Concurrence Agency Response OPW12/0287
EHP Permit number: SPCC0486912 CONDITIONS Agency Interest — General ty All works are to be constructed in accordance with the attached approved drawings and specifications listed in the approved plans section in the notice attached to this permit. 2. All materials and works must comply with Australian Standards. 3. An appropriate spill kit, personal protective equipment and relevant operator instructions/emergency procedure guides for the management of fuel and chemicals associated with the operational works stage must be kept on site. Anyone working under this approval must be trained in the use of the spill kit. 5. Telephone the Department of Environment and Heritage Protection (EHP) Pollution Hotline on 1300 130 372 or local office on (07) 5459 6132 immediately after becoming aware of any release of contaminants or other breach of condition, not in accordance with the conditions of this approval. 6. The construction and installation of the works must not result in any adverse impacts on the surrounding environment, nor cause any long-term maintenance and management implications. 7. Should the works result in adverse impacts, the permit holder is responsible for rectification works and where necessary the removal of the works causing impacts. 8. The chief executive administering the Coastal Protection and Management Act 1995 may order the works to be removed or modified within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: (i) | create a danger to the public; or (ii) | cause erosion or land degradation; or (iii) are unstable; or (iv) have not been constructed according to the approved plans. - Agency Interest — Land 9. No sand is to be removed from the coastal dune system or active beach system within the erosion prone area or coastal management district. 10. Spoil removed from within the proposed development area must be stockpiled separately upon excavation, and reused, rather than disposed of. 11. Best practice erosion and sediment control measures must be implemented and maintained to minimise erosion and the release of sediment. Agency Interest — Vegetation 12. All works must be undertaken in a manner that minimises damage to the native vegetation on and adjacent to the site. 13. There must be no death or permanent removal of marine plants, inter-tidal plants or native terrestrial woody vegetation outside of the disturbance footprint as indicated within the attached approved plans, as a result of these works. Agency Interest — Water 14. All materials used in the construction of the woks must be: (v) clean and free of silt; and (vi) suitable for the purpose having regard to the location of the land and to the proposed use of the land. 15. The development must maintain local and regional drainage and hydrological systems. 16. The development must not result in a change in water chemistry that will impact on ecological values on or off site. 17. Stockpiles of waste, spoil or other contaminated material must not be stored within thirty (30) metres of the high water mark. 18. Chemical, waste, fuel or oil storage onsite must be appropriately bunded to contain the full volume of the stored material. END OF CONDITIONS Page 3 of 3 * 120607 « Version 1 Department of Environment and Heritage Protection
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Concurrence Agency Response OPW12_0287.msg)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.