7.0 It is acceptable for the proposed 27 allotments to be serviced from this 100mm dia. line. The internal network will provide for the extension of the 100mm dia line to the end of the development and looped at the end of line in accordance with standard design practice. TRAFFIC & ACCESS The proposed development will gain access from the existing roundabout on Links Drive. The roundabout currently provides access to the golf course maintenance shed with provision for extension towards the proposed development. It is intended to provide a standard 5.5m wide (kerb to kerb) access road to the development. This new road will extend to the new development between the existing 10 Green and 11% Tee. The proposed road will also have provision for a separate pedestrian / cart path from the proposed Precinct J to the Golf Club House. The proposed road will also provide a gate system to restrict general traffic from accessing the development. Within the proposed development it is planned to have a nominal 3.5m wide pavement within a 10.0m wide reserve with additional widths of 2.0m or more at regular intervals to allow for passing movements. All proposed road layouts will be designed in accordance with the requirements of Queensland Streets. It is also proposed to have a central garbage collection point. C1732-07-Engineering Report Page 5 of 10 NOVEMBER 2007 — IF/ca TATE PROFESSIONAL ENGINEERS PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 4. Civil Engineering Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.