kerb types
300 |
BELOW ROAD SURFACE
TYPE 1
ON ROAD SURFACE
WITH CHANNEL
MOUNTABLE KERBS
TYPE 8 (DEPTH 125)
TYPE 9 (DEPTH 125 + ‘AA’)
50
fo}
Zz
*~
RS
f
230. 50-230 50
| R5
|| A
3 wo
1 R25 R25 =| ¢<
: > SL
- R25 ‘_| 8
4 N
ae ed 5
610
TYPE 3
@)
110, 40 300 or 450
150
R25
Gradient 3%
9 (300 tray)
14 (450 tray)
150 min,
450 or 600
TYPE 23 (300 TRAY)
TYPE 24 (450 TRAY)
= \ cree 25
BARRIER KERB _AND_ TRAY
Bullnose 10 ~
ROAD SURFACE — WITH BACKING STRIP
TYPE 10 (DEPTH 125)
TYPE 11 (DEPTH 125 + ’AA’)
@)
40 | 110 | 40
R25: 8
| L190 |
ON ROAD SURFACE
TYPE 4
125
—T uF
& &.
©)
min. depth below
road surface.
‘AA
| 300
BELOW ROAD SURFACE
TYPE 12 (DEPTH 125)
TYPE 13 (DEPTH 125 + ’AA’)
SEMI MOUNTABLE KERBS
110 40
e~l |
~ N C RS
R25 wo
. ¢
: €
4 Joe
foes 8
|_1s0_|
BELOW ROAD SURFACE
TYPE 5
BARRIER _KERBS
® @
110 190 300 or 450
| 600 or 750
WITH CHANNEL
TYPE 14 (300 CHANNEL)
TYPE 15 (450 CHANNEL)
SEMI MOUNTABLE KERB AND TRAY
TYPE 26 (450 TRAY)
t 500 £ 500
300 z 300
|
| oO Ss
R75 fo a | 3
. R15 R15 Sle ds
a, 2 - wy ja
600 | 1000
TYPE 22 TYPE 28
110. 190 500_oF 450 sevient 32 () Gradient 3%
R095 300 300 |
wo
R25 | N 9 (300 tray) a ee 2 9
14 (450 t < =
oN SS i ( ray) E J, R25 /S < SINT
R75 € . 0 “ Bullnose 10 € N
7 , . 3 a, “N : ‘ 3 Chamfer 25
Fae ae —|__- Chamfer 25 —— =
600 or 750 | 600 |
TYPE 25 (300 TRAY) TYPE 27
MOUNTABLE KERB AND TRAY
@ —@
110_ 40 300 or 450
40
oe
Chamfer 25 ‘
| 450 or 600 |
WITH CHANNEL
TYPE 6 (300 CHANNEL)
TYPE 7 (450 CHANNEL)
REFERENCE POSITIONS
(a) Line of kerb
Line of channel lip
(c) Height reference
DEIAL )
NOTES:
1. CHANNEL THROAT THICKNESS of 150mm and portion of kerbs below
finished surface shown is a minimum. The underside of the section should
preferably coincide with the top of a pavement layer in level and slope.
2. TRANSITIONING between kerb types to be carried out over 1.5m (min).
3. CONCRETE
— Manually placed concrete to be N32/10, to MRTS7O.
— Machine—placed concrete to MRTS70, Clause 17.20, minimum
cementitious content of 320 kg/m* (no compressive strength testing
required).
4. ASPHALT ALLOWANCE ’AA’ provides for initial asphalt layer and/or future
overlay as indicated in the documents. ‘AA’ may include the thickness of
any combination of: — asphalt corrector course — initial asphalt layers —
estimated future asphalt overlay.
5. DIMENSIONS are in millimetres unless shown otherwise.
ASSOCIATED DEPARTMENTAL DOCUMENTS:
Standard Drawings
Specifications
REFERENCED DOCUMENTS:
Departmental Specifications:
MRTSO3 Drainage, Retaining Structures and Protective Treatments
MRTS70 Concrete
Australian Standards:
AS 2876 Concrete Kerbs and Channels (Gutters) — Manually or
Machine Placed
Department of Transport and Main Roads
KERB AND CHANNEL
©The State of Queensland (Department
‘of Transport and Main Roads) 2020
: http://creativecommons.org/
Queensland | jcenses/ry/3.0/au
Government
AS Standard Drawing No
PROFILES Not | 0 3 3
Scale Date 7/2020
Lele te Le TT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original