Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03
2006/823
292. The operator of the Resort shall provide adequate carparking spaces on site for staff of the
Resort, alternatively staff may utilise the 22 constructed street-side bays on Viewland Drive
detailed in SK 2004 Issue C. The operator shall not instruct staff to park elsewhere off-site.
The community management statement for any or all bodies corporate having control of any
part of the Resort shall reflect this condition.
293. The operational phase of the Resort following completion of construction, shall comply with the
following:
293.1.Buses are to be limited to 22 seat capacity shuttle buses.
293.2.Delivery vehicles for provisions, linen, etc are to be rigid vehicles not exceeding
11 metres in length.
293.3.Garbage removal vehicles are to be limited to standard garbage trucks and/or standard
vehicles for the delivery/removal of garbage compacters.
293.4.Service garbage and delivery vehicles may operate only between the hours of 8.00am
and 5.00pm Monday to Saturday.
Attunga Heights - Lot 27 on RP89506.
294. The future use of Alma Way and adjacent public pathways (including connections) by vehicles
and pedestrians ingressing/egressing Lot 27 on RP89506 is to be in accordance with the
relevant conditions imposed in the Development Approval granted by the Minister for Local
Government and Planning in respect of Lot 27 on RP89506. Access shall be permitted in
accordance with these conditions.
Earthworks
295. All earthworks are to be undertaken in accordance with approved engineering drawings and
shall be certified by a suitably qualified Registered Professional Engineer of Queensland at
design and constructed stage.
296. All related management plans will be complied with during the performance of the earthworks.
297. No earthworks shall occur within the 10 metre setback to the intermittent creek.
298. All earthworks shall be part of an operational works application in accordance with the
Integrated Planning Act 1997.
299. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the additional ponding of water
on any adjoining lands or the blockage of, or interference with, any natural watercourses.
Detailed site surveys indicating natural surface levels and contours of the adjoining properties
must be provided with the application for a Development Permit for Operational Works for
Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path will also be required. In this
regard a Development Permit for Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater
will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
path and easement shall not apply.
Page 46 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.