Council archive · source document
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03
2006/823
126. No development other than stormwater outlets shown on the approved plans shall be
permitted within a 10m wide buffer area on both sides of the intermittent creek (measured
horizontally from the centre line of the intermittent creek). This includes tracks, sediment
ponds, erosion control devices, etc. Erosion control and bank stabilisation devices shall not
be constructed within the intermittent creek bed without the prior approval of the Manager –
Land Development.
127. The existing hydrological regime of the intermittent creek shall not be significantly altered.
128. The long term water quality within the intermittent creek will be in compliance with the
ANZECC Protection of Aquatic Ecosystem guidelines for the protection of in-stream fauna and
their habitat.
Freshwater Habitat Feature and Environs
129. The freshwater habitat pond shall be specifically vegetated and managed to provide habitat for
frogs, aquatic birds and other native fauna. It will have a subsidiary role as a polishing pond
but will not be used for primary stormwater treatment for the Site.
130. The Developer shall prepare and implement the Freshwater Habitat Management Plan which
shall include the following details:
130.1.operational details;
130.2.rehabilitation details for both the pond and surrounding vegetation;
130.3.weed control and mosquito control procedures;
130.4.protection of the downstream creek environment;
130.5.water quality standards and required monitoring during the resort site construction and
operation stages;
130.6.performance standards that will identify when the new habitat area is functional as an
aquatic habitat;
130.7.maintenance and de-silting requirements and procedures; and
130.8.how public access and public safety issues will be addressed.
Buffer Areas
131. The following buffer areas are required to protect the Environmental Values of the Site:
131.1.a 10m wide buffer area on both sides of the intermittent creek (measured horizontally
from the centre line of the creek);
131.2.75m radius buffer area (delineated by appropriate signage) around known Red-tailed
Black Cockatoo feed and nesting trees during construction;
131.3.the Cryptocarya foetida plants in the intermittent creek;
132. Unless specifically shown on the Drawings or specified in these Conditions, no construction
works or associated activities shall be permitted in these areas.
133. During construction, all buffer areas shall be clearly identified and delineated on the ground in
accordance with these Conditions.
Landscape Management Report
Preparation
134. A Landscape Management Report shall be prepared for the site by an experienced landscape
architect in conjunction with a person holding appropriate horticultural qualifications. The
Landscape Management Report shall be prepared to the reasonable satisfaction of the
Manager – Land Use.
Page 25 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.