195. Sediment and erosion control plans shall be prepared in conjunction with the Sediment and
Erosion Control Management Plan, to the reasonable satisfaction of the Manager – Land
Development and in accordance with the Institution of Engineers Australia ‘Engineering
Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in particular using
Checklist No. 3 from that document. The sediment and erosion control plans shall cover all
stages of the resort development (during the construction, establishment and operational
phases) including rehabilitation and remediation of the resort site. These plans are to be
submitted to Council in conjunction with Operational Works application.
196. Sediment basins and their batters and outlets for the site shall be located outside the 10 metre
setback to the intermittent creek and with ARI 5 year piping to the intermittent creek.
197. The Developer shall not commence any development on the resort site until the Sediment and
Erosion Control Plan is approved by the Manager – Land Development.
198. The Developer shall not commence any development on the resort site until the staged
sediment and erosion control is in place as indicated in the approved staged sediment and
erosion control plans.
199. The Developer may amend the Sediment and Erosion Control Management Plan only with the
prior written approval of the Manager – Land Development, which is not to be unreasonably
withheld.
200. The staged sediment and erosion control plans must have regard to the objective of
minimising the transport of nutrients and sediment from the Site and providing pollution control
measures which deliver an acceptable level of safety and health risks for the owner and
occupiers of Lot 27 and the environment on Lot 27.
201. Sediment runoff from site disturbance during revegetation is to be monitored and localised
effects are to be mitigated by use of a range of techniques including;
201.1.additional mulching;
201.2.spraying of disturbed areas with chemical binders or soil stabilisers;
201.3.placement of jute mesh and other protective coatings on disturbed areas; and
201.4.use of sediment fences down slope of revegetated areas.
202. The Development is not to restrict the natural flow of water in the southern intermittent creek
running from the Site into Lot 27 or adversely affect its quality.
203. The Development is not to cause flooding from the southern intermittent creek onto Lot 27 or
erosion of the bed or banks of the intermittent creek.
Stormwater Management
204. All stormwater drainage shall be collected on site and discharged so there is no worsening off-
site during critical events. That is there shall be no net increase in the peak stormwater flows
from all events, being Q1 to Q100 critical design events. Stormwater drainage permitted to
drain from the site shall be discharged to the intermittent creek to protected outlets to ensure
no scour occurs. Stormwater drainage shall be designed in accordance with Water Sensitive
Design Principles and stormwater flows shall be dispersed as much as possible, without
increasing risks of scour to the riparian buffer or creek.
Page 35 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.