Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published] · 132006.823.03
2006/823
306. The Fire Management Plan shall be approved by the Manager – Land Use.
307. The Developer shall comply with the fire management plan and compliance with the fire
management plan shall be addressed by the community management statement of any or all
bodies corporate having control of any part of the Site.
308. The Developer may amend the fire management plan only with the prior written approval of
the Manager – Land Use, which is not to be unreasonably withheld.
Information to be Provided to Registered Proprietors
309. The Developer must provide a bushfire information kit to purchasers of allotments on Site.
The bushfire information kit must be prepared to the reasonable satisfaction of the Manager –
Land Use.
Service Easements
310. All existing easements located over Council assets or to provide access within the Lot 888 SP
186498 shall be retained, unless otherwise approved by Manager Land Development.
311. A registered easement shall be created over any stormwater drainage pipes within the site
that collect stormwater from a Council road or convey stormwater from any adjoining property
(for example, where drainage pipes are provided within the site to prevent adjacent properties
from additional ponding/flooding due to the subject site being filled).
312. No building or other structure shall be constructed or encroach over an easement.
Vegetation Protection & Preservation
313. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
314. Where retained tress are located in areas proposed to filled on site (or are located on
neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
material from being placed on the trees root system. To this end the design of the filling works
will need to incorporate terracing around the tree or a similar means of ensuring that the
natural ground level around the trees remains generally the same as existing. These
measures shall clearly be shown on the plans submitted for Operational Works approval and
any drainage required to drain these areas shall also be shown on the plans.
Headworks Contributions
315. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP17
and PSP16 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts will
adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
December 2007 until the date of payment.
Water Supply $1,122,673
Sewerage $786,733
TOTAL $1,909,406
All headworks contributions must be paid prior to the commencement of the Use.
Page 48 of 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00000823.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 329 KB (small file)
- File type
No other editions are linked here.