8 November 2022




Noosa Council
PO Box 141
Tewantin QLD 4565
Attention: Georgina Schramm
Via email: [email protected]


                Cc    Noosa Women’s Shed
                      60/1 Ferrells Road
                      Cooroy QLD 4563
                      Attention: Robyn Sanders
                      Via email: [email protected]

Dear Sir/Madam,

Referral Agency Response – Development Permit for a Material Change
of Use for a Community Use (Women’s Shed) at Wallum Lane, Noosa
Heads (Lot 17 on SP239726)

Council Ref: MCU22/0169
Applicant Ref: N/A
Our Ref: HBD 7661677

We refer to the abovementioned Development Application, which has been
referred to Energex Limited pursuant to section 54 of the Planning Act 2016.

In accordance with Schedule 10, Part 9, Division 2 of the Planning Regulation
2017, the application has been assessed against the purposes of the
Electricity Act 1994 and Electrical Safety Act 2002. This notice is provided in
accordance with section 56 of the Planning Act 2016.

Should the Assessment Manager decide to approve the proposed Material
Change of Use, as an Advice Agency for the Development Application,
Energex advises the following in relation to the development:
                                                                                  Enquiries
   1. The development is to be carried out in accordance with the plans           Benjamin Freese
      identified below. Any changes to these plans should be resubmitted to       Mobile
      Energex for further review and comment.                                     0455 403 399
                                                                                  Email
                                  Approved Plans                                  [email protected]
        Title                   Plan Number          Rev      Date
                                                                                  Corporate Office
        Noosa Womens Shed       SK1 – SK4            B        14 September        26 Reddacliff Street,
        Site Plan                                             2022                Newstead QLD 4006
                                                                                  GPO Box 1461
   2. The conditions of any easements in favour of Energex must be                Brisbane Qld 4001
      maintained at all times.                                                    Telephone (07) 3664 4000
                                                                                  Facsimile (07) 3025 8301
                                                                                  www.energex.com.au
   3. Access to the easement and access along the easement must be
      available to Energex personnel and heavy equipment at all times.            Energex Limited
                                                                                  ABN 40 078 849 055


Reference: HBD 7661677
Log in to download the original file

EGX_PROD_n7661677_Wallum_Lane,_Noosa_Heads_L17_SP239726.pdf · 242 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

                                                    2




    4. Any future works on an Energex easement or in the vicinity of Energex assets
       are to be carried out in accordance with Energex Standard Guidelines MD-03/12.
       A copy of these guidelines is attached for reference.

Should you require further information regarding this matter, please contact the
undersigned on 0455 403 399 or [email protected] faithfully,



Benjamin Freese
Town Planner

Encl.   Copy of Energex Standard Guidelines MD-03/12




Reference: HBD 7661677

                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency

Page 3

                                                       3




                                  Standard Guidelines MD-03/12

When considering Works, either on Energex easements or in the vicinity of Energex assets,
please be aware of the following general conditions:

   Satisfactory clearance from your proposed structure to the existing (and/or future) electricity
    wires must be maintained in accordance with the Electrical Safety Regulations 2013.

   All previous conditions must be adhered to and Energex may, at its discretion, audit the
    finished development to check that it conforms to the conditions of the development.

   Natural ground levels on the easement are not be disturbed without Energex approval.
    Detailed civil design drawings showing any proposed cut and fill levels on the easement
    and the location of the Energex assets in relation to the proposed development are to be
    submitted to and approved by Energex prior to the commencement of any works on site.

   No civil works are to occur within 5 metres of any part of an Energex Structure (e.g.- tower
    base, pole or stay) without Energex approval.

   If the minimum 5m horizontal separation to the Energex structure cannot be achieved, the
    Developer must consult Energex with regards to allowable construction methods. This may
    include full depth shoring of the excavation sides for a minimum of 5 metres either side of
    the structure.

   Any excavations deeper than 5m must have a minimum horizontal separation from the
    excavation to any tower, base or pole at least equal to the excavation depth. The
    excavation is not to be left open overnight and backfill is to be compacted in 150mm layers
    in the immediate vicinity of the structure.

   10 metres clear access must be provided around all towers and pole structures after the
    completion of any works on the easement.

   Final ground levels should slope gently to the edge of the easement, surrounding area or
    kerb such that pooling of water on the easement is avoided and conductor ground
    clearances are not decreased.

   Stockpiling of spoil on the easement is prohibited.

   Lighting structures are not permitted in the easement without prior written consent of
    Energex. Lighting designs for proposed developments (e.g. road, carparks etc) on the
    easement are likely to require reduced height structures. Please submit detailed design to
    Energex for approval. These drawings must clearly show the following:
    -      Proposed height of the lighting structures and the ground level at the structure base,
    -      Relative (to lighting structures) ground levels at Energex structures (towers, pole etc)
           either side of the lighting structures, and
    -      The location of the Energex structures in relation to the proposed lighting

   Proposed underground services such as stormwater, sewerage, water and the like are to be
    kept to the outer edge of the easement. Services crossing the easement should be as near
    as practicable to right angles to the overhead conductor direction and not within 10 metres
    of any tower, pole or stay. Pipelines and crossings are to be clearly marked. Please
    submit the relevant design drawings to the Energex for review.
    The identification, assessment and mitigation of any possible hazards in the service due to
    electromagnetically induced voltages, is the responsibility of the Developer.

Reference: HBD 7661677

                                      Have you seen our fact sheets?
        See the ‘considerations when developing around electricity infrastructure’ section of our website
                                    www.energex.com.au/referralagency

Page 4

                                                       4




   Any cut in the vicinity of a structure or between a structure and the road kerb will need to be
    stabilised by a retaining wall. The retaining wall design and location is to be submitted to
    Energex for approval.

   Any costs incurred by Energex as a result of the works on the easement are to be met by
    the property Developer / owner.

   Access to the easement and access along the easement must be available to Energex
    personnel and heavy equipment at all times. Energex will require the Developer / owner to
    supply and install gates where fencing prohibits access to and along the easement area.
    To enable travel along the easement at anytime the gates must be series locked with an
    Energex padlock. Both the padlock and a design drawing of an acceptable gate will be
    provided by Energex.

   At all times the following clearance must be maintained from the top of any machinery
    moving in the vicinity of energised conductors:
    -      132kV and 110kV conductors – 4.5m minimum clearance
    -      33kV and 11kV conductors – 3m minimum clearance
    Should it be necessary to transport equipment or extend any equipment, such that these
    clearances cannot be confidently maintained, you are required to contact our office to
    ascertain whether a Safety Officer is required on–site. All operators of machinery are to be
    made aware of the presence of high voltage conductors.

   No planting is permitted in the Easement without prior approval from Energex. If planting is
    proposed, the applicant is required to provide a Detailed Landscape Plan to Energex for
    approval which:
        o Keeps the planting of trees to the outer most edge of the easement and not directly
           under any overhead conductors; and
        o Plots the location of the overhead conductors (accounting for a cross-arm if
           applicable and plotting the powerline on the outmost edge of each side of the cross-
           arm); and
        o Uses         species        included     on        Energex’s     Safetrees         list
           (https://www.energex.com.au/about-us/our-commitment/to-the-
           environment/vegetation/safetree-program); and
        o Ensures a horizontal clearance is achieved between the tree and the outer most
           conductor equal to the mature height of the tree.




Reference: HBD 7661677

                                      Have you seen our fact sheets?
        See the ‘considerations when developing around electricity infrastructure’ section of our website
                                    www.energex.com.au/referralagency

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.