover                        not to exceed the site cover for D Block as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for D
                                  Block as shown on the Approved Plans
Building Colours                  external colours as specified in these
                                  conditions will be selected to integrate with
                                  the colours of the natural environment
Building Materials                colorbond roofs, aluminium window frames,
                                  predominately concrete slab on ground
                                  with masonry construction with render
                                  texture finish
Configuration of Units            8 x 3 Bedroom Units
                                  8 x 2 Bedroom Units

E Block
          Development Parameter                Required Standard
Building Height (Storeys)         2 storeys maximum
                                  3 storeys for Unit 5108e
Building Height                   Unit 1 not to exceed RL 60.7
                                  Unit 2 not to exceed RL 60.3
                                  Unit 3 not to exceed RL 59.8
                                  Unit 4 not to exceed RL 59.3
                                  Unit 5 not to exceed RL 58.8
                                  Unit 6 not to exceed RL 58.3
                                  Unit 7 not to exceed RL 58.1
                                  Unit 8 not to exceed RL 58.7
Site Cover                        not to exceed the site cover for E Block as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for E
                                  Block as shown on the Approved Plans
Building Colours                  external colours as specified in these
                                  conditions will be selected to integrate with
                                  the colours of the natural environment
Building Materials                colorbond roofs, aluminium window frames,
                                  lightweight external wall cladding, non-
                                  reflective window glass and masonry
                                  elements in the base, timber or metal posts
                                  and handrails
Configuration of Units            8 Units comprising
                                  7 x 3 Bedroom units
                                  1 x 4 Bedroom unit

F Block
          Development Parameter                Required Standard
Building Height (Storeys)         2 storeys maximum
                                  3 Storeys for units 6-108g and 6-1089f
Building Height                   Units 1 & 2 not to exceed RL 49.3
                                  Units 3-5 not to exceed RL 50.8
                                  Units 6 & 7 not to exceed RL 51.1
                                                                  Page 9 of 59

Page 10

                                                                     2006/823


          Development Parameter                Required Standard
                                  Unit 8 not to exceed RL 54.8
                                  Unit 9 not to exceed RL 55.3
Site Cover                        not to exceed the site cover for F Block as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for F
                                  Block as shown on the Approved Plans
Building Colours                  external colours as specified in these
                                  conditions will be selected to integrate with
                                  the colours of the natural environment
Building Materials                colorbond roofs, aluminium window frames,
                                  lightweight external wall cladding, non-
                                  reflective window glass and masonry
                                  elements in the base, timber or metal posts
                                  and handrails
Configuration of Units            9 Units Comprising:
                                  2 x 2 Bedroom Units
                                  7 x 3 Bedroom Units

G Block
          Development Parameter                 Required Standard
Building Height (Storeys)         4 storeys maximum
Building Height                   not to exceed RL 53.7
Site Cover                        not to exceed the site cover for G Block as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for G
                                  Block as shown on the Approved Plans
Building Colours                  external colours as specified in these
                                  conditions will be selected to integrate with
                                  the colours of the natural environment
Building Materials                colorbond roofs, aluminium window frames,
                                  predominately concrete slab on ground
                                  with masonry construction with render
                                  texture finish
Configuration of Units            62 Units Comprising
                                  16 x 2 Bedroom units
                                  46 x 1 Bedroom units

H Block
          Development Parameter                 Required Standard
Building Height (Storeys)         5 storeys in part maximum
Building Height                   not to exceed RL 48.5
Site Cover                        not to exceed the site cover for H Block as
                                  shown on the Approved Plans
Gross Floor Area                  not to exceed the gross floor area for H
                                  Block as shown on the Approved Plans
Building Colours                  external colours as specified in these
                                  conditions will be selected to integrate with
                                  the colours of the natural environment
Building Materials                colorbond roofs, aluminium window frames,
                                  predominately concrete slab on ground
                                  with masonry construction with render
                                  texture finish
Configuration of Units            31 Units Comprising (30 Units)
                                                                 Page 10 of 59

Page 11

                                                                      2006/823


           Development Parameter               Required Standard
                                   19 x 1 Bedroom units
                                   11 x 2 Bedroom units
                                   1 x Manager’s Accommodation

I Block
          Development Parameter                  Required Standard
Building Height (Storeys)          3 storeys maximum
Building Height                    not to exceed RL 39.0
Site Cover                         not to exceed the site cover for I Block as
                                   shown on the Approved Plans
Gross Floor Area                   not to exceed the gross floor area for I
                                   Block as shown on the Approved Plans
Building Colours                   external colours as specified in these
                                   conditions will be selected to integrate with
                                   the colours of the natural environment
Building Materials                 colorbond roofs, aluminium window frames,
                                   predominately concrete slab on ground
                                   with masonry construction with render
                                   texture finish
Configuration of Units             51 Units comprising
                                   5 x 1 Bedroom Accommodation Units and
                                   35 x 1 Bedroom Dwelling Units
                                   10 x 2 Bedroom Units
                                   1 x 3 Bedroom Units


 J Block
          Development Parameter                 Required Standard
Building Height (Storeys)          3 storeys maximum
Building Height                    not to exceed RL 38.0
Site Cover                         not to exceed the site cover for J Block as
                                   shown on the Approved Plans
Gross Floor Area                   not to exceed the gross floor area for J
                                   Block as shown on the Approved Plans
Building Colours                   external colours as specified in these
                                   conditions will be selected to integrate with
                                   the colours of the natural environment
Building Materials                 colorbond roofs, aluminium window frames,
                                   lightweight external wall cladding, non-
                                   reflective window glass and masonry
                                   elements in the base, timber or metal posts
                                   and handrails
Configuration of Units             7 Units comprising
                                   1 x 3 bedroom unit
                                   6 x 4 bedroom units

V Block
          Development Parameter               Required Standard
Building Height (Storeys)          2 storeys maximum
Building Height
                                   not to exceed RL 41.3
Site Cover                         not to exceed the site cover for V Block as
                                                                  Page 11 of 59

Page 12

                                                                                        2006/823


                Development Parameter                              Required Standard
                                                     shown on the Approved Plans
      Gross Floor Area                               not to exceed the gross floor area for V
                                                     Block as shown on the Approved Plans
      Building Colours                               external colours as specified in these
                                                     conditions will be selected to integrate with
                                                     the colours of the natural environment
      Building Materials                             colorbond roofs, aluminium window frames,
                                                     predominately concrete slab on ground
                                                     with masonry construction with render
                                                     texture finish
      The abovementioned development parameters shall be contained in the community
      management statement of any or all relevant bodies corporate having control of any part of the
      Site.
      Building heights above shall be measured to exclude any variation resulting from the
      requirements of Condition 5.
      The range of building materials above are indicative with the intents that Blocks A, B, C, E, F &
      J are to be of light-weight material construction whereas the other blocks include masonry with
      light-weight infill as required.
Buffer to Intermittent Creek
21.   Building I, Building H and Building G, and Building F and associated decks, eaves and
      balconies must be located at least 10 metres measured horizontally from the centre line of the
      intermittent creek.
22.   Site rehabilitation along the intermittent creek shall be extended beyond the boundary of the
      Resort Private Open Space Area in the vicinity of the Intermittent Creek to between the
      Buildings I, H, G, and F and along the setback from the intermittent creek to the Building G
      and Building I, except where the ornamental pool is located.
Resort
23.   The Resort (comprising the Restaurant and Conference Room Facility Building V, Health Spa,
      Resort Accommodation Buildings (dwelling units & accommodation units), Reception Area and
      Shop) shall be operated and maintained as a Resort. The accommodation in the Resort will
      not be used for the purpose of permanent residential accommodation, with the exception of
      the Manager’s Accommodation. The resort shall operate in accordance with the defined use
      of ‘Visitor Accommodation - Type 4 Conventional’ in the Noosa Plan which provides for short
      term visitor accommodation. The community management statement for any or all bodies
      corporate having control of the Resort or any part thereof shall incorporate this condition.
Colours
24.   The colours of the buildings on Site shall be muted tones of browns, greens and greys
      selected from the following colour palette:
           Roofs (Colorbond)                     Walls                          Balcony Ceilings
          Woodland Grey         Spotted Gum Palette as included in      Woodland Grey or charcoal for
                                the application, with ‘jma white’ not   Buildings A, B, C, D, E, J on
                                to be visible from outside the site.    north and western sides.
      The Manager – Land Use may agree to a variation of the colour palette where such variation
      is complimentary to and reflects the natural environment within which a building is situated.
Buildings
25.   The following requirements apply to the Resort Restaurant and Conference Facilities Building:
                                                                                    Page 12 of 59

Page 13

                                                                                         2006/823

      25.1. No temporary or permanent structures are to be erected on the outside deck including
            marquees, but not including temporary umbrellas that are not joined and not exceeding
              2
            9m in area, or lightweight retractable awnings in subdued colours.
      25.2. The western boundary of the restaurant/ conference room deck shall have acoustic
            louvre screening installed as indicated on the approved plans.
26.   The following requirements apply to the Resort Residential Buildings I, H, G, and F:
      26.1. Lighting to the outside balconies shall be hooded and directed downwards so as to
            minimise any adverse effects of glare or direct light nuisance on Lot 27, and to reduce
            the impact on wildlife in the intermittent creek private open space area.
      26.2. The pool located between Building I and Building H shall be for ornamental purposes
            only.
27.   The following requirements apply to the Resort Residential Buildings:
      27.1. There are to be no rooftop terraces, spas or barbeques on the roof of any buildings on
            the Site.
Architectural Parameters
28.   The architectural parameters specified in these conditions are to be strictly applied to the
      Development on Site.
29.   All buildings shall be stepped and terraced in horizontal and vertical planes as indicated on
      approved plans.
30.   Any deck or balcony areas are not to be enclosed with fixed shutters, glass panelling or the
      like, thus remaining as open structures with balustrades, except as shown on the approved
      plans for Building V where fixed louvre blades are provided on the western side. Any
      sunscreens or privacy screens are to be retractable so as not to permanently enclose these
      areas. The villas shall have at least 2 sides of the deck open with balustrades only provided.
      All deck areas are to remain open when not in use.
31.   All building construction and materials shall have regard to the objective of providing
      lightweight buildings and causing minimal impact on visual amenity or the environmental
      values of the site, except where otherwise specified in the approved plans or in these
      conditions.
32.   The roof shapes and forms shall be in accordance with the approved plans as amended by
      these conditions or as otherwise agreed by the Manager – Land Use.
33.   The orientation and location of the buildings shall be in accordance with the approved plans.
34.   The architectural treatments (eg decks, shutters, roof overhangs, pitch of roofs, windows,
      façade treatment, articulation of buildings and roofs, roof form, orientation, fenestration) shall
      be undertaken in accordance with the approved plans as amended by these Conditions or as
      otherwise agreed by the Manager – Land Use.
35.   The developer shall submit full colour western elevation plans for Building I detailing:
      35.1    The visual break up of the western building facade by incorporating different
             complimentary colours, textures, and building materials.
      35.2   The plans shall be submitted to Council and be to the reasonable satisfaction of the
             Manager Land Use prior to the issue of a Development Permit for Building Works.
36.   The Manager – Land Use may agree to a variation or dispensation of any of the architectural
      parameters where such variation or dispensation is reasonable having regard to the effect of
      building design in accordance with the Architectural Sketch Drawings or such variation or
      dispensation makes provision for passive solar design. The Manager - Land Use will act
      reasonably in making this decision.
                                                                                     Page 13 of 59

Page 14

                                                                                           2006/823

37.   The high level pool located to the east of Building B as indicated on the approved plans shall
      utilise stone cladding on the visible side of the retaining walls and pool retaining wall. The
      stone shall be of the colour of the local rock and of a subdued colour. Vegetation shall be
      used to effectively screen the retaining walls in this area.
38.   No shade structures or gazebo shall be erected in the vicinity of the high level pool and
      lookout located to the east of Building B. Temporary umbrellas used in this area shall be of
      dark colours.
Energy Efficiency and Ecological Sustainability
39.   All hot water systems installed shall be either solar systems; electric heat pump systems; or
      gas systems (LPG or natural) or combination of the above, unless not suitable in areas for the
      preparation of food for the restaurant.
40.   The Developer shall incorporate the principles and practices of renewable energy, energy
      efficiency and ecological sustainability in the design, construction and operation of the
      Development. The Developer shall submit a report prepared by a suitably qualified consultant
      experienced in energy efficiency design for approval by the Manager - Land Use prior to
      lodgement of each application for building works addressing how the issues included in these
      conditions and the principles and practices of energy efficient design and renewable energy
      are incorporated in the design of the buildings. In undertaking the design of all buildings, the
      Developer shall include:
      40.1. the use of energy efficient design techniques in the construction of the building;
      40.2. the installation of energy efficient hot water systems (solar and gas booster, or electric
            heat pump);
      40.3. solar or gas energy for the heating of swimming pools;
      40.4. the use of low energy bulbs;
      40.5. model energy consumption requirements of the building and its services including
            passive solar design and how industry best practice energy consumption standards can
            be achieved;
      40.6. the use of passive solar building design;
      40.7. the use of cross ventilation and insulation to reduce/eliminate the need for air-
            conditioning and the use of in ground heat exchange systems for air-conditioning;
      40.8. the use of appropriate building materials, where possible, to provide the most effective,
            “thermal mass” and insulation to reduce heating and cooling costs, controlling solar
            access to thermal mass using overhangs and shading/screens with unshaded external
            thermal mass to be avoided. The use of lightweight building materials is to be
            maximised wherever practical;
      40.9. the use of adjustable or hinged/sliding screens to balance views versus sunlight access;
      40.10.the use of natural ventilation of basement car parking;
      40.11.the use of energy efficient pumps for roof water systems;
      40.12.the use of window openings to optimise available natural light;
      40.13.the location of solar panels in a manner that does not result in reflection or an
            appearance that adversely affects the visual amenity of the Site or the architectural
            theme of the buildings;
      40.14.the installation of site water re-use tanks as required in these conditions;
      40.15.the use of spectrally selective and / or low emissivity glass shall be incorporated where
            appropriate in the detailed design, so as to reduce heat transmission to and from
            buildings.
                                                                                     Page 14 of 59

Page 15

                                                                                         2006/823

41.   In addition to applying the principles of ecological sustainability to the design and construction
      of operational works and building works, the Developer shall specifically:-
      41.1. prepare and implement the environmental management plan;
      41.2. perform the sedimentation and erosion measures;
      41.3. install the barrier fencing to protect vegetation and habitat;
      41.4. maintain rehabilitation works at the expiry of the existing site rehabilitation maintenance
            period for relevant areas within Lot 888 on SP186498;
      41.5. undertake the landscaping works;
      41.6. create the desired habitat in the freshwater habitat pond on the western edge of the
            Site;
      41.7. undertake the site decontamination works as proposed with relocation of this material
            off- site if necessary;
      41.8. as required by these Conditions.
42.   In establishing and operating the Development, the Developer shall include:
      42.1. an estimation of the energy requirements of the on-site uses, and an estimate of the
            percentage of this that can be provided from renewable energy sources generated on-
            site (preferably a minimum of 2%);
      42.2. the use of low energy bulbs in street lighting and lighting for internal pathways and
            walkways is to be solar powered, where possible. Security lighting is to operate by
            movement sensors to lights in areas that are infrequently used or are used for only short
            periods;
      42.3. installation of energy efficient hot water systems (solar and gas booster; or electric heat
            pump) having at least a 3.5 star energy efficient rating, and solar or gas energy for the
            heating of swimming pools;
      42.4. the use of appliances having the lowest energy rating, including but not limited to,
            shower roses, light fittings, heaters, refrigerators, microwave ovens and clothes driers;
      42.5. any buggies associated with the operation of the Resort are to be electrical or gas
            powered;
      42.6. Deleted;
      42.7. the installation of power saving devices in the development;
      The Developer shall submit a report for approval by the Manager – Land Use prior to the
      commencement of use which demonstrates how the issues specified in this condition have
      been incorporated into the operational phase of the Development.
43.   In establishing and operating the Development, the Developer shall provide:
      43.1. staff and guest education programs to encourage participation in energy use reduction
            activities in the Resort;
      43.2. for the encouragement of guests of the Resort to walk or cycle in preference to the use
            of vehicles to be achieved by the construction of pedestrian walkways and provision of
            bicycles for use by guests of the Resort.
Staging
44.   The construction of the Resort components shall not be staged.
Lighting
45.   The Development must meet the lighting design requirements contained in:
                                                                                     Page 15 of 59

Page 16

                                                                                            2006/823

        45.1. Electricity Act 1994 (Qld);
        45.2. Electricity Regulation 1994 (Qld);
        45.3. Workplace Health and Safety Act 1995 (Qld);
        45.4. Environment Protection Regulation 1998;
        45.5. Council’s Local Laws;
        45.6. Energex URD Guidelines and general requirements;
        45.7. Building Code of Australia;
        45.8. Australian Standards AS 3000 - Wiring Rules;
        45.9. Australian Standards AS 1158 – The lighting of urban roads and other public
              thoroughfares; and
        45.10.Australian Standards AS 4282 – Control of obtrusive effects of outdoor lighting.
46.     The level of illumination, at a distance of 1.5 metres outside the boundary of the site, resulting
        from direct, reflected or other incidental light emanating from the site shall not exceed eight lux
        measured at any level upwards from ground level.
47.     Lighting on Alma Way shall be hooded and directed downwards so as to minimise any
        adverse effects of glare or direct light nuisance on all adjacent allotments, but must achieve a
        minimum level of illumination consistent with the safety of pedestrians and vehicles.
48.     Lighting to Public Walkways and pedestrian /buggy paths, where required, is to be low level
        bollard type lighting, down lighting or foot lights that achieve the minimum of illumination and
        light spillage consistent with safety for pedestrians and vehicles. The Public Walkways must
        only be lit between Morwong Drive and the Building E & F.
49.     Lighting to the Resort Building V is to be directed downwards to minimise any adverse effects
        of glare or direct light nuisance on all adjacent allotments.
50.     Lighting of the Resort Dwelling Units and Accommodation Units and Restaurant is to be
        screened or shielded from any outward projection to the downwards angle so that the light
        source is not seen from outside the Site. Security lighting (such as floodlighting), driveway
        lighting, landscape lighting and lighting of the grounds are to be screened from any horizontal
        or downwards projection beyond the angle needed to allow coverage only of the ground within
        each allotment and so as predominately not to be seen from outside the Site.
Water
51.     Sand, silt, mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to
        enter or be placed where it could reasonably be expected to move into a roadside gutter,
        stormwater drain or a water course.
52.     The Developer is advised that in accordance with the Environmental Protection Act 1994 all
        waste water from any excavations or de-watering activities must be treated to remove
        suspended solids (<50mg/L) and maintain the pH within an acceptable range of 6.5-8.5 to
        ensure contaminants are not released. The appropriate monitoring of any waste water
        discharges shall be undertaken by the Developer.
Protection of Visual and Aesthetic Values
53.     The Landscape Management Report, the Site Rehabilitation Plan, the Environmental
        Management Plan and the Construction Management Plan shall specify the manner in which
        the visual and aesthetic values of the site and the adjoining National Park will be protected
        and enhanced and the manner in which buildings, roads and pathways will be visually
        screened and visually integrated into the landscape..


                                                                                       Page 16 of 59

Page 17

                                                                                           2006/823

54.   Only minor pruning will be permitted of existing tree branches protruding beyond the 10m
      setback line under the supervision of the site arborist. The degree of pruning required will be
      submitted for approval in conjunction with an application for operational works.
55.   No earthworks (fill or cut or earth-spill) shall occur within the 10m intermittent creek setback
      line.
56.   Retaining walls are to be designed and constructed to provide bridging footing structures as
      necessary to avoid root damage to retained trees.
57.   Upper level pool and lookout earthworks are to be minimal in scale and extent and localised to
      the footprint of the immediate construction. The pool is to be a maximum of 12m long by 4 in
      size. Earthworks are to be temporarily screened from Hastings Street utilising black or dark
      green shade cloth or equivalent material until construction work in this area is fully stabilised.
      Disturbed soil in this area is to be fully stabilised within 10 business days of initial disturbance
      with either a temporary or permanent treatment.
58.   The fence colour of the upper level pool located to the east of Building B shall be non
      reflective and charcoal/ woodland grey in colour. The retaining wall for the pool is to be clad in
      dark coloured rock, with native plantings located in front of it to provide screening.
59.   No shade structures or gazebo shall be erected at the lookout or upper level pool behind
      Building B. Only black, dark brown or navy blue coloured umbrellas shall be used in the
      vicinity of this pool.
60.   Trees to be removed shall be in accordance with the approved plans.
61.   Disturbance of the upper eastern area of the site to construct the boulder gabion walls shall
      minimise the disturbance to existing native trees and their roots wherever possible. Suitable
      techniques will be utilised to minimise disturbance and damage to this area. Rocks utilised will
      be grey in colour, with non-reflective wire cages.
Environmental Management Plan
Preparation
62.   An environmental management plan (EMP) for the Site shall be prepared and implemented by
      persons holding appropriate environmental and construction engineering qualifications and
      proven expertise in the preparation and implementation of EMPs, to ensure that the impact on
      the environment of the carrying out of the Development is minimised, the Environmental
      Values of the Site are protected and enhanced and the Development is ecologically
      sustainable.
63.   The EMP shall document in detail how compliance with the Conditions is to be achieved.
64.   The EMP shall demonstrate a high level of environmental care and responsibility and be
      consistent with best practice for developments of this type in similar environments.
65.   The EMP shall detail the Developer’s environmental policy and the proposed environmental
      management system for the Site.
66.   The EMP shall specify to the reasonable satisfaction of the Manager – Land Development:
      66.1 The performance targets, including those derived from the Conditions and other
           requirements arising from legislation and other approvals;
      66.2 how the performance targets are to be achieved;
      66.3 who is responsible;
      66.4 when the performance targets will be satisfied;
      66.5 how performance will be monitored;
      66.6 reporting arrangements;
                                                                                      Page 17 of 59

Page 18

                                                                                        2006/823

      66.7 auditing arrangements;
      66.8 how the requirements are to be incorporated into construction and works contracts;
      66.9    how the Developer’s employees, contractors and the contractor’s employees will be
             informed and trained with respect to the environmental protection requirements;
      66.10 enforcement; and
      66.11 penalties for non-compliance.
67.   The EMP shall include a construction management plan for the Development prepared for the
      Site by a suitably qualified consultant. This construction management plan shall be specific
      for the resort construction and shall address the following issues to the reasonable satisfaction
      of the Manager – Land Development:
      67.1. construction staging and timing;
      67.2. access and construction vehicle parking and traffic management;
      67.3. water quality protection;
      67.4. vegetation management & protection of vulnerable plant species;
      67.5. fauna habitat and fauna corridor management;
      67.6. environmental management in accordance with the Conditions and the EMP;
      67.7. environmental protection requirements to be specified in all construction, rehabilitation,
            landscaping and works contracts;
      67.8. environmental safeguards and contingency plans to deal with accidental events and
            acts of god (ie floods, landslides etc);
      67.9. ensure that disturbed areas are confined to development areas and shall not encroach
            into the 10 metre setback to the creek (including stockpiling and temporary works);
      67.10.safety;
      67.11.responsibilities;
      67.12.induction and training, including environmental protection requirements;
      67.13.staged sediment and erosion control;
      67.14.work hours;
      67.15.legislative compliance;
      67.16.geotechnical requirements including stability of the Site;
      67.17.aquatic ecosystem protection;
      67.18.air, noise and vibration management;
      67.19.vehicle wash down requirements;
      67.20.on-site machinery and vehicle storage;
      67.21.vehicle and machinery maintenance;
      67.22.on-site storage of excavated materials;
      67.23.on-site storage of topsoil, mulch and other landscaping supplies;
      67.24.storage and handling of dangerous goods on site;
      67.25.on-site storage of construction materials;
      67.26.bushfire prevention in accordance with the Fire Management Plan;
                                                                                    Page 18 of 59

Page 19

                                                                                      2006/823

      67.27.weed and pest control;
      67.28.waste management;
      67.29.prevention of spills and emergency response;
      67.30.soil contamination;
      67.31.groundwater protection;
      67.32.visual amenity protection;
      67.33.cultural heritage management;
      67.34.monitoring requirements;
      67.35.identification of incidents and failures;
      67.36.corrective action and contingency measures;
      67.37.community liaison;
      67.38.audit and review procedures.
68.   The EMP shall include an operational management plan for the Development prepared for the
      Site by a suitably qualified consultant. This operational management plan shall be specific for
      the resort and shall address the following issues to the reasonable satisfaction of the Manager
      – Land Development:
      68.1 soil erosion and sediment control;
      68.2 geotechnical requirements including long term stability of the Site;
      68.3 air, noise and vibration management;
      68.4 traffic management including traffic generation, egress and access;
      68.5 groundwater protection;
      68.6 vegetation protection;
      68.7 protection of vulnerable plant species;
      68.8 fauna, fauna habitat and fauna corridor protection;
      68.9 aquatic ecosystems protection;
      68.10 on-site vehicle storage and machinery maintenance;
      68.11 storage and handling of dangerous goods on site;
      68.12 bushfire prevention and control in accordance with the Fire Management Plan;
      68.13 weed and pest control;
      68.14 water quality protection;
      68.15 waste management;
      68.16 prevention of spills and emergency response;
      68.17 visual amenity protection;
      68.18 monitoring requirements;
      68.19 identification of incidents and failures;
      68.20 corrective action and contingency measures;
      68.21 audit and review.

                                                                                  Page 19 of 59

Page 20

                                                                                          2006/823

Approval
69.   The EMP shall be submitted for approval to Council in conjunction with an application for
      Operational Works for the Site.
70.   The Developer shall not commence any development on Site until the EMP – Construction
      Management Plan is approved by the Manager – Land Development; and the Developer shall
      not commence any building work on Site until the EMP – Operational Management Plan is
      approved by the Manager – Land Development.       The approval of the Manager - Land
      Development is not to be unreasonably withheld.
71.   The Developer may amend the construction management plan only with the prior written
      approval of the Manager – Land Development, which is not to be unreasonably withheld.
Implementation
72.   The Developer shall comply with the EMP and compliance with the EMP shall be addressed
      by the community management statement of any or all bodies corporate having control of any
      part of the Site.
Revision
73.   The Developer may amend the EMP only with the prior written approval of the Manager –
      Land Development, which is not to be unreasonably withheld.
Site Rehabilitation Plan
74.   The Site Rehabilitation Plan Rev. 1 dated 11.7.2003 shall be complied with for the provisions
      that relate to Lot 106 on SP151408.
Flora and Fauna Protection
Vegetation Protection
75.   No vegetation indigenous to the Site or vegetation within the road reserves adjoining the Site
      shall be cut down, lopped, damaged, disrupted or adversely affected without the prior written
      consent of the Manager – Land Use. However the vegetation identified in the approved plans
      for removal may be removed or lopped following the issue of a development permit for
      operational works for each area and in conjunction with the operational works.
76.   It may be acceptable to the Council for further vegetation to be removed or lopped on the site
      or overhanging the site for safety reasons. For this purpose, a joint site visit shall be
      undertaken by the Manager – Land Use and the Developer to identify any such vegetation to
      be removed or lopped. The Developer may remove or lop additional trees only with the prior
      written consent of the Manager – Land Use subject to such reasonable conditions as may be
      imposed by the Manager – Land Use.
77.   All areas of vegetation and individual trees to be removed or lopped shall be clearly marked on
      the Site.
78.   A qualified and experienced arborist shall be present on site prior to construction work
      occurring in the vicinity of trees to be retained; and at least weekly during construction activity
      in these areas. The arborist shall provide advice regarding the retention of tree health and
      stability and this advice shall be implemented. Tree fence guards shall be erected at a 3m
      distance from the trunk (unless otherwise agreed with the Manager Land Use) around all trees
      to be retained and an inspection arranged with Council’s Environmental Planner prior to
      construction commencing.
79.   During construction of the Development the following areas shall be fenced using a 3 wire star
      picket fence 1.2 metres in height for the purpose of preventing access beyond these areas
      and thereby protecting vegetation on Site:
      79.1. an area defined by a radius of 3m to all identified trees to be retained on the approved
            plans, unless otherwise agreed by Manager Land Use;
                                                                                     Page 20 of 59

Page 21

                                                                                           2006/823

      79.2. the full Lot 888 eastern boundary located adjacent to the development area.
80.   A 1.8m min high chain mesh fence shall be erected along the 10m setback line located on the
      northern side of the intermittent creek (measured horizontally from the centreline of the
      intermittent creek), for the full length of the construction zone for Buildings I to F; prior to the
      commencement of any construction work on the site. The fence shall be setback a greater
      distance from the northern boundary of the creek to avoid trees or difficult topography on the
      10m setback alignment. No entry into the intermittent creek setback area is permitted except
      for environmental rehabilitation purposes and authorised stormwater infrastructure
      construction. No fill or construction rubbish shall enter this private open space setback area.
81.   The precise location and extent of the fencing referred to above shall be determined on-site
      during a joint inspection by the Developer and the Manager – Land Use. The fencing is to be
      maintained throughout the construction period and may only be removed with the agreement
      of the Manager – Land Use.
82.   Any diversion drains, dewatering activities or excavation work for foundations or basements
      that are installed during construction work on the site shall ensure that adequate groundwater
      seepage occurs so as to maintain the existing downslope vegetation in the intermittent creek
      by not detrimentally altering the existing downslope soil moisture regime. The Site Arborist (in
      conjunction with a professional hydrologist/ groundwater specialist as required) shall regularly
      monitor and provide advice on this matter.
83.   Adequate groundwater seepage shall be maintained at all times to ensure the existing natural
      vegetation in the intermittent creek and soil moisture regimes are not altered as a result of
      building activity.
84.   Retaining wall footings shall bridge the tree roots of existing trees to be retained where
      determined as necessary and practical by the Site Arborist, Site Civil Engineer - Design and
      Manager Land Use to retain stable and healthy trees on the site.
85.   The buildings and any retaining walls in the immediate vicinity of the bunya trees located near
      Building J shall incorporate particular design features to protect the roots of these trees from
      damage. The site arborist shall submit a report to Council discussing the impact of the
      building and building setback on the tree roots in conjunction with the Development
      Application for Operational Works.
86.   The construction of the eastern gabion wall shall minimise any detrimental impact on the
      vegetation in this area.
Vegetation Removal and Disposal
87.   Vegetation removal, tree felling and lopping shall be undertaken in an environmentally
      sensitive manner to avoid damaging surrounding vegetation, trees and habitat.
88.   Prior to felling or lopping all trees are to be checked for wildlife (eg Koalas, cockatoos,
      possums). If wildlife species are present, the tree shall not be felled or lopped until the wildlife
      has left the tree.
89.   All cleared vegetation shall be suitably processed and utilised on the site as mulch or removed
      from the Site at the Developer’s expense by a method approved by the Manager – Land Use.
Cryptocarya foetida
90.   The vulnerable plant Cryptocarya foetida and its habitat is not to be adversely affected by any
      activity associated with the construction and operation of the Development.
91.   The buffer area in the adjacent park Lots 104 & 105 (to the north of Building E) required to
      protect the known Cryptocarya foetida specimens and their habitat, during construction, shall
      not be interfered with.


                                                                                      Page 21 of 59

Page 22

                                                                                         2006/823

92.   The preservation of the Cryptocarya foetida and its habit shall be addressed in the Site
      Rehabilitation Plan, the Environmental Management Plan, the Construction Management Plan
      and the Fire Management Plan to the satisfaction of the Manager – Land Use. In particular,
      but without limitation, these documents shall provide for:
      92.1. all existing specimens and their habitat to be retained and protected;
      92.2. the south-eastern buffer area for Cryptocarya foetida is to be isolated prior to any
            construction activity by the erection of a 3 wire star picket fence 1.2 metres in height
            (together with appropriate signage) on the Site boundary to prevent all persons, with the
            exception of authorised persons, from entering or impacting upon the existing
            specimens and their habitat;
      92.3. the protective fence may be removed after the vegetation within the fenced buffer area
            has become robust and self-sustaining to the reasonable satisfaction of the Manager –
            Land Use.
      92.4. all persons working on the Site during the construction stage are to be informed of the
            requirements regarding the protection of the Cryptocarya foetida and its habitat, to sign
            an agreement to abide by these requirements and to be subjected to penalties for non-
            compliance with these requirements;
      92.5. if rehabilitation works in accordance with the Site Rehabilitation Plan are to be
            undertaken, the authorised persons doing the work shall be permitted to enter the area
            to undertake the work, subject to the conditions contained in those documents and so
            as not to adversely affect the Cryptocarya foetida plants or their habitat;
      92.6. the boulder fence shall be constructed within the Site, and shall not adversely affect the
            Cryptocarya foetida plants or their habitat;
      92.7. the Fire Management Plan shall specify the manner in which any fuel reduction or other
            fire prevention activities are to be undertaken in this area so as to minimise the impact
            on the Cryptocarya foetida plants and their habitat;
      92.8. Compliance with these requirements shall be addressed by the community
            management statement for any and all relevant bodies corporate having control of any
            part of the Site.
Weed and Pest Species Control
93.   In order to protect the adjacent Noosa National Park and the Environmental Values of the Site:
      93.1. prior to entering the Site, all construction machinery and vehicles shall be washed down
            to remove soil that may contain weed seeds, soil pathogens and pest species;
      93.2. all nursery stock shall be weed, pest and disease free and certified as such by the
            supplier;
      93.3. all imported fill, soil, gravel and other construction and landscaping materials shall be
            weed, pest and disease free and certified as such by the supplier;
      93.4. all mulch used on the Site shall be weed and pest free and certified as such by the
            supplier;
      93.5. all mulch produced on-site by mulching cleared vegetation and trees shall specifically
            exclude material (particularly seeds) from weed species (eg. lantana, asparagus and
            umbrella trees), invasive species and seeding parts of inappropriate species (eg.
            wattles); and
      93.6. the certificates referred to above are to be obtained prior to use of the material on Site
            and to be made available to Council.
94.   Soil disturbance in the Private Open Space Area (and any Public Open Space Area) shall be
      kept to a minimum to avoid weed proliferation.
                                                                                     Page 22 of 59

Page 23

                                                                                         2006/823

95.     Weed eradication and control will be an integral part of both the Site Rehabilitation Plan and
        the Landscape Management Report. Vegetation used in rehabilitation and landscaping shall
        exclude weed species.
Fauna Protection General
96.     The Landscape Management Report, Site Rehabilitation Plan, Fire Management Plan,
        Construction Management Plan and Environmental Management Plan shall prescribe the
        manner in which the fauna and fauna habitat on the Site and in the adjacent road reserve are
        to be protected and enhanced.
97.     No cats or dogs shall be permitted on Site during construction.
98.     Residents and guests shall not be permitted to keep cats or dogs on the Site.
99.     All community management statements for the Site shall contain a provision prohibiting cats
        and dogs on the Site.
100. Domestic animals and livestock shall be prohibited in the Private Open Space Area and on the
     Public Walkways through the Site.
101. Buildings and roads shall be sited and constructed to allow movement of fauna through and
     within the Site.
102. Any internal fencing and retaining walls on the Site shall be compatible with the movement
     requirements of Koalas and other fauna.
103. Suitable nesting boxes shall be provided and maintained on the Site.
Koala
104. Koala habitat trees in the mapped Koala Sustainability Area on the Site shall be protected,
     unless specific approval is given for the removal or lopping of a Koala habitat tree.
105. The Koala Conservation Criteria shall be generally complied with, with koala friendly fencing
     and koala friendly retaining walls to be utilised on the site; and koala food trees to be
     strategically located and planted in the landscaping (predominant rainforest theme).
106. The Landscape Management Report, the Site Rehabilitation Plan, the Fire Management Plan,
     the Construction Management Plan and the EMP shall give particular consideration to:
        106.1.the protection and enhancement of all Koala habitat;
        106.2.the protection of Koalas using this habitat area during construction and operation;
        106.3.the protection and enhancement of existing and new vegetation to facilitate Koala
              movement throughout the entire Site.
107. All retaining walls (excluding any cribb walls) with a height in excess of 0.8 metres shall have
     timber posts or other Koala access structures installed at 10 metre intervals. The posts must
     have a minimum diameter of 200 millimetres.
108. All community management statements for the Site shall contain a provision requiring all
     persons bound by the community management statement to protect Koala habitat areas.
109. All community management statements for the Site shall contain a provision prohibiting dogs
     and cats on the Site.
110. A Koala Management Plan shall address the following to the reasonable satisfaction of the
     Manager – Land Use:
        110.1.all the relevant matters mentioned in these conditions and the following, without
              limitation:
              110.1.1. minimisation of the loss of koala food trees and Koala habitat trees on the
                       Site;
                                                                                     Page 23 of 59

Page 24

                                                                                      2006/823

            110.1.2. facilitation of Koala movement throughout the entire Site;
            110.1.3. planting of additional Koala food trees and Koala habitat trees as part of the
                     Site Rehabilitation Plan and Landscape Management Report;
            110.1.4. all fencing on Site to be compatible with Koala movement requirements.
111. The management plan shall be submitted to Council in conjunction with an application for
     Operational Works- Landscaping for the Site.
112. The Developer shall not commence any development on Site until the management plan is
     approved by the Manager – Land Use. The approval of the Manager – Land Use is not to be
     unreasonably withheld.
113. The Developer shall comply with the management plan and compliance with the management
     plan shall be addressed by the community management statement of any or all bodies
     corporate having control of any part of the habitat area.
114. The Developer may amend the management plan only with the prior written approval of the
     Manager – Land Use, which approval shall not be unreasonably withheld.
Red-tailed Black Cockatoo
115. Known Red-tailed Black Cockatoo feed trees adjacent to the eastern boundary of the Site
     shall be protected.
116. During construction, a 75m radius buffer delineated by appropriate signage shall be provided
     around all known Red-tailed Black Cockatoo feed trees (refer to Figure 2).
117. Rehabilitation works in this buffer area shall only proceed at times when the Red-tailed Black
     Cockatoos are absent.
118. Construction of the buggy track within this buffer area shall not proceed when the Red-tailed
     Black Cockatoos are feeding in these trees.
119. Construction of the buggy track shall not adversely impact upon the Red-tailed Black
     Cockatoo feed trees or their root systems.
Environmental Linkages and Corridors
120. The corridors and environmental linkages shall be maintained, rehabilitated and enhanced to
     ensure they are viable and self-sustaining in the long-term and facilitate the protection of the
     adjacent National Park.
121. The Landscape Management Report and the Site Rehabilitation Plan shall facilitate the
     protection and enhancement of these corridors and environmental linkages.
122. Unless specifically shown on the approved plans, no construction works or associated
     activities shall be permitted in these areas.
National Park Protection
123. The Public Open Space Area and Private Open Space Area perform a buffer function between
     the Development on Site and the National Park.
124. The existing fence between the National Park and the Site shall be removed at the
     Developer’s expense only once the rehabilitation planting is established to the reasonable
     satisfaction of the Manager – Land Use and with the prior written consent of both the
     Queensland Parks and Wildlife Service and the Council, or alternatively retained if made safe
     and fauna friendly to the satisfaction of the Manager Land Use.
Intermittent Creek
125. The intermittent creek and its riparian and in-stream flora and fauna shall be protected,
     maintained and rehabilitated to enhance its Environmental Values.

                                                                                  Page 24 of 59

Page 25

                                                                                         2006/823

126. No development other than stormwater outlets shown on the approved plans shall be
     permitted within a 10m wide buffer area on both sides of the intermittent creek (measured
     horizontally from the centre line of the intermittent creek). This includes tracks, sediment
     ponds, erosion control devices, etc. Erosion control and bank stabilisation devices shall not
     be constructed within the intermittent creek bed without the prior approval of the Manager –
     Land Development.
127. The existing hydrological regime of the intermittent creek shall not be significantly altered.
128. The long term water quality within the intermittent creek will be in compliance with the
     ANZECC Protection of Aquatic Ecosystem guidelines for the protection of in-stream fauna and
     their habitat.
Freshwater Habitat Feature and Environs
129. The freshwater habitat pond shall be specifically vegetated and managed to provide habitat for
     frogs, aquatic birds and other native fauna. It will have a subsidiary role as a polishing pond
     but will not be used for primary stormwater treatment for the Site.
130. The Developer shall prepare and implement the Freshwater Habitat Management Plan which
     shall include the following details:
      130.1.operational details;
      130.2.rehabilitation details for both the pond and surrounding vegetation;
      130.3.weed control and mosquito control procedures;
      130.4.protection of the downstream creek environment;
      130.5.water quality standards and required monitoring during the resort site construction and
            operation stages;
      130.6.performance standards that will identify when the new habitat area is functional as an
            aquatic habitat;
      130.7.maintenance and de-silting requirements and procedures; and
      130.8.how public access and public safety issues will be addressed.
Buffer Areas
131. The following buffer areas are required to protect the Environmental Values of the Site:
      131.1.a 10m wide buffer area on both sides of the intermittent creek (measured horizontally
            from the centre line of the creek);
      131.2.75m radius buffer area (delineated by appropriate signage) around known Red-tailed
            Black Cockatoo feed and nesting trees during construction;
      131.3.the Cryptocarya foetida plants in the intermittent creek;
132. Unless specifically shown on the Drawings or specified in these Conditions, no construction
     works or associated activities shall be permitted in these areas.
133. During construction, all buffer areas shall be clearly identified and delineated on the ground in
     accordance with these Conditions.
Landscape Management Report
Preparation
134. A Landscape Management Report shall be prepared for the site by an experienced landscape
     architect in conjunction with a person holding appropriate horticultural qualifications. The
     Landscape Management Report shall be prepared to the reasonable satisfaction of the
     Manager – Land Use.

                                                                                     Page 25 of 59

Page 26

                                                                                        2006/823

135. The following statements of principle apply to the preparation of the Landscape Management
     Report:
      135.1.The Landscape Management Report shall demonstrate a high level of environmental
            care and responsibility and be consistent with best practice for developments of this
            type in similar environments.
      135.2.The Landscape Management Report shall be based on sound ecological and
            environmental principles and shall specify how the Environmental Values of the Site will
            be protected, maintained and enhanced.
      135.3.The Landscape Management Report shall specifically acknowledge and demonstrate
            how the visual and aesthetic values of the Site and adjoining National Park will be
            maintained and enhanced.
      135.4.Plant schedules will primarily utilise native species that have been recorded on the Site,
            and primarily utilise advanced stock.
      135.5.The Landscape Areas will be integrated floristically and structurally with adjacent
            existing and rehabilitated vegetation.
      135.6.The Landscape Management Report shall be generally consistent with Council’s
            Planning Scheme Policy 1 – Landscaping Guidelines, except that plants that are not
            endemic to Noosa Shire or this coastal locality, environmental weeds, aggressive
            colonisers and plants that encourage inappropriate fauna species, shall be excluded
            from the plant schedules.
      135.7.The Landscape Management Report shall not utilise plant species that pose a risk to
            the adjacent National Park.
136. The landscape theme in each of the Landscape Areas shall be:
      136.1.Resort – rainforest;
      136.2.Viewland Drive entrance – rainforest.
137. The Landscape Management Report shall address the following issues:
      137.1.enhancement of environmental linkages and corridors;
      137.2.creation of new fauna habitat with special consideration of Koalas, Glossy Black
            Cockatoos, and the Richmond Birdwing Butterfly;
      137.3.creation of new habitat for Cryptocarya foetida and Macadamia integrifolia where
            practical;
      137.4.visual screening of buildings and visual integration of the built environment;
      137.5.the use of stone or dark colours in retaining walls.
138. The Landscape Management Report shall detail the planting schemes and plant schedules for
     all Landscape Areas and shall detail, inter alia:
      138.1.site preparation;
      138.2.construction materials and details;
      138.3.weed control;
      138.4.stock specifications and supply;
      138.5.erosion and sediment control;
      138.6.planting out procedures and horticultural requirements;
      138.7.mulching procedures;

                                                                                    Page 26 of 59

Page 27

                                                                                       2006/823

      138.8.fertilising procedures;
      138.9.irrigation and watering procedures;
      138.10.standard of landscaping;
      138.11.staging and timing;
      138.12.on-going maintenance;
      138.13.environmental safeguards;
      138.14.performance standards.
Approval
139. The Landscape Management Report shall be submitted to Council prior to or with the
     lodgement of any development applications for landscaping or rehabilitation works with
     respect to the Landscaped Areas.
140. The Developer shall not commence any hard or soft landscaping works within the Landscape
     Areas until the Landscape Management Report is approved by the Manager – Land Use.
141. The approval of the Manager – Land Use is not to be unreasonably withheld.
Implementation
142. Any application for operational works for landscaping shall be consistent with the approved
     Landscape Management Report.
143. The landscaping of the Site is to be completed in accordance with the Landscape
     Management Report prior to any part of the Site being occupied and is to be maintained at all
     times thereafter to the reasonable satisfaction of the Manager – Land Use.
144. The Developer may amend the Landscape Management Report only with the prior written
     approval of the Manager – Land Use, which is not to be unreasonably withheld.
Contaminated Soil Remediation
145. Contaminated soil material located on the site shall be relocated to an authorised location off-
     site or relocated on-site and capped in accordance with the requirements of the Environmental
     Protection Agency. No infrastructure services are to be located through the remediation area,
     and a third party environmental auditor is to review and provide an environmental audit of the
     work undertaken.       The area is to be remediated to the reasonable satisfaction of the
     Environmental Protection Agency.
Other Services
146. The Developer shall provide Electricity, a TV antennae system and Telecom reticulation to the
     Site. All electricity and Telecom services shall be provided underground.
Scooters & Buggies
147. Scooter and Buggy maintenance shall occur off-site.
General
148. Operation of facilities for functions or dining involving guests staying at the Resort will be in
     accordance with any licence for the facilities to be issued by the Queensland Liquor Licensing
     Division pursuant to the Liquor Act 1992.
149. Any advertising sign or device is to comply with the provisions of Council’s Local Law on
     advertising.




                                                                                   Page 27 of 59

Page 28

                                                                                       2006/823

150. The Developer shall pay such fees as may be determined by Council for time spent by Council
     officers in the investigation, consideration and determination of any report, survey, plans or
     drawings or any other matter submitted to Council for its consideration or approval under
     these Conditions. The Developer shall further pay all reasonable inspection and monitoring
     fees of Council officers. Unless otherwise specified herein, all reasonable fees shall be paid
     within 14 days of Council submitting an invoice for the same. If for these purposes Council
     considers it necessary to brief an external consultant, the Developer will not be responsible for
     the external consultant’s fees unless there has been prior consultation and agreement
     between the Developer and Council regarding the proposed consultant and the fees to be
     charged.
151. The Council officers may at any time during periods when construction, rehabilitation or
     decontamination activities are occurring on Site with prior notice to the Developer (except in
     the case of an emergency when no notice is required) enter the Site. The entry may be for the
     purpose of monitoring compliance with the Conditions, carrying out inspections, attending on-
     site meetings or otherwise for purposes specified in these Conditions. All reasonable costs
     associated with the Council officers attending on Site shall be paid by the Developer within 14
     days of the Council submitting an invoice for the same. There shall be prior consultation
     between the Council and the Developer about inspection arrangements and reporting and the
     costs for these inspections.
152. All monies required to be paid by the Developer, if not so paid, on or before the due date, shall
     become a debt due and owing to the Council which may be recovered by the Council in any
     Court of competent jurisdiction.
Amenity
153. There shall be no substantial detrimental effect upon the amenity of the neighbourhood by
     reason of the creation of excessive noise, lighting nuisance or other emissions by or from the
     Development.
154. During the operational phase of the Development deliveries and waste collection will be
     restricted to the hours between 8:00am and 5:00pm Monday to Saturday.
155. Gaseous or particulate emissions to the air, during the operational phase of the Development
     are to comply with relevant limits contained in the Environmental Protection (Air) Policy 1997.
ENVIRONMENTAL HEALTH
Flammable & Combustible Liquids
156. Approval for the Underground Petroleum Storage System should be obtained under the
     Dangerous Goods Safety Management Act 2001 and the Environmental Protection Act 1994.
     The application for such approval should be lodged with Council’s Environmental Health
     Section and includes an assessment by a competent person of the site’s class pursuant to
     Council’s “Operators Compliance Guide for Petroleum Product Storage”.
157. An annual licence is required from Council’s Environmental Health Section with respect to the
     storage of flammable/combustible liquids in excess of the minimum amounts permitted under
     the Dangerous Goods Safety Management Act 2001. Application for a DGSM licence should
     be made at the time of submission of a development application for building works and you
     must include all relevant plans and specifications.
Food Premises
158. Where any food premises is included in a development, the following is required:
      158.1.Plans and application is to be made to Council’s Environmental Health Section for
            approval prior to any building approval, fitting out or use of the premises. Adequate
            kitchen area and associated food storage shall be provided for the restaurant,
            conference room and resort of a minimum of 159m². Example has been provided in
            JMA Architects drawing No. 1013 DA – 03 – V – 08 dated 2/11/06.
                                                                                   Page 28 of 59

Page 29

                                                                                        2006/823

      158.2.Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must
            obtain a Food License from Council, prior to use of those premises.
Skin Penetration
159. The operator of any body piercing or tattooing business should comply with the Public Health
     (Infection Control for Personal Appearances Services) Act 2003 and:
      159.1.Obtain a licence to operate prior to commencing the use.
      159.2.Comply with the Infection Control Guidelines of the Act.
      159.3.Premises to comply with Part 15 of the Queensland Development Code.
Beauty Treatment/Hairdressing
160. The operator of any beauty treatment and/or hairdressing business should comply with the
     Infection Control Guidelines of the Public Health (Infection Control for Personal Appearances
     Services) Act 2003.
Waste Disposal
161. The development refuse will be serviced in accordance with the Waste Management Code
     provided in Volume 11 Code Responses, subject to the conditions contained below:
      161.1.All waste from the resort is to be collected by Council’s waste contractor from the
            central refuse/recycling area adjacent to V Block. No waste will be collected by
            Council’s contractors from the individual units/villas.
      161.2.Recycling will be provided on a fortnightly basis to the residential component of the site
            by Council’s waste contractors
      161.3.Council will supply all 240l-recycling bins.
      161.4.The garbage rate for the compactor bin will be based on a component for each unit or
            residence equivalent to a private residence to cover costs other then the waste
            contractors service fee, a component for provision and servicing of the compactor bin.
      161.5.Council’s waste contractors will own, service and maintain the compactor bin and clean
            during service for a price to be specified by Council.
      161.6.The developer shall enter a lease agreement with the waste contractor for the supply
            and maintenance of this compactor bin.
      161.7.The compactor shall be serviced at a minimum frequency of once per week and Council
            will nominate the service day to ensure service provision and be structured within
            existing runs for the Ro-Ro collection vehicle. Additional services can be organised with
            24 hours notice.
      161.8.The compactor bin shall be refrigerated or more frequently serviced to avoid odours and
            fly problems.
      161.9.The developer will be responsibility for cleaning of all other bins.
      161.10.The developer shall purchase and maintain all other bins.
      161.11.The developer must provide a suitable bin wash area for the cleaning of all types of
             bins and waste collection vehicles used on the site. The area is to be roofed and the
             floor is to fall to a bucket trap with the waste pre-treated by a grease arrestor prior to
             discharge to sewer.
      161.12.All street litter bins located throughout the development are to be supplied and
             serviced by the developer.
162. Prior to the approval of various stages of works, the following additional details are required to
     be supplied and approved by Council Officers:
                                                                                    Page 29 of 59

Page 30

                                                                                        2006/823

162.1 A Waste Management Plan (construction) shall be submitted to Council as part of the
      Construction Management Plan and approved by Manager Land Development prior to
      the issue of operational works.
      A Waste Management Plan (construction) is also required for construction of 15 or more
      dwelling units or for any business use of greater than 500m².
      Waste Management Plans (construction) is required to be submitted in accordance with
      Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable
      and waste materials. These shall be located so that they are convenient and safe to
      use. (Refer to Noosa Council Waste Management Code).
      The Plan shall contain the following information:
      162.1.1 The site area for the storage and separation of waste is to be shown on the
              plan drawings accompanying the application.
      162.1.2 A waste management table as indicated below is to be completed showing
              how waste material is to be segregated - recycled – reused or disposed.
       MATERIALS ON-SITE                 DESTINATION
                                         Re-use and Recycling                   Disposal
       Expected          Estimated       On-site         Off-site               *specify contractor
       waste             volume (m³)     *specify        *specify               and landfill site or
       materials                         proposed   re- contractor and          other disposal site
                                         use or on-site recycling outlet
                                         recycling
                                         methods
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber-please
       specify
       Plasterboard
       Metals        -
       please specify
       Asbestos
       Other - please
       specify

      The purpose of the Waste Management Plan is to facilitate the segregation of waste for
      the effective reuse and recycling of such materials. Additionally Council rewards those
      who segregate waste by significantly reducing disposal fees at the landfill, some items
      are free. Higher gate fees are charged for loads of mixed waste.
162.2 Prior to the approval of Building Works, the following additional details are required to
      be supplied and approved by the Manager Environmental Health:
      162.2.1      The details of the bin wash facility.
      162.2.2      The details of the buggy and trailer to safely transport all bins.
      162.2.3      Details of the villa roadside waste and recycle shelters.
      162.2.4      Details and location of all basement storage areas that are situated beneath
                   the refuse chutes.

                                                                                 Page 30 of 59

Page 31

                                                                                        2006/823

163. Adequate access and turn-a-rounds into the waste collection area, shall be provided for all
     waste and recycle vehicles as per JMA Architects drawing 1013 DA – 03 – V – 05, Issue 5,
     dated 2/11/06.
164. Adequate storage area for the waste and recycling shall be provided for the V Block waste
     collection area of minimum dimensions as per JMA Architects drawing 1013 DA – 03 – V – 05,
     Issue 5, dated 2/11/06.
Noise
165. Noise emissions during the operational phase of the Development from any mechanical plant
     or processes associated with the completed Development must comply with the following
     limits:
        165.1.7am to 10pm – LA max adj  LA bg + 5dBA; and
        165.2.10pm to 7am – LA max adj  LA bg + 3dBA.
166. Live amplified music and live amplified entertainment is to be provided only indoors, in such a
     manner that the sound from the activities is attenuated in accordance with the conditions of
     the relevant licence issued by the Queensland Liquor Licensing Division under the Liquor Act
     1992 and during the hours specified in such licence but in any event is not to be provided after
     midnight.
167. All indoor entertainment noise emissions shall comply with the following limits:
        167.1    6am to 10pm – LA10 adj  LA90 + 10dBA; and
        167.2    10pm to 6am – Loct 10  Loct 90 + 8dB.
168. The swimming pool (including any pool bar), and Health Spa are to be used only between
     7:00am and 9:00pm daily.
169. During the operational phase of the Development deliveries and waste collection will be
     restricted to the hours between 8:00am and 5:00pm Monday to Saturday.
170. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
     located in a manner that prevents a noise nuisance beyond the Site in accordance with the
     nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply
     for such offences.
171. The Developer must ensure that no builder or building contractor carries out building work on
     a building site in a way that makes or causes audible noise to be made from the building work
     on:-
        171.1.Monday to Saturday, before 7:00am or after 6:30pm; and
        171.2.Sunday or public holiday, at any time.
172. Bottles shall only be placed in the bottle bins in the Resort between the hours of 7:00am and
     10:00pm.
173. The operating hours of the Conference Room, Restaurant and Bars (excluding any pool bar)
     shall be as follows:
        173.1.Sunday to Thursday – 7:00am to 11:00pm (however the Restaurant may open at
              6:30am if required);
        173.2.Friday and Saturday – 7:00am to midnight (however the Restaurant may open at
              6:30am if required);
        173.3.Use of the external restaurant deck /conference overflow area for formal functions and
              conferences is to be limited to between the hours of 9.00am and 10pm.


                                                                                   Page 31 of 59

Page 32

                                                                                        2006/823

174. Notwithstanding these conditions, the Conference Room and Restaurant and Bars (internal
     areas and excluding any pool bar) may be used until midnight on any day of the week if the
     use is in connection with a conference being held at the Resort.
175. During the operational phase of the Development machinery including forklifts may only be
     operated between the hours of 8:00 am and 5:00 pm Monday to Friday unless they are
     operated in an enclosed space (eg within a basement) having sound attenuation.
176. Prior to the approval of Building Works, the following additional noise details are required to be
     supplied and approved by the Manager of Environmental Health:
      176.1     The location of mechanical equipment (air conditioners, refrigeration equipment or
                pool pumps etc) and how they will be installed to comply with Noosa Council’s Local
                Law No. 12 – Noise Nuisances and the Environmental Protection Regulations 1998.
Trade Waste
177. Liquid waste generated by industry, small business and commercial enterprises is referred to
     as Trade Waste and shall comply with the following:
      177.1.A trade waste permit shall be obtained prior to the discharge of trade waste to Council’s
            sewerage system.
      177.2.All trade waste requirements complying with Council’s Trade Waste Policy and including
            pre-treatment devices, must be shown on hydraulic plans submitted to Council for
            approval prior to issuing the development permit for building work.
      177.3.Vehicular access shall be provided to each grease arrestor and/or pre-treatment device
            for cleaning and servicing by Council’s contractor, and must allow vehicles to enter and
            leave the site in a forward direction as per Qantec McWilliam drawing No. 05B320
            SK.03 dated April 2006.
BUILDING SERVICES
178. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as
     amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from
     the dwelling to the pool enclosure is not permitted. Any pool fencing shall be coloured
     charcoal or dark earthy colours, or non-reflective green or grey glass (or clear glass for the
     lower level pools).
LAND DEVELOPMENT
Construction
General
179. The Developer shall cause the Principal Contractor to attend a pre-start meeting with the
     Manager – Land Development prior to commencement of any work on Site. At the pre-start
     meeting the Principal Contractor is to submit a copy of the Workplace Health and Safety Plan
     for the Development to Council for Council’s records. The Workplace Health and Safety Plan
     shall comply with the provisions of the Workplace Health and Safety Regulation 1997. The
     Principal Contractor and supervising engineer are responsible for compliance with the
     Workplace Health and Safety Plan. The Developer shall ensure that there is compliance with
     the Workplace Health & Safety Plan.
180. The Developer shall ensure the following steps are undertaken prior to commencement of any
     works on Site:
      180.1.The Principal Contractor shall give the Council Inspector seven days notice of intention
            to commence works.




                                                                                    Page 32 of 59

Page 33

                                                                                         2006/823

      180.2.The Principal Contractor or any of its subcontractors shall not undertake any works
            unless each such contractor has public liability insurance in the sum of $10,000,000 and
            copies of current public liability insurance policies are submitted to the Council
            Inspector.
      180.3.The Principal Contractor shall nominate a site representative and give the Council
            Inspector a telephone number on which the Inspector can reach the site representative
            any time 24 hours of the day.
      180.4.The site representative shall arrange to meet on-site with the Council Inspector to be
            informed of Council’s requirements for construction of access.
      180.5.All traffic signage, including that for safety during construction, shall be in accordance
            with the Manual of Uniform Traffic Control Devices and Department of Transport (Main
            Roads Division) Roadworks Signing Guide.
181. Construction activities are to be carried out only between 7:00am and 6:00pm Monday to
     Saturday, with no construction activities on Sundays and public holidays.
182. Construction works for the Site are to be only between the hours of 7:00 am and 6:00 pm
     Monday to Saturday, and not on Sundays and public holidays. Access to the Site for the
     purposes of heavy construction vehicles is to be only between these hours and queuing of
     heavy construction vehicles is not to occur in Viewland Drive prior to 7:00am.
183. Works are to be carried out in accordance with the EMP so as to prevent or minimise:
      183.1.dust nuisance to residents in the vicinity;
      183.2.transfer of dirt and debris on to existing roads; and
      183.3.excessive noise.
184. Attenuation of construction noise is to be provided in accordance with the following measures:
      184.1.site layout devised to maximise distances to adjoining residences;
      184.2.noisy equipment positioned to make best use of natural attenuation – distance and
            screening;
      184.3.‘silenced’ machinery to be specified; and
      184.4.noise mitigation requirements included in all sub-contract specifications.
185. The Developer shall submit to the Council travel routes for the movement of construction
     vehicles. Minor residential roads shall not be used for the movement of construction vehicles.
     Construction vehicles must not use Morwong Drive. The Developer is advised that there is a 9
     tonne load limit on Park Road and the Developer shall ensure that its contractors and
     employees are informed accordingly.
186. The Developer must, promptly after written request by the Council, carry out any necessary
     rectification works, at the Developer’s cost, on roads in the vicinity of the Site where it can be
     reasonably demonstrated that such roads have been damaged by construction vehicles
     involved in carrying out the Development.
187. There shall be no pile driving on Site.
188. There shall be no diesel powered crane structures erected or used on Site other than mobile
     cranes.




                                                                                    Page 33 of 59

Page 34

                                                                                       2006/823

189. There shall be no encroachment into the 10 metre creek setback zone. This requires that no
     construction works can occur in this 10 metre setback, for example no batters, no excavations,
     no pipelines, no silt fences or sediment controls, no diversion drains, no foundations, no
     retaining walls, no scaffolding, no access for construction etc are permitted within the 10 metre
     setback, except for the three stormwater outlets as shown on Drawing No. 05B320 SK.15
     Issue A titled “Proposed Stormwater Headwall Layout Plan” dated April 2006 and prepared by
     Qantec McWilliam. The construction works required to construct these outlets will be
     minimised and shall be contained within a 6 metre wide corridor.
Construction Sequencing
190. A Construction Sequencing Management Plan shall be submitted in conjunction with an
     Operational Works application for civil works. The report shall detail each stage required to
     construct the proposed civil works and methods of stabilisation and erosion controls to ensure
     that sediments do not enter the intermittent creek and Noosa Sound.
      This management plan shall be prepared in conjunction with operational works drawings
      which shall reflect the civil works staging. The plan shall also include detailed erosion and
      sediment control staging plans, to be submitted with Operational Works application.
191. Building works shall not commence until services, one coat primer seal on roadways, building
     platforms and retaining walls are completed and stabilised. These works shall be stabilised
     with turf or hydromulch in high risk area, grass seeding with 80% cover in low risk areas and
     with mulch or geotextile in areas that will be disturbed during building works. The applicant
     shall submit with the sediment and erosion control plans, details of the various risk areas
     across the site and associated methods of stabilisation for those differing risk areas.
192. The construction sequences are to be more or less sequential, although the construction
     period of some of the elements may overlap and there may be advance works which are
     common to all sequences and to the various separate components of the Development.
193. At all times the sequencing of construction and building works shall ensure that any areas that
     will be exposed for more than 10 business days shall be stabilised. Erosion and sediment
     control measures must be maintained for each stage and are of prime importance and shall be
     established prior to any other works being undertaken.
Sediment and Erosion Control Plan
194. A detailed staged Sediment and Erosion Control Management Plan shall be prepared
     specifically for the resort site by a Registered Professional Engineer of Queensland, having
     proper regard to the Environmental Values of the Site and requirements of the EMP and shall
     be submitted in conjunction with an Operational Works application for approval by the
     manager Land Development. The management plan shall detail at a minimum, the following:
      194.1.Staging of erosion and sediment control measures;
      194.2.Sizing of sediment basins and control measures;
      194.3.Clean water diversion provision around construction activity zones on- site;
      194.4.Locations of all interceptor drains and cut-off drains;
      194.5.Rehabilitation and remediation requirements; and
      194.6.Contingency plans.




                                                                                   Page 34 of 59

Page 35

                                                                                         2006/823

195. Sediment and erosion control plans shall be prepared in conjunction with the Sediment and
     Erosion Control Management Plan, to the reasonable satisfaction of the Manager – Land
     Development and in accordance with the Institution of Engineers Australia ‘Engineering
     Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in particular using
     Checklist No. 3 from that document. The sediment and erosion control plans shall cover all
     stages of the resort development (during the construction, establishment and operational
     phases) including rehabilitation and remediation of the resort site. These plans are to be
     submitted to Council in conjunction with Operational Works application.
196. Sediment basins and their batters and outlets for the site shall be located outside the 10 metre
     setback to the intermittent creek and with ARI 5 year piping to the intermittent creek.
197. The Developer shall not commence any development on the resort site until the Sediment and
     Erosion Control Plan is approved by the Manager – Land Development.
198. The Developer shall not commence any development on the resort site until the staged
     sediment and erosion control is in place as indicated in the approved staged sediment and
     erosion control plans.
199. The Developer may amend the Sediment and Erosion Control Management Plan only with the
     prior written approval of the Manager – Land Development, which is not to be unreasonably
     withheld.
200. The staged sediment and erosion control plans must have regard to the objective of
     minimising the transport of nutrients and sediment from the Site and providing pollution control
     measures which deliver an acceptable level of safety and health risks for the owner and
     occupiers of Lot 27 and the environment on Lot 27.
201. Sediment runoff from site disturbance during revegetation is to be monitored and localised
     effects are to be mitigated by use of a range of techniques including;
      201.1.additional mulching;
      201.2.spraying of disturbed areas with chemical binders or soil stabilisers;
      201.3.placement of jute mesh and other protective coatings on disturbed areas; and
      201.4.use of sediment fences down slope of revegetated areas.
202. The Development is not to restrict the natural flow of water in the southern intermittent creek
     running from the Site into Lot 27 or adversely affect its quality.
203. The Development is not to cause flooding from the southern intermittent creek onto Lot 27 or
     erosion of the bed or banks of the intermittent creek.
Stormwater Management
204. All stormwater drainage shall be collected on site and discharged so there is no worsening off-
     site during critical events. That is there shall be no net increase in the peak stormwater flows
     from all events, being Q1 to Q100 critical design events. Stormwater drainage permitted to
     drain from the site shall be discharged to the intermittent creek to protected outlets to ensure
     no scour occurs. Stormwater drainage shall be designed in accordance with Water Sensitive
     Design Principles and stormwater flows shall be dispersed as much as possible, without
     increasing risks of scour to the riparian buffer or creek.




                                                                                     Page 35 of 59

Page 36

                                                                                        2006/823

205. Roof runoff from any of the villas and other central buildings shall be directed to a rainwater
     storage system or tank (minimum storage 3000 litres per villa and for other uses minimum
                                          2
     storage calculated using 12 litres/m of roof area) that is installed to ensure water from the
     tank can be used for external uses (such as watering gardens, irrigation, ornamental ponds,
     water features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of
     toilets internal to the dwellings and buildings. All rainwater tanks are to be designed and
     installed in accordance with the Queensland Development Code (QDC), Part 25 – Rainwater
     Tanks, and shall be part of the plumbing application in conjunction with the building approval.
     The location and capacity of the tanks shall be clearly shown on the plans submitted for
     Building Works approval and any overflow shall be directed to the stormwater drainage
     system.
206. The applicant shall submit an analysis of water supply reliability for internal reuse of collected
     rainwater on the site with an application for Plumbing Works. This shall assess the
     requirements for dual plumbing to enable rainwater to be used for toilet flushing.
207. To ensure that polluted run-off does not enter the Noosa River, stormwater run-off from the
     carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or
     hose-down) collected in a grease/oil arrestor provided on site prior to being permitted to
     discharge into Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
208. All site stormwater drainage shall be by means of a gravity system.
209. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
     circuit television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to the issue of Operational Works
      approval and will be determined on the unit rate basis current at the time of approval.
Stormwater Management Plan
210. A Stormwater Management Plan generally in accordance with the “Viridian Noosa Hydrology
     and Stormwater Management Plan” dated 30 August 2006 and prepared by WBM Pty Ltd
     shall be submitted in conjunction with any Operational Works Applications for the site.
      The plan shall include details of an appropriate stormwater treatment system to achieve the
      water quality objectives and shall provide plans showing that all works are located outside the
      10 metre buffer to the intermittent creek.
      The Developer shall not commence any development on Site until the Manager – Land
      Development, approves the Stormwater Management Plan. The Developer may amend the
      stormwater management plans only with the prior written approval of the Manager – Land
      Development, which is not to be unreasonably withheld.

                                                                                    Page 36 of 59

Page 37

                                                                                      2006/823

211. The stormwater management plan shall take into account matters specified in section 19.4 of
     the Environmental Protection (Water) Policy 1997.
212. Key water quality objectives to be reflected in the stormwater management plan are the
     protection of aquatic ecosystems in both the intermittent creek draining the site and within the
     receiving waters and the Noosa River, as well as primary contact recreational standards within
     the receiving waters. This plan shall ensure the following water quality objectives are
     achieved prior to water exiting the stormwater system and entering the 10 metre buffer zone
     during construction and operational phases of the development:
      212.1      Suspended Solids < 50mg/L
      212.2      pH = 6.5 to 8.5
      and during operational phase of the development Total Phosphorous and Total Nitrogen
      reduced as per the requirement of the “Water Sensitive Urban Design – Developing Design
      Objectives for water sensitive urban development in South East Queensland” Version 1 – 12
      October 2006 details in its Table 2.1
213. The stormwater management plan for the entire Site shall address:
      213.1.Construction, establishment and operational phases.
      213.2.For the establishment and operational phases for the Resort, at least two per year event
            and three monthly campaign based water quality monitoring for:
              213.2.1. Total Nitrogen
              213.2.2. Total Phosphorus
              213.2.3. Suspended Solids & Turbidity
              213.2.4. pH
              213.2.5. Salinity
              213.2.6. Temperature
              213.2.7. Dissolved Oxygen
              213.2.8. Trash & gross pollutants
              213.2.9. Algal count and identification (on event basis and following monitoring to
                       ensure remediation is successful)
              213.2.10. Faecal coliforms
      213.3.The monitoring shall continue for a period of 3 years from completion of the final stage
            of construction.
      213.4.For the construction phase for the Resort, at least two per year event and monthly
            campaign based water quality monitoring for:
              213.4.1. Suspended Solids & Turbidity
              213.4.2. Temperature
              213.4.3. Salinity
              213.4.4. Trash & gross pollutants
              213.4.5. Dissolved Oxygen
      213.5.In addition to the above, inspections for erosion and deposition, and build up of trash
            and gross pollutants should be carried out on a weekly basis during the construction
            period and corrective measures implemented.


                                                                                  Page 37 of 59

Page 38

                                                                                           2006/823

      213.6.An operational phase water quality management plan shall be prepared to address
            basin landscape zone and water treatment device water quality maintenance
            requirements for stormwater management measures and devices, contingency
            measures for aquatic plant growth, loss of vegetation in swales and filter strips, pollution
            response and algal blooms and should include a mosquito management strategy.
      213.7.Responsibilities are to be clearly delineated.
      213.8.Non-compliance with prescribed water quality standards                should    trigger   the
            implementation of measures/further testing to rectify.
      213.9.Monthly reports on monitoring, incidents, corrective action and plan updates are
            required to be submitted to Council. These reports are to be submitted in a form
            acceptable to the Manager – Land Development and are to highlight any non-standard
            results.
      213.10. Any stormwater outlet to the creeks on the Site are to be stabilised with appropriate
              energy dissipation and local armouring. Regular monitoring of creek erosion is
              required with appropriate corrective action specified to ensure a stable creek system.
              All work to be undertaken to minimise impacts on the Environmental Values of the
              creek system.
214. The operational stage components of the stormwater management plan shall be included in
     the community management statements for all bodies corporate having control of any part of
     the Site and assign responsibilities for compliance in terms of the reasonable satisfaction of
     the Manager – Land Development.
215. The Developer shall provide details of the size and design of the necessary sediment basins
     for the control of sediment on the site within the Erosion and Sediment Control Plan and the
     Stormwater Management Plan.
216. Upper track flow diversions are to be designed to divert up to the ARI 10 year event or greater.
Water Quality
217. The Developer is to install water quality control devices generally in accordance with the
     Council’s Planning Scheme Policy and to achieve the specified water quality objectives for the
     site. Detailed plans and specifications are to be prepared and submitted (after consultation
     with officers of the Council) with the relevant applications for either operational works, building
     works, plumbing works or drainage works and are to be to the reasonable satisfaction of the
     Manager – Land Development.
Drainage
218. The Developer is to complete the drainage works progressively in conjunction with
     development of the site. Detailed drainage plans and specifications are to be prepared and
     submitted (after consultation with officers of the Council) with the relevant applications for
     either operational works, building works, plumbing works or drainage works and are to be to
     the reasonable satisfaction of the Manager - Land Development. All drainage works are
     required to be provided by the Developer at its own cost.
Boulder Fence
219. Prior to the commencement of building works in the areas to be protected by the boulder
     retention fences, the Developer shall construct steel boulder retention fences (being a
     Geobrugg rockfall protection system or similar) or other approved rockfall protection devices to
     the reasonable satisfaction of a Registered Professional Engineer of Queensland (RPEQ)
     specialising in geotechnical engineering. Certification by the RPEQ will be submitted to
     Council prior to the use commencing.



                                                                                     Page 38 of 59

Page 39

                                                                                         2006/823

220. The final locations of the boulder retention fences are to be determined on site by agreement
     between the Manager – Land Development and the Developer having regard to the protection
     of vulnerable plants and their habitat. Approximate locations of the boulder fences are shown
     on the Site Plan Drawing no.: 1013 DA-01-01 Issue 4 dated 30 August 2006 and prepared by
     JMA Architects.
Geotechnical
221. Conditions are to be undertaken:
      221.1.by an experienced Registered Professional             Engineer of Queensland             having
            geotechnical qualifications;
      221.2.to the reasonable satisfaction of the Manager – Land Development; and
      221.3.prior to lodgement of any development applications for building or operational works.
222. The Developer shall prepare and implement a treatment strategy for areas of existing fill with
     unknown compaction history, including reference to the expected extent of areas of
     disturbance. The intention of this strategy is to address areas of existing fill within the
     development area. This strategy shall be in accordance with requirements of the EPA and
     contaminated areas on the site.
223. The stability of the steep slopes above the proposed, Blocks A, B, C, D, E and G, shall be
     subject to a detailed assessment. The assessment shall include:
      223.1.sufficient sub-surface investigations to assess the depth of colluvial soils in these areas;
      223.2.circular and non-circular methods of analysis;
      223.3.the effects of groundwater as perched water tables and/or water filled tension cracks.
      Slope stabilisation measures, if required, shall be identified and implemented.
224. A qualified geo-technical engineer shall undertake further assessment of areas of fissured
     clays and provide details of engineering support that will reduce the risk of slope instability for
     the subject buildings. The type of engineering support shall be designed to ensure no impacts
     on existing vegetation, particularly within the 10 metre setback zone to the creek. An RPEQ
     shall design and certify that all footing excavations have been undertaken to best practice and
     are structurally sound for the site conditions.
225. An RPEQ shall design the footings for all building works that require earthworks within the
     fissured clay areas as identified by Golder Associates. The RPEQ shall certify that these
     footing designs are structurally sound for the site conditions.
226. The Developer shall provide to Council an assessment of the effects of de-watering of any
     basement excavations for the Resort buildings.
Filling and Excavation
227. Detailed plans and specifications based on and generally in accordance with the Engineering
     Drawings in relation to earthworks (and prepared after consultation with the Manager – Land
     Development) are to be submitted with the relevant applications for either plumbing, drainage,
     building or operational works.
228. All filling and/or excavation works are to be carried out strictly in accordance with any
     development permits for plumbing, drainage, building or operational works, and approved
     management plans.




                                                                                     Page 39 of 59

Page 40

                                                                                        2006/823

229. Retention systems for the Resort Central Facilities Building and the Resort Residential
     Buildings are to be as per details of geotechnical reports prepared by Golder Associates.
     Where required, excavated faces in rock should have appropriate ground support measures to
     contain potentially unstable rock wedges. These could include shotcrete, rock bolts, rock
     anchors or alternative engineering support systems. Certification shall be submitted to Council
     following building works detailing that the engineering support systems are stable and
     satisfactory for the life of the project.
230. Detailed plans and specifications detailing earthworks for all roads (and prepared after
     consultation with the Manager – Land Development) are to be submitted with the relevant
     applications for either plumbing, drainage, building or operational works.
231. Earthworks associated with all roads are to be completed in accordance with any development
     permits for plumbing, drainage, operational or building works, and approved management
     plans.
232. Retaining walls in the resort area are to make provision for Koala movement through the area,
     where applicable.
233. All proposed fill material is to be tested by an approved geotechnical testing authority (NATA
     registered) and the results submitted for approval by the Manager - Land Development.
     Compaction and fill is to be carried out under Level 1 supervision in accordance with
     Australian Standard – AS 3798 – 1996. Following completion of filling, compaction tests are to
     be certified by an RPEQ and certification submitted to Council. Development permits for
     building works will not be issued for areas of filling unless the fill compaction tests are to the
     reasonable satisfaction of the Manager – Building Services.
234. Filling that will result in the pondage of water on or off the Site (other than any works
     associated with the approved drainage system) will be prohibited.
235. All disturbed areas are to be revegetated within 10 days following completion of earthworks to
     reduce erosion and transport of sediments.
236. All material removed from the Site is to be disposed of in an appropriate manner and only at
     locations approved by a Local Government or the Environmental Protection Agency.
237. Contaminated soil currently contained within the containment cell on the site, shall be removed
     in accordance with Environmental Protection Agency requirements.
238. All material stockpiles on the Site must be in a location approved in the Environmental
     Management Plan or otherwise approved by the Manager – Land Development, which
     approval is not to be unreasonably withheld.
Civil Engineering
239. The earthworks and services for the resort must be confined to the perimeters of the
     developable area and shall not be located within the 10 metre buffer setback to the intermittent
     creek.
240. The Developer must bear the cost of alteration of any public utility or other facilities
     necessitated by the development of the Site or associated construction works external to the
     Site.
Public Walkways
241. The Developer shall construct the pathways to link Morwong Drive with Viewland Drive. The
     Public Walkways shall be built prior to the Resort use commencing.
242. The Public Walkways shall be a mixture of timber boardwalk, concrete pavement, and other
     materials subject to the satisfaction of Manager - Land Development.
243. The Developer is to provide lighting along the Public Walkway from the Morwong Villas to the
     southern end of Building Blocks E & F.
                                                                                    Page 40 of 59

Page 41

                                                                                       2006/823

244. The Public Walkway linking Morwong Drive with Viewland Drive is to have a minimum width of
     2 metres up to the Building Block V and a minimum width of 1.6 metres thereafter. In any
     sections where the public pathway is proposed to be a shared zone, speed limits shall be
     reduced to 10km/hr.
245. Detailed plans and specifications for the Public Walkway shall be prepared to the reasonable
     satisfaction of the Manager – Land Development.
246. An easement shall be created over the Public Walkways in favour of the Council. The
     easement shall be prepared by the Shire Solicitor at the cost of the Developer. The terms of
     the easement shall be to the reasonable satisfaction of the Shire Solicitor. In particular, but
     without limitation, the easement shall provide for:
      246.1.access for the Council, its servants, agents, employees and others authorised by the
            Council (including the general public) to pass and repass over the servient tenement at
            times of the day to be agreed by the Council and the Developer;
      246.2.the Developer is to be responsible for the repair, maintenance and rebuilding, if
            required, of the Public Walkway from Morwong Drive to Viewland Drive.
247. The Developer shall provide sufficient “wayfinding” signage to ensure pedestrians can easily
     navigate from Hastings St to Viewland Drive on the proposed public pathways through the
     site.
Private Walkways
248. The Developer may construct the private walkways as shown on the Site Plan to the outdoor
     viewing platform and pool and deck east of A Block.
249. The private walkways shall be constructed using timber boardwalk, stone, dark coloured
     concrete or such other materials subject to the approval of Council. The private walkways
     shall be constructed using minimum earthworks.
250. Detailed plans and specifications for the private walkways are to be submitted to Council for
     approval prior to the issue of a Development Permit for Operational Works- Landscaping for
     the Resort.
Sewerage
251. The site shall be connected to Council’s existing sewerage reticulation systems and be
     constructed in accordance with Council’s standards and requirements at no cost to Council.
252. The Developer must, at its own cost, construct a series of private reticulation sewers within the
     Resort, which are to be discharged into the proposed Council sewer main at an approved
     connection point.
Water Supply
253. The site shall be connected to Council’s existing town water supply and be constructed in
     accordance with Council’s standards and requirements at no cost to Council.
254. The applicant is advised that this development may require the provision of fire hydrants and a
     booster pump in accordance with the Building Code of Australia, and consultation may also be
     needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
     provided. To this end any necessary fire hydrants shall be clearly shown on the plans
     submitted for both Plumbing Works and Building Works approval and if a booster pump is
     deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
     order to provide boosting to the water supply.
255. Water supply to the Resort is to be by connection into existing water mains adjacent to the
     site.


                                                                                   Page 41 of 59

Page 42

                                                                                        2006/823

Other Services
256. The Developer shall provide Electricity, a TV antennae system and Telecom services to the
     resort. All electricity and Telecom services shall be provided underground.
257. All electricity and Telecom services are to be contained with the existing road reserve, external
     to the Site. The Developer is to provide street lighting on-site.
Traffic – External
Traffic Management Plan
258. The Developer shall submit a Traffic Management Plan prepared by a Registered Professional
     Engineer of Queensland specialising in traffic management for approval by the Manager –
     Land Development with the lodgement of any application for operational works for the Site.
259. The Traffic Management Plan shall include, but not be limited to, the following:
      259.1.construction vehicle management;
      259.2.the number of construction vehicle movements per day on Viewland Drive to ensure
            impacts on residents are limited;
      259.3.car park provisions during construction.
      259.4.limited access management during construction hours;
      259.5.signage management;
      259.6.operational vehicle management; and
      259.7.speed limit requirements.
Traffic Management for Morwong Drive and Viewland Drive
260. Access to the Resort is to be via Viewland Drive from 7:00 am to 7:30 pm and from Morwong
     Drive from 7:00 pm to 7:30 am.
261. Appropriate signage to the reasonable satisfaction of the Manager – Land Development and
     Manager Land Use advising guests, visitors, employees and invitees of the Resort of the
     access arrangements is to be erected. A sign shall be provided at the Morwong Drive cul-de
     sac head.
262. Guests of the Resort are to be informed at the time of making a reservation of the access
     arrangements on Site.
263. Emergency services, local taxi companies and bus and tour operators are to be informed of
     the access arrangements on Site.
264. The Developer is to provide sufficient information at the Morwong Drive entrance to the Resort
     and at the Viewland Drive entrance to the Resort to enable a person seeking to enter the
     Resort to locate the alternative access if the access initially chosen by the person is closed.
265. The Developer must construct, to the reasonable satisfaction of the Manager – Land Use, a
     control mechanism and sufficient turning movements on Site to ensure the split time access
     regime is enforced. Such control mechanism will include control barriers that cannot be
     operated by guests or visitors of the Resort to gain access to the Resort outside of the hours
     specified in these conditions. A gate shall be installed at the northern end of the resort access
     road (Alma Way) on Lot 888 where it joins with Morwong Drive but south of the Halse Lodge
     entry and shall be accessible at all times to the residents of the ‘Viridian Residences’ on Lot 13
     on SP151409; or alternatively the gate shall be installed in a location to the reasonable
     satisfaction of the Manager Land Development.
266. Vehicles must not be driven on Alma Way after 7:00pm or parked on Alma Way at any time
     south of the southern most gate, ie between that gate and the Viewland Drive exit.

                                                                                    Page 42 of 59

Page 43

                                                                                       2006/823

Morwong Drive
267. No construction vehicles are to use Morwong Drive for access to the Site.
Alma Way
268. Entry to the Resort Site is not to be constructed as a cross-over, but as a street extension with
     different pavement to distinguish entry and appropriate signage to be installed, subject to the
     approval of the Manager – Land Development, which approval shall not be unreasonably
     withheld.
269. The formal entry will be positioned so it does not cause vehicles to egress in reverse when
     access is prohibited from Morwong Drive.
270. Details of any proposed estate entrance sign shall be submitted in conjunction with an
     application for a development permit for operational works for either road works or
     landscaping. The applicable fee at the time the application is made shall accompany the
     application.
Viewland Drive
271. Immediately following the completion of construction of the Resort, the Developer shall reseal
     Viewland Drive with a minimum 30mm thick AC surface seal to Council specifications from
     Noosa Drive to the uphill side of the access facility in accordance with best practice methods.
272. The entry from Viewland Drive will allow queuing of at least four cars clear of the road entering
     the Site from the street. It will also cater for turnaround facilities on the entry side of the
     gatehouse.
273. Vehicular access is to be focused on the Resort Central Facilities Building – V Block, which is
     to provide the formal entrance destination. The balance of the Resort is to be serviced by way
     of a series of internal roadways.
274. Details of any construction works described in this condition are to be included in an
     application for a development permit for carrying out operational works.
275. Details of any proposed estate entrance sign shall be submitted in conjunction with an
     application for a development permit for operational works for either road works or
     landscaping. The applicable fee at the time the application is made shall accompany the
     application.
Traffic – Internal
276. Detailed plans and specifications for all Internal Roads are to be submitted with the relevant
     applications for either operational works or building works.
277. The maximum width of internal roads is to be 5.5 metres. The maximum desirable grade of
     the internal roads is 15 percent as per Council’s Planning Scheme Policy PSP5. Details of any
     sections where the grade is proposed to be greater shall be submitted with Operational Works
     application for roadworks, together with justification for this non-compliance with Council’s
     Policy.
278. All retaining walls and bridge design and construction are to be certified by a Registered
     Professional Engineer of Queensland for the life of the development.
279. The internal road design must meet the technical criteria contained in the Queensland Streets
     Manual to establish vertical and horizontal geometry for access routes.
280. A speed limit of 20km/h will be imposed throughout the Resort. If in practice vehicles in Alma
     Way frequently exceed the 20km/h speed limit or cause a noise nuisance to neighbouring
     residents further reasonable measures to control the speed of vehicles are to be implemented
     at the direction of the Manager – Land Development.


                                                                                   Page 43 of 59

Page 44

                                                                                         2006/823

Driveway Access
281. Detailed plans showing driveway accesses to each villa and car park and specifications are to
     be submitted with the relevant applications for either operational works or building works and
     are to be to the reasonable satisfaction of the Manager - Land Development.
282. All driveway accesses shall be designed and constructed to Council’s design standards,
     AS2890.1-2004 and Queensland Streets and to grades that prevent vehicles from scraping
     and/or bottoming whilst also allowing pedestrians movements along the footpath without any
     level difference. Should any driveways be constructed to grades that do not comply with
     AS2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
     that do comply.
283. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
     the driveway and any associated fencing or vegetation near the driveways shall comply with
     the minimum sight line requirements as defined in AS2890.1, section 3.2.4.
      The application shall demonstrate compliance with AS2890.1, section 3.2.4, for the basement
      entrances of Buildings V, D and other relevant accesses to buildings and the interactions with
      the public pathway internal to the site, illustrating these sight lines on the plans submitted for
      Operational Works approval.
Carparking
Off Street
284. A Car Parking Management Plan shall be submitted to Council and shall be to the reasonable
     satisfaction of the Manager Land Use prior to the issue of a development permit for
     Operational Works detailing, at a minimum:
      284.1.Compliance with AS2890.1-2004,
      284.2.Construction parking provisions,
      284.3.Operational on-site carpark provisions addressing the following issues:
             284.3.1.     Parking spaces within the Resort will not be titled, other than Resort Villa
                         (Block A, B, C, E, F & J) Garage spaces. Resort Villa Car parking spaces
                         shall remain within the pool of car parking spaces for the resort at all times;
             284.3.2.     The theatrette located in Building D will be used for resort operations only
                          and will not be available for public use;
             284.3.3.     At check-in, guests (with cars) will be allocated a parking bay for the
                          duration of their stay. Guests will be advised of their allocated parking bay
                          location and provided with details how to access this parking space;
             284.3.4.     At check-in guests will be advised that any external visitors they may invite
                          to the site shall utilise the available at-grade parking spaces or contact
                          reception to be allocated a short-term parking space;
             284.3.5.     During peak times guest carparking spaces may not be located within the
                          same building as their accommodation unit (if staying within Buildings D,
                          G, H or I);
             284.3.6.     All tandem carspaces shall be managed by valet carparking or other
                          arrangements satisfactory to Council;
             284.3.7.     Persons without cars shall be allocated rooms wherever possible in
                          Buildings I or H.
             284.3.8.     Carspaces in Building V and I shall be made available and directions
                          erected for restaurant and conference room external customer use in
                          order to meet demand;
                                                                                     Page 44 of 59

Page 45

                                                                                        2006/823

              284.3.9.    A 22 seat bus shall be available to provide a shuttle service at all times as
                          required;
              284.3.10. The 4 car spaces located in the immediate vicinity of resort reception will
                        be limited to drop-off and pick-up and reception functions;
              284.3.11. Staff carparking will be allocated whenever possible to tandem spaces
                        including those in Building V or otherwise in basement carparks.
              284.3.12. A minimum of 11 spaces in the immediate vicinity of the Health Spa will be
                        clearly signed for Health Spa Parking only. When booking spa treatments,
                        external guests will be advised of the proximity of Health Spa to Hastings
                        Street, the direct pathway network between the Spa and Hastings Street
                        and the limited amount of parking provided on site.
              284.3.12. Upon booking a reservation, guests (particularly inter-state or international
                        visitors) will be encouraged not to use a motor vehicle (ie. hire car) during
                        their stay. The guest will be advised of the provision of all essential
                        services within close walking distance of the resort;
              284.3.13. An airport pick-up/drop-off service between the site and Maroochy Airport
                        will be provided. This service will be offered on an as-needed basis.
              284.3.14. Conference attendees not utilising on-site accommodation and not located
                        within walking distance of the site will be advised that there is no on-site
                        parking facilities and offered a morning and afternoon shuttle bus service;
              284.3.15. The resort will provide a minimum of 10 scooters for the exclusive use of
                        guests; and
              284.3.16. Resort staff will be encouraged to utilise non-private car modes such as
                        walking, cycling and public transport. It is noted that the site is well
                        positioned with relation to Noosa’s public transport and pathway network.
285. Carparking shall be provided within the site as shown on drawing number 1013 DA-01-09
     Issue 5 dated 28 November 2006 prepared by JMA Architects Pty Ltd, except as modified
     herein.
286. A minimum of 320 carpark spaces, of which 292 are covered carpark spaces, 28 are
     uncovered; maximum 66 (33 x 2), are tandem spaces, shall be provided on site, including 9
     clearly defined disabled carpark space. Parking spaces within the Resort shall not be titled,
     with exception of the Villa Garages Car parks, which may be titled however shall remain as
     part of the Resort car parking pool.
287. A minimum of 39 scooter park spaces will be provided on site.
288. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
     user class 2 with allowance for vehicles to enter and leave the site in a forward gear and with
     a minimum head clearance (headroom) at any point of 2.2m.
289. The proposed turning area at the end of any aisle shall be line-marked with chevrons and
     have the words “No Parking” painted on the pavement. A sign shall also be provided to
     indicate that the area is a “Turning Area Only” and that “No Parking is Permitted”.
290. All carparking shall be kept, maintained and line-marked in a condition fit for use.
291. The parking areas and access to the areas must be paved or sealed to the reasonable
     satisfaction of the Manager - Land Development.




                                                                                    Page 45 of 59

Page 46

                                                                                        2006/823

292. The operator of the Resort shall provide adequate carparking spaces on site for staff of the
     Resort, alternatively staff may utilise the 22 constructed street-side bays on Viewland Drive
     detailed in SK 2004 Issue C. The operator shall not instruct staff to park elsewhere off-site.
     The community management statement for any or all bodies corporate having control of any
     part of the Resort shall reflect this condition.
293. The operational phase of the Resort following completion of construction, shall comply with the
     following:
      293.1.Buses are to be limited to 22 seat capacity shuttle buses.
      293.2.Delivery vehicles for provisions, linen, etc are to be rigid vehicles not exceeding
            11 metres in length.
      293.3.Garbage removal vehicles are to be limited to standard garbage trucks and/or standard
            vehicles for the delivery/removal of garbage compacters.
      293.4.Service garbage and delivery vehicles may operate only between the hours of 8.00am
            and 5.00pm Monday to Saturday.
Attunga Heights - Lot 27 on RP89506.
294. The future use of Alma Way and adjacent public pathways (including connections) by vehicles
     and pedestrians ingressing/egressing Lot 27 on RP89506 is to be in accordance with the
     relevant conditions imposed in the Development Approval granted by the Minister for Local
     Government and Planning in respect of Lot 27 on RP89506. Access shall be permitted in
     accordance with these conditions.
Earthworks
295. All earthworks are to be undertaken in accordance with approved engineering drawings and
     shall be certified by a suitably qualified Registered Professional Engineer of Queensland at
     design and constructed stage.
296. All related management plans will be complied with during the performance of the earthworks.
297. No earthworks shall occur within the 10 metre setback to the intermittent creek.
298. All earthworks shall be part of an operational works application in accordance with the
     Integrated Planning Act 1997.
299. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
     Engineering Design Standards Manual and so as not to cause the additional ponding of water
     on any adjoining lands or the blockage of, or interference with, any natural watercourses.
     Detailed site surveys indicating natural surface levels and contours of the adjoining properties
     must be provided with the application for a Development Permit for Operational Works for
     Filling and Drainage.
      This may require the design and construction of drainage pipes and/or an overland flow-path
      within the development site that caters for drainage from the adjoining sites for a design storm
      with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
      Water encompassing the drainage pipes or overland flow-path will also be required. In this
      regard a Development Permit for Operational Works shall be obtained.

      Should evidence be provided to Council indicating that no additional ponding of stormwater
      will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
      path and easement shall not apply.




                                                                                   Page 46 of 59

Page 47

                                                                                              2006/823

Certification
300. All engineering, stormwater management and building works described in this development
     approval are to be certified by a suitably qualified Registered Professional Engineer of
     Queensland at both the design and the construction stage. The certification should show that
     the engineer is satisfied that all construction has taken place in accordance with the design
     and the relevant Australian Standards and used best practice methods.
Fire Management Plan
301. A fire management plan shall be prepared by a suitably qualified person with proven expertise
     in the preparation and implementation of fire management plans, stating recommendations for
     reasonable and practicable fire protection measures.
302. The fire management plan may be prepared in conjunction with the Noosa Fire Brigade, if they
     are willing to assist.
303. The Fire Management Plan shall demonstrate a high level of environmental care and
     responsibility and be consistent with best practice for developments of this type in similar
     environments.
304. The Plan shall meet the provisions of the Queensland Fire and Rescue Authority Act 1990.
305. The fire management plan shall address the following matters to the reasonable satisfaction of
     the Manager – Land Use:
       305.1.expected behaviour of fire on the Site;
       305.2.fire hazard management actions and risk minimisation strategies;
       305.3.fuel load management and consequent fire hazard within vegetated areas;
       305.4.setback zones, proposed building construction methods, materials and design;
       305.5.gutter treatment to avoid the collection of leaves;
       305.6.fire hydrant locations;
       305.7.access for fire fighters;
       305.8.landscaping measures to reduce fire risk;
       305.9.access between structures and vegetated areas;
       305.10. fire suppression and evacuation procedures;
       305.11. how the ecological values, vulnerable plant species, habitat values and the visual and
               amenity values of the vegetation will be retained/protected;
       305.12. required infrastructure - vehicle access tracks, fire breaks, hydrants, etc;
       305.13. maintenance requirements for the above infrastructure;
       305.14. how fires on-site will be prevented from crossing onto the adjacent National Park and
               adjoining residential properties;
       305.15. coordination with Queensland Parks and Wildlife Service’s fire management activities
               and procedures;
       305.16. coordination with other relevant organisations and agencies;
       305.17. owners and operators training and responsibilities;
       305.18. implementation procedures.
       The fire management plan shall be submitted to Council in conjunction with an Operational
       Works Application with respect to the Site.

                                                                                      Page 47 of 59

Page 48

                                                                                      2006/823

306. The Fire Management Plan shall be approved by the Manager – Land Use.
307. The Developer shall comply with the fire management plan and compliance with the fire
     management plan shall be addressed by the community management statement of any or all
     bodies corporate having control of any part of the Site.
308. The Developer may amend the fire management plan only with the prior written approval of
     the Manager – Land Use, which is not to be unreasonably withheld.
Information to be Provided to Registered Proprietors
309. The Developer must provide a bushfire information kit to purchasers of allotments on Site.
     The bushfire information kit must be prepared to the reasonable satisfaction of the Manager –
     Land Use.
Service Easements
310. All existing easements located over Council assets or to provide access within the Lot 888 SP
     186498 shall be retained, unless otherwise approved by Manager Land Development.
311. A registered easement shall be created over any stormwater drainage pipes within the site
     that collect stormwater from a Council road or convey stormwater from any adjoining property
     (for example, where drainage pipes are provided within the site to prevent adjacent properties
     from additional ponding/flooding due to the subject site being filled).
312. No building or other structure shall be constructed or encroach over an easement.
Vegetation Protection & Preservation
313. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
     shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
     allow water that falls on this surface to penetrate to the trees root system. The pavement shall
     be constructed so as not to damage the tree or their root system and in this regard temporary
     fencing shall be provided around the trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
314. Where retained tress are located in areas proposed to filled on site (or are located on
     neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
     material from being placed on the trees root system. To this end the design of the filling works
     will need to incorporate terracing around the tree or a similar means of ensuring that the
     natural ground level around the trees remains generally the same as existing. These
     measures shall clearly be shown on the plans submitted for Operational Works approval and
     any drainage required to drain these areas shall also be shown on the plans.
Headworks Contributions
315. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP17
     and PSP16 on Water Supply Headworks Contributions and Sewerage Headworks
     Contributions respectively and at the rates applicable at the time of payment. An estimate
     only of the contribution rates under the current policies is outlined below. These amounts will
     adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
     December 2007 until the date of payment.
         Water Supply     $1,122,673
         Sewerage         $786,733
         TOTAL            $1,909,406

        All headworks contributions must be paid prior to the commencement of the Use.


                                                                                  Page 48 of 59

Page 49

                                                                                        2006/823

          In the event that the Development Permit for Material Change of Use of Premises lapses or
          is cancelled, the contribution or trading bank guarantee will be returned.
General
316. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
     specifications for all engineering works that will become Council infrastructure, which shall be
     submitted in conjunction with an application for a Development Permit for Operational Works.
     In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
     submitted in conjunction with any application for Operational Works.
317. Digital detailed design drawings and calculations shall be submitted with any application for a
     Development Permit for Operational Works in respect of roadworks and stormwater drainage
     works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 –
     Engineering Design Standards – Roads, Drainage and Earthworks. To avoid conflict with
     underground pipes or services, all existing and proposed services required by the
     development shall be shown on the plans.
318. To facilitate production of As Constructed drawings it is suggested that all design drawings are
     submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
     use of ADAC are available at www.adac.com.au).
319. Any damage caused to any public utility during the course of construction shall be repaired to
     Council’s standards and at no cost to Council.
320. Any alteration of any public utility or other facilities necessitated by the development of the
     land or associated construction works external to the site shall be at no cost to Council.
321. The transportation of all materials to and from the site shall be undertaken in a manner such
     that no particle matter escapes onto a public road. All vehicles carrying materials either to or
     from the site shall be covered to prevent materials including dust being windblown from the
     vehicle.
322. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
     for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
     type of all services and structures. All of which shall be submitted to Council for checking and
     for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
Addition condition
Contributions Towards Council Infrastructure
1.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:

       Contribution Required For:                                                     Amount:
       PSP12 – Public Open Space Contributions
       (Land provided & dedicated in lieu under previous approvals 12592 DA &         Nil
       23206 DA)
       PSP16 – Sewerage Headworks Contributions                                       $3,338
                                                                                    Page 49 of 59

Page 50

                                                                                       2006/823


       PSP17 – Water Supply Headworks Contributions                                  $4,416
       PSP20 – Pathway Trunk Network Contributions
       (Coastal trunk pathway P1/21 (Hastings St to Noosa Hill lookout)              Nil
       constructed in lieu under previous approvals 12592 DA & 23206 DA)
       TOTAL Contribution Amount =                                                   $7,754
       Please note, that these amounts are all subject to variations in the Consumer Price
       Index, All Groups Brisbane from SEPTEMBER 2008 until the date of payment.

      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works.
      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
      full.
      Processing of bonds for security where specific Council approval has been given for the
      bonding of contributions will incur an administration fee in accordance with Council’s Land
      Development Commercial & Regulatory Fees at the time of lodgement.
      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the paid contributions and/or the trading bank guarantee will be returned.

5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency       Referral Address

 The site contains           Concurrence         Environmental         GPO Box 2771
 contaminated land                               Protection Agency     BRISBANE QLD 4001

 The lot contains            Concurrence         Department of         PO Box 383
 category 1,2 or 3 area                          Natural Resources     GYMPIE QLD 4570
 shown on a property                             & Water
 map of assessable
 vegetation

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $982,874 and is subject to variations in the
      Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment.
      An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.


                                                                                   Page 50 of 59

Page 51

                                                                                    2006/823

2.   The applicant is advised that development contributions and infrastructure charges applicable
     to this development approval have been based on the following Uses Class/ Uses and
     applicable quantities:-

                Existing Development                           Approved Development
      Existing Use Class /                           Approved Use Class
                               Existing Quantity                             Approved Quantity
              Use                                          / Use
                                                                             104 x 1 bedroom
                                                    Visitor                  units
                                                    Accommodation -          49 x 2 bedroom
      Detached House         1 Dwelling
                                                    Type 4 –                 units
                                                    Conventional             45 x 3 Bedroom
                                                                             Units
      Multiple Housing –
                             2 x 2 bedroom units
      Type 4 Conventional
                                                    Commercial Business
                                                                             9 Consulting Rooms
                                                    – Type 2 – Medical
                                                                             Function Room =
                                                                                     2
                                                                             1063 m Use Area
                                                                             Restaurant or Café
                                                    Entertainment &          –
                                                    Dinning – Type 1 –                        2
                                                    Food & Beverage          Standard = 107 m
                                                                             Use Area
                                                                             Outdoor Dining =
                                                                                   2
                                                                             415 m Use Area
                                                    Entertainment &          Licensed = 22 m
                                                                                                2
                                                    Dinning Business –       Use Area
                                                    Type 2 – Recreation,                        2
                                                    amusement and            Unlicensed = 331 m
                                                    fitness                  Use Area

                                                    Entertainment &          Hotel – Lounge Bar
                                                    Dinning Business –       and Beer Garden =
                                                                                   2
                                                    Type 3 – Bar             146 m Use Area
                                                    Openm Space Type 1
                                                                             Commercial Pool -
                                                    – Sport and                   2
                                                                             775 m Use Area
                                                    Recreation

3.   The applicant is informed that payment via credit card transaction will not be an acceptable
     method of payment for development contributions conditioned in this permit or for
     infrastructure charge notices issued separately.
4.   The applicant is advised that a Compliance Permit for all plumbing and drainage works within
     the boundaries of the development site shall be obtained from Council’s Plumbing Services
     Section prior to obtaining a Development Permit for Building Works.
5.   The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
     Local Law No. 12, prevents a builder or building contractor carrying out building work on a
     building site in a way that makes or causes audible noise to be made from the building work:-
     5.1      On a Sunday or public holiday, at any time; or
     5.2      On a Saturday or a business day, before 7.00am or after 6.30pm.
                                                                                Page 51 of 59

Page 52

                                                                                           2006/823

      A maximum penalty of $1,500 applies to an offence under this legislation.
6.    We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
      under the Disability Discrimination Act (DDA) in regard to the installation of disabled access
      and the provision of disabled facilities, and that access to this building and the provision of
      sanitary facilities may need to comply with the requirements of Section D Part D3 and Section
      F Clause F2.4 of the Building Code of Australia.
7.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
8.    Council does not consider the use of the street name “Little Hastings Street” to be acceptable
      as it is confusing with the other street names of Hastings Street and Upper Hastings Street.
Building Services
9.    The plans for the proposed building work have not been assessed for compliance with the
      requirements of the Building Code of Australia as they relate to people with disabilities. Your
      attention is drawn to the matter that either or both the Disability Discrimination Act 1992
      (commonwealth) and the Anti-Discrimination Act 1991(Queensland) may impact on the
      proposed building work.
      Noosa Council recommends that the following matters be considered to address equitable
      access and facilities in the building:
      (a) The building and environs should be designed to meet the requirements of the Human
          Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises” and
          AS1428.2;
      (b) Applicants should be aware that a “Disability Standard on Access to Premises is being
          developed and most likely will result in changes to the Building Code of Australia;
      (c) Any services and facilities in the building complex must allow independent, dignified and
          equitable use of the services and facilities for all people.
10.   At the date of adoption of The Noosa Plan, the siting of structures is nominated in Schedule 1.
      Land Use section will assess the siting of all structures.
11.   The following information is provided as a guide to assess the siting of the pools.
      11.1 The swimming pools on the two duplexes are proposed to be constructed with a
           setback of approximately 0 metres from the outermost projection to the front boundary.
      11.2 A swimming pool is a structure by definition and would generally need to comply with
           setback requirements applicable to a Class10B structure, under the planning scheme
           they may be considered as part of the landscaping elements applicable to the
           development.
      11.3    Swimming pools, where the minimum distance from the water to the road frontage is: -
             (A)    where the vertical distance to the coping above the finished ground level is not
                    more than 1.2m – 1.5m; or
             (B)    where a solid wall or fence at least 1.8m high above finished ground level is
                    constructed between the water and the road frontage and the top of the wall or
                    fence is at least1.0m above the top of the coping of the pool.
      11.4 Prior to the commencement of the development, a plumbing assessment must be
           obtained from Noosa Council’s Plumbing Services Section in accordance with the
           Plumbing & Drainage Act 2002 (as applicable).
                                                                                       Page 52 of 59

Page 53

                                                                                      2006/823

      11.5 No assessment has been carried out in regard to exits, the fire services, fire separation,
           fire resistance levels, disabled access or facilities. The building certifier will assess
           these aspects as part of the building application.
Additional advice conditions
1.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $1,412 and is subject to variations in the Consumer
      Price Index, All Groups Brisbane from SEPTEMBER 2008 until the date of payment. An
      Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.
2.    The applicant is advised that development contributions and infrastructure charges applicable
      to this development approval have been based on the following Uses Class/ Uses and
      applicable quantities:-

                Existing Development                        Approved Development
         Existing Use          Existing Quantity     Approved Use
                                                                         Approved Quantity
         Class / Use                                  Class / Use

       Visitor             104 x 1 bedroom         Visitor              105 x 1 bedroom
       Accommodation -     units                   Accommodation -      units
       Type 4 –            49 x 2 bedroom units    Type 4 –             48 x 2 bedroom units
       Conventional        45 x 3 Bedroom Units    Conventional         46 x 3 Bedroom Units
       Commercial          9 Consulting Rooms      Commercial           9 Consulting Rooms
       Business – Type          2                  Business – Type           2
       2 – Medical         551 m Use Area          2 – Medical          551 m Use Area

                           Function Room =                              Function Room =
                                  2                                            2
                           1063 m Use Area                              1063 m Use Area
       Entertainment &     Restaurant or Café –    Entertainment &      Restaurant or Café –
       Dinning – Type 1                     2      Dinning – Type 1                      2
       – Food &            Standard = 107 m        – Food &             Standard = 107 m
       Beverage            Use Area                Beverage             Use Area
                           Outdoor Dining = 415                         Outdoor Dining = 415
                             2                                            2
                           m Use Area                                   m Use Area
                           CMRNICP = 207 m2                             CMRNICP = 207 m2
                           Use Area                                     Use Area
       Entertainment &                             Entertainment &
                           Water & Sewerage =                           Water & Sewerage =
       Dinning Business                    2       Dinning Business                     2
                           Licensed = 22 m                              Licensed = 22 m
       – Type 2 –                                  – Type 2 –
                           Use Area                                     Use Area
       Recreation,                                 Recreation,
       amusement and       + Unlicensed = 331      amusement and        + Unlicensed = 331
                                            2                                            2
       fitness             Use Area (185 m +       fitness              Use Area (185 m +
                                 2                                            2
                           146 m Building I                             146 m Building I
                           gym/sauna)                                   gym/sauna)
       Entertainment &     Hotel – Lounge Bar      Entertainment &      Hotel – Lounge Bar
       Dinning Business    and Beer Garden =       Dinning Business     and Beer Garden =
                                 2                                            2
       – Type 3 – Bar      146 m Use Area          – Type 3 – Bar       146 m Use Area
                           Water & Sewerage                             Water & Sewerage
       Open Space                                  Open Space
                           only = Commercial                            only = Commercial
       Type 1 – Sport                  2           Type 1 – Sport                   2
                           Pool - 775 m Use                             Pool - 775 m Use
       and Recreation                              and Recreation
                           Area                                         Area

                                                                                  Page 53 of 59

Page 54

                                                                                          2006/823

Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Development Permit for Building Works         All Building Works

 Development Permit for Operational            Landscaping, Carparking & Access, Roadworks,
 Works                                         Frontage Works, Stormwater Drainage, Site Civil
                                               Works, Excavation of Materials, Erosion & Sediment
                                               Control & Filling of the Site

11    SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Advertising Devices Code

12    SUBMISSIONS
There were seven properly made submissions about the application.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable

14    RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15    OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.


                                                                                     Page 54 of 59

Page 55

                                                       2006/823

DECISION NOTICE HISTORY
 Original Decision Notice issued 15 February
   2007.
 Negotiated Decision Notice issued 19 April
   2007 with amendment to Conditions 5, 20,
   35.2, 42.1, 66, 68, 70, 71, 73, 83, 140, 162,
   167, 176, 182, 204, 212, 213.2.9, 213.3, 237,
   242, 258, 263, 283, 284.3.1, 284.11, 286,
   292, 306, deletion of Condition 42.6
 Compiled Decision Notice issued 27
   February     2008     with   amendment     to
   Conditions 1, 2, 20, 284.3.12, 286, 315 &
   Advice Conditions 1 & 2.
 Change to an Existing Approval issued 21
   January 2009 with amendment to Conditions
   1, 2, 18 & 20 and inclusion of one additional
   condition and two advice conditions.
Yours faithfully,



Kerri Coyle
MANAGER – LAND USE




                                                   Page 55 of 59

Page 56

                                         2006/823


Referral  Agency      Conditions                     –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                     Page 56 of 59

Page 57

    2006/823




Page 57 of 59


[OCR of page images]
2006/823

 

 

Council Application Number: 2006/8623
EPA Application Number: 27809 Past 10

Conditions of the development approval

1) Sufficient information to be provided in accordance with the Environmental Protection Act
1994 and the Draft Guidelines for the Assessment and Management of Contaminated
Land in Queensland (DEH, 1998) to show that Lot 106 on SP151408 is suitable for the
intended use. .

2) Third Party Reviewer. A Third Party Reviewer (TPR) must be appointed under the EPA's
Terms of Reference - Use of a Third Party Reviewer for Assessment and Management of
Site Contamination dated 28 August 2003 (TOR). The TPR must:

i) review all site assessment and remediation work undertaken to date on the whole
of Lot 106 SP151408;

ii) approve a remediation plan for removal and validation of all site contamination that
is prepared by consultants with relevant qualifications and experience as required
in Sections 381 and.395 of the Environmental Protection Act 1994, and.

iti) certify that the whole of Lot 106 SP151408 is suitable for any use and can be
removed from the Environmental Management Register or is suitable for the
intended residential uses subject to the conditions of a draft Site Management Plan.

3) Prior to any construction or development works commencing in the area of “containment
cell" on the subject land, the TPR certification must be provided to the Environmental
Protection Agency.

Reasons for inclusion of development conditions or refusal

In accordance with section 3.3.18 of the Integrated Planning Act 1997 and section 27B of the
Acts interpretation Act 1954, a concurrence response must include reasons for a refusal or for
the inclusion of development conditions.

The Environmental Protection Agency is recognised as a concurrence agency under the
Integrated Planning Regulation 1998 for the protection of the environment by the management
of contaminated land. The Environmental Protection Agency concurrence agency conditions
for this proposed development that are contained within this response are required to prevent
or mitigate any potential risk to human health or the environment from possible hazardous
contaminants present on the site.

Additional information for applicants

This concurrence response pursuant to Chapter 7, Part 8 of the Environmental Protection Act
1994 applies only to contaminated land issues and does not remove the need to obtain any
further approval for this development which may he required by this or other legislation, State

and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities
for such approvals as may be required.

~ End of Concurrence Agency Response ~

Pave of

Page 57 of 59

Page 58

                                                                                                           2006/823


                                                         Appeal Rights
                                                         INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                          (6) If an application involves assessment against a
Planning Act (Chapter 4).                                            concurrence agency code, appeal rights for submitters
                                                                     for the application are not available against the part of
Division 8 - Appeals to                   court   relating   to      the approval that represents the concurrence agency’s
development applications                                             response for the code.
Appeals by applicants                                                Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application                4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-                jurisdiction, appeal to the court about the giving of a
      the refusal, or the refusal in part, of a development         development approval for a development application if-
      application;                                                   3.       the development application involves impact
      a matter stated in a development approval, including                   assessment; and
      any condition applying to the development, and the
      identification of a code under section 3.1.6;1                 4.       the advice agency told the applicant and the
                                                                              assessment manager to treat its response to the
      the decision to give a preliminary approval when a                     application as a submission for an appeal.
      development permit was applied for;
                                                                        (2) The appeal must be started within 20 business
      the length of a relevant period;
                                                                     days after the day the decision notice or negotiated
    a deemed refusal.                                               decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must be             submitter.
started within 20 business days (the “applicant’s appeal             Appeals for matters arising after approval given
period”) after the day the decision notice or negotiated             (co-respondents)
decision notice is given to the applicant.
                                                                     4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be started             development application, a person to whom any of the
at any time after the last day a decision on the matter              following notices have been given may appeal to the
should have been made.                                               court against the decision in the notice-
Appeals by submitters                                                1        a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application may                      extension of the relevanrt period for an approval;
appeal to the court about-                                           2        a notice giving a decision on a request to make a
1. the giving of a development approval, including any                        minor change to an approval.
     conditions (or lack of conditions) or other provisions                  The appeal must be started within 20 business
     of the approval; or                                             days after the day the notice of the decision is given to
2.   the length of a relevant period for the approval.               the person.
    (2) The appeal must be started within 20 business                         Subsection (1)(a) does not apply if the approval
days (the “submitters appeal period”) after the day the              resulted from a development application (superseded
decision notice or negotiated decision notice is given to            planning scheme) that was assessed as if it were an
the submitter.                                                       application under a superseded planning scheme.
    (3) If a person withdraws a submission before the                         Also, a person who has made a request
application is decided, the person may not appeal the                mentioned in subsection (1) may appeal to the court
decision.                                                            against a deemed refusal of the request.
    (4) If an application involves both impact assessment                     An appeal under subsection (4) may be started
and code assessment, appeal rights for submitters are                at any time after the last day the decision on the matter
available only for the part of the application involving             should have been made.
impact assessment.
                                                                     Division 9 - Appeals to court about other matters
    (5) If an application is processed under section
                                                                     Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application
are available only for the aspects of the development that
                                                                     (no co-respondents)
would have required public notification under the                    4.1.31.(1) A person to whom any of the following notices
repealed Act.                                                        have been given may appeal to the court against the
                                                                     decision in the notice-
                                                                         1.    a notice giving a decision on a request to
1                                                                              change or cancel a condition of a development
    Section 3.1.6 (Preliminary approval may override local                     approval.
    planning instrument)
                                                                                                      Page 58 of 59

Page 59

                                                                                                     2006/823

    2.    a notice under section 6.1.442 giving a decision      (c) the decision to give a preliminary approval when a
          to change or cancel a condition of a                        development permit was applied for;
          development approval.                                 (d) the length of a period mentioned in section 3.5.21
1.       The appeal must be started within 20 business                relevant period;
         days after the day the notice of the decision is
                                                                (e) a deemed refusal.
         given to the person.
                                                                    (2) An appeal under subsection (1)(a) to (d) must be
2.       Also, a person who has made a request
                                                                started within 20 business days (the “applicant’s appeal
         mentioned in subsection (1)(a) may appeal to the
                                                                period”) after the day the decision notice or negotiated
         court against a deemed refusal of the request.
                                                                decision notice is given to the applicant.
3.       An appeal under subsection (3) may be started at
                                                                    (3) An appeal under subsection (1)(e) may be started
         any time after the last day the decision on the
                                                                at any time after the last day a decision on the matter
         matter should have been made.
                                                                should have been made.
Appeals against decisions to change approval conditions
                                                                The Registrar for the Building and Development
under the repealed Act
                                                                Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision        http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or           For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court         4.1.36 Appeals about particular infrastructure
against-                                                        charges
     (2) the decision; or                                       (1) This section applies to a person who has been
     (3) a deemed refusal of the application.                   given, and is dissatisfied with, an infrastructure charges
    (2) An appeal under subsection (1)(a) must be               notice or a regulated State infrastructure charges notice.
started within 20 business days after the day notice of         (2) The person may appeal to the court against the
the decision is to be given to the person.                      notice.
    (3) An appeal under subsection (1)(b) may be started        (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter         after-
should have been made.                                          (a) if the notice is given because of a development
Appeals against local laws                                           approval or master plan approval-the day the
4.1.33B.(1) An applicant who is dissatisfied with a                  applicant is given notice of the decision about the
decision of a local government or the conditions applied             approval; or
under a local law about the use of premises or the              (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the      (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
decision or the conditions applied.                             (a) whether a charge in the notice is so unreasonable
                                                                    that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business               infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the           have imposed it; or
applicant.
                                                                (b) an error in the calculation of the charge.
For Building Works Only                                         (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the              under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                        used to establish the charge in the relevant infrastructure
Division 3 – Appeals           to   tribunals   relating   to   charges schedule or regulated State infrastructure
development applications                                        charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
     application;
(b) a matter stated in a development approval, including
     any condition applying to the development, and the
     identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                                Page 59 of 59

Used in these records

About this file

File size
329 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published].pdf · 329 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.