Skip to the record
Accept no imitations.

Council archive · source document

Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                         2006/823

126. No development other than stormwater outlets shown on the approved plans shall be
     permitted within a 10m wide buffer area on both sides of the intermittent creek (measured
     horizontally from the centre line of the intermittent creek). This includes tracks, sediment
     ponds, erosion control devices, etc. Erosion control and bank stabilisation devices shall not
     be constructed within the intermittent creek bed without the prior approval of the Manager –
     Land Development.
127. The existing hydrological regime of the intermittent creek shall not be significantly altered.
128. The long term water quality within the intermittent creek will be in compliance with the
     ANZECC Protection of Aquatic Ecosystem guidelines for the protection of in-stream fauna and
     their habitat.
Freshwater Habitat Feature and Environs
129. The freshwater habitat pond shall be specifically vegetated and managed to provide habitat for
     frogs, aquatic birds and other native fauna. It will have a subsidiary role as a polishing pond
     but will not be used for primary stormwater treatment for the Site.
130. The Developer shall prepare and implement the Freshwater Habitat Management Plan which
     shall include the following details:
      130.1.operational details;
      130.2.rehabilitation details for both the pond and surrounding vegetation;
      130.3.weed control and mosquito control procedures;
      130.4.protection of the downstream creek environment;
      130.5.water quality standards and required monitoring during the resort site construction and
            operation stages;
      130.6.performance standards that will identify when the new habitat area is functional as an
            aquatic habitat;
      130.7.maintenance and de-silting requirements and procedures; and
      130.8.how public access and public safety issues will be addressed.
Buffer Areas
131. The following buffer areas are required to protect the Environmental Values of the Site:
      131.1.a 10m wide buffer area on both sides of the intermittent creek (measured horizontally
            from the centre line of the creek);
      131.2.75m radius buffer area (delineated by appropriate signage) around known Red-tailed
            Black Cockatoo feed and nesting trees during construction;
      131.3.the Cryptocarya foetida plants in the intermittent creek;
132. Unless specifically shown on the Drawings or specified in these Conditions, no construction
     works or associated activities shall be permitted in these areas.
133. During construction, all buffer areas shall be clearly identified and delineated on the ground in
     accordance with these Conditions.
Landscape Management Report
Preparation
134. A Landscape Management Report shall be prepared for the site by an experienced landscape
     architect in conjunction with a person holding appropriate horticultural qualifications. The
     Landscape Management Report shall be prepared to the reasonable satisfaction of the
     Manager – Land Use.

                                                                                     Page 25 of 59

Used in these records

About this file

File size
329 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published].pdf · 329 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.