Council archive · source document
CAR Letter 4403pdf · OPW13/0614
SDA-0913-004403 Our reference: SDA-0913-004403 Your reference: OPW13/0614 Attachment 1—Conditions to be imposed No. Conditions Condition timing 1. The sandbag revetment works must be removed or modified Continuous if the works have or are likely to have a significant effect on coastal management because the works: # Cause or increase localised erosion, particularly at the terminal ends of the revetment # Are structurally unstable # Disturb coastal processes # Increases the coastal hazard risk or scouring to adjacent areas or properties. 2. Should the sandbag revetment works result in significant Continuous adverse impacts to coastal management or adjoining properties, Sunshine Coast Regional Council, or its successor, is responsible for any rectification works and where necessary, the removal of the works causing the impacts. Department of State Development, Infrastructure and Planning Page1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
CAR Letter 4403pdfRelated documentApplication case desk ↗
About this file
- File size
- 44 KB (small file)
- File type
No other editions are linked here.