Original source · versioned page text
Planning Statement -Ext currency
Page 3
2020. Whilst the existing approval does not comply with the Noosa Plan 2020, the approval is still
current with the extension required to ensure a valid permit throughout construction.
It is noted that the site adjoins an existing constructed self-storage facility and is a logical extension to
this existing facility with access provided along the rear from this adjoining site. The proposed building
is also designed such that is could be easily converted to industrial uses if required in the future.
The applicant has spent considerable funds on progressing the development and intends to commence
construction as soon as the operational works permit is issued.
The proposed extension of the currently period will not impact on the intent of the Noosa Plan and is
considered to meet the criteria of the Act. The applicant requests an extension of the currency period
as detailed below:
MCU17/0025 & OPW17/0095 - a further 18 month extension until 21.09.2023
This development application has been prepared in accordance with the Planning Act 2009 and is
being submitted with the following attached completed Council form. Councils application fees will be
paid upon confirmation of Councils fee.
Please contact me if you require any further information and/or clarification.
Yours sincerely,
Nadine Gorton
Senior Planner
martoo consulting pty. ltd.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.