Original source · versioned page text
220711 Noosa Oyster Project - CEMP
Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
M&J Marine Services PTY. LTD.
Environmental Management Plan
34 Ryan Road, Medowie, NSW 2318
ABN: 766 242 991 45
M&J Marine Services Page 1 Environmental Management Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 49 pages
Page 2
Document control
Version Date Revision Author
1 25/2/2019 Port Of Newcastle Jay Maartensz
2 15/5/2019 Sea Slip Marinas Jay Maartensz
3 1/12/2019 DPI Fisheries - Oyster reef pilot Jay Maartensz
4 19/6/2020 Transport NSW - RMS Jay Maartensz
5 1/1/2021 DPI Fisheries - Oyster reef pilot stage 2 Jay Maartensz
6 1/10/2021 Port Macquarie Hasting Council - flood Jay Maartensz
Clean ups
7 14/4/2022 Narooma Oyster Reef Project Jay Maartensz
8 1/7/2022 Noosa River Oyster Reef Project Jay Maartensz
M&J Marine Services Page 2 Environmental Management Plan
Page 3
Table Of Contents
1. Background 5
1.1. Introduction 5
1.2. Environmental policy 5
1.3. Project Description 5
2. Environmental Management Structure and Responsibilities 6
2.1. Director/ manager 6
2.2. On site Supervisor/ Person in charge 6
2.3. Employees and Sub Contractors 6
2.4. Approval and Licensing Requirements 8
2.5. Environmental Training 8
2.6. Emergency Contacts and Response 8
2.7. Hazardous Substances 10
2.8. Emergency Response Procedures 10
2.8.1. Fire Emergency 10
2.8.2.Gas Leak Emergency 10
2.8.3.Leak Or Spill Emergency 11
3. Implementation 12
3.1. Risk Assessment 12
3.1.1.Air quality 12
3.1.2.Erosion and Sediment Control 12
3.1.3.Water Quality 13
3.1.4.Flora and Fauna 14
3.1.5.Community Relations 15
3.1.6.Tra c 15
3.1.7.Waste Management 15
3.1.8.Noise 16
3.1.9.Heritage 16
3.1.10.Hazardous Materials 17
3.1.11.Soil Contamination 17
3.3. Environmental Control Plan 18
3.4. Environmental Schedules 18
M&J Marine Services Page 3 Environmental Management Plan
ffi
Page 4
4. Monitor and Review 18
4.1. Environmental Monitoring 18
4.2. Environmental Auditing 18
4.3. Communication 19
4.4. Complaints 20
4.5. Corrective Action 20
4.6. Environmental Management Plan Review 21
Attachment 1: Environmental Licences, permits and approvals 22
Attachment 2: Environmental Schedules 23
Attachment 3: Environmental Risk Assessment 35
Risk Assessment table 35
Risk Control 35
M&J Marine Services Page 4 Environmental Management Plan
Page 5
1. Background
1.1. Introduction
This Environmental Management plan “EMP” specifies, at a strategic level, the
safeguards and controls proposed in order to manage potential environmental
impacts from any works carried out by M&J Marine During Oyster Reef
Rehabilitation projects In Noosa.
1.2. Environmental policy
M&J Marine Services is committed to leading the industry in minimising the impact of its activities
on the environment.
In particular, we will achieve this through our commitment to:
• comply with all relevant legislation and regulations;
• regularly review the environmental impact of our activities, endeavour to reduce our overall
environmental impact and prevent waste using best practice techniques
• Integrate this Environmental Policy into work practices
• Maintain adequate hazardous waste materials management and disposal procedure records;
• Ensure that all accidents and incidents, which pose potential harm to the environment, are reported
to the relevant statutory authority, that internal investigations are carried out, and that
• recommendations arising out of investigations are implemented where practicable.
• Ensure that all employees receive training to perform their tasks in a manner designed to comply
with legislative requirements and minimise any negative impact on environment;
• Ensure that employees and contractors adopt a high standard on environmental responsibility in
the workplace and off the job;
• Ensure that all contractors are inducted and have a site induction for the site that they will be
working at.
• Consult with employees about environmental matters which may affect them;
• Implement the Environmental Management Policy in consultation with employees
All employees are responsible to ensure that they comply with the policies and procedures of the Company.
This Policy applies to all employees and contractors of M&J Marine Services
1.3. Project Description
This is a general EMP for all construction works either from the water or on the land, Job
specific environmental considerations and controls will be detailed in the JSEA and detailed
within the morning toolbox talks as seen necessary.
EMPs for Future works that require a project specific EMP will include;
• Overview of the project
• Scope of Construction works
• Description of the construction (disturbance) footprint
• Timing of the works
• Site Plan
M&J Marine Services Page 5 Environmental Management Plan
Page 6
2. Environmental Management Structure and
Responsibilities
2.1. Director/ manager
• Ensure this EMP is developed and reviewed with adequate consultation; and
• Authorising approval and amendments to this EMP.
• promoting and maintaining good environmental management.
• Implementing this EMP, including education regarding critical changes to the controls or
safeguards are communicated to supervisors, employees and relevant contractors;
• Monitoring compliance with this EMP;
• Investigating reported non-compliances with this EMP.
2.2. On site Supervisor/ Person in charge
• Inducting all workers and sub contractors and directing all site activities in accordance
with this EMP
• To ensure they and their team members comply with this EMP;
• To ensure adequate and appropriate instructions regarding this EMP are provided to new
staff, other contractors as well as any relevant third parties
• To report non-compliances with this EMP to Management;
• To complete any required documentation associated with this EMP.
2.3. Employees and Sub Contractors
• To comply with this EMP;
• To follow instructions from the supervisor or person in charge regarding this EMP;
• To report all potential environmental impacts/ hazards to your supervisor as soon as
possible
Project Manager
Jay Maartensz
Site Supervisor
John Matelone / Jay Maartensz
Employees / Sub Contractors
workers Table 2.1 Project Environmental Roles & Responsibilities
Matrix
M&J Marine Services Page 6 Environmental Management Plan
Page 7
Pro
ject Site Subc
Work
TASK Ma Superv ontra
ers
nag isor ctors
er
Inducting workers and subcontractors and directing
2 1 2 2
site activities in accordance with the EMP.
Identifying, assessing and eliminating any non-
compliance or environmentally risky conditions and 1 1 2 2
documenting the risk controls implemented.
Promoting and maintaining good environmental
management in accordance with the relevant 1 1 2 2
environmental legislation, regulations and laws.
Implementing practical measures to ensure the site
2 1 2 2
complies with the EMP and project specifications
Maintaining, providing updates and supplying this
1 2 2 2
EMP to relevant authorities and workers.
Monitoring and assessing subcontractors for the
project to ensure environmental regulations are met 1 2 2 2
and relate to the works undertaken
Maintaining stocks for environmental control 1 1 2 1
Provide and maintain a hazardous substances register
for hazardous substances used and stored in the 1 1 2 2
workplace;
1 = has responsibility for the overall implementation and / or management of the process/procedure on the
project
2 = has responsibility for complying with the process/procedure on the project
M&J Marine Services Page 7 Environmental Management Plan
Page 8
2.4. Approval and Licensing Requirements
Licences, permits and approvals required for this project are summarised in Table 2.2
below. SMADS will ensure that any licences, permits and approvals are obtained prior to
work commencing. A copy of all licences, permits and approvals are included in
Attachment 1 of this EMP.
Table 2.2 Summary of Licences, permits and approvals
Regulatory Licence / Permit / Summary of Key Conditions
Status
Authority Approval Type and Monitoring Required
All works must be undertaken in
Development accordance with Best Practice
Noosa Council Approved Erosion and Sediment
application
Control (BPESC)
Hold appropriate DA approvals
Department of Resource
and comply with all conditions,
agriculture and Allocation Approved
reefs to be designed to minimise
fisheries Authority
impact on existing habitat
2.5. Environmental Training
All M&J Marine workers who will be working on site shall receive site-specific induction
training. The induction training will include:
• familiarisation with the requirements of this EMP;
• environmental emergency response training; and
• familiarisation with site environmental controls.
M&J Marine may combine the Work Health and Safety (WHS) and Environmental
induction into one. A record of the site induction will be made on the Site Environmental
Induction Register (see Attachment 2).
2.6. Emergency Contacts and Response
This EMP sets out M&J Marines management of environmental emergencies during the
project. It includes:
• the names of key emergency response personnel and contact details (including all-
hours telephone numbers);
M&J Marine Services Page 8 Environmental Management Plan
Page 9
• contact details for emergency services (e.g. ambulance, fire brigade, spill clean-up
services);
• the location of on-site information on hazardous materials, including SDS (Safety
Data Sheets) and spill containment material;
• steps to follow to minimise damage and control the emergency; and
• instructions and contact details for notifying the Site Supervisor, EPA, local council,
nearby residents or the community if necessary.
Key Emergency Response Personnel
Jay Maartensz will be the first point of contact when an incident or spill occurs. He can be
contacted 24 hours a day. Contact details including emergency services are included in
Table 2.3.
Table 2.3 Emergency Response Contact Details
Project Contact Details
Emergency Services
Ambulance, Fire or Police 000
Poisons Information 13 11 26
First Aiders
Jay Maartensz 0457 425 260
Ian Johnson 0412 517 640
Utilities
Water 132 203
Electricity 131962
Gas 1800 427 532
Dial Before You Dig 1100
EPA (24 hour pollution line) 1300 130 372
Project Manager
Jay Maartensz 0457 425 260
Officer / Site Supervisor
John Matelone 0412 521 943
M&J Marine Services Page 9 Environmental Management Plan
Page 10
2.7. Hazardous Substances
M&J Marine will maintain an up-to-date register of Hazardous Substances and Safety
Data Sheets (MSDS) for all materials used on the project (see Attachment 2).
Controlled, updated copies of these SDS will be readily available to the Project Manager
and Site Supervisor and prominently displayed at the worksite.
2.8. Emergency Response Procedures
2.8.1. Fire Emergency
Steps to manage a fire emergency:
• Call ‘000’ as soon as possible. If ‘000’ does not work on your mobile phone call
‘112’;
• If safe to do so leave the work area. If unsafe to leave, seek refuge in a safe area
immediately;
• Go to the designated Emergency Assembly Area or to a clear/open area;
• Make sure all workers are present and accounted for, do not return to the work area
to locate any missing workers; and
• Notify the Site Supervisor and wait for instructions.
2.8.2. Gas Leak Emergency
Steps to manage a gas leakage emergency:
• Call the Site Supervisor immediately, if deemed necessary call the Fire Brigade on
‘000’. If ‘000’ does not work on your mobile phone call ‘112’;
• Site Supervisor to immediately arrange to turn off the gas supply;
• Site Supervisor to turn off the site’s electrical supply;
• If deemed necessary notify all persons to evacuate the work area and assemble at the
Emergency Assembly Area;
• Control the movement of people to the Emergency Assembly Area;
• Check all workers and others are in attendance; and
• Remain at the Emergency Assembly Area until notified that the area is safe to
reoccupy.
M&J Marine Services Page 10 Environmental Management Plan
Page 11
2.8.3. Leak Or Spill Emergency
Steps to manage any Leak or Spill in a work site:
• Identify the source of the problem;
• Stop goods leaking;
• Contain spilt material, using spills kit or sand;
• Notify officer or Site Supervisor;
• Remove spilt material and place in sealed container for disposal (if possible); and
• Site Supervisor to record incident.
OR
• as suggested on Safety Data Sheet (SDS)
M&J Marine Services Page 11 Environmental Management Plan
Page 12
3. Implementation
3.1. Risk Assessment
The risk to the environment of carrying out the project has been considered and documented
Please see attached documentation
3.2. Environmental Management Activities and Controls
The following environmental management activities, mitigation and control measures will
be adopted to prevent or minimise environmental impacts
3.2.1.Air quality
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Emissions of air pollutants from motor vehicles, vessels & plant
Regular maintenance of machinery.
Ongoing during
Workers instructed not to leave machinery Site Supervisor
project
idling when not in use.
Potential Impact: Dust generated from movement of plant and equipment
Disturbance of site will be monitored and
Ongoing during
the site will be restored prior to carrying Site Supervisor
project
out earthworks in new area.
Excavated materials will be stocked piled
and where possible re-used on site. Excess
Ongoing during
materials to be disposed of in accordance Site Supervisor
project
with the Protection of the Environment
Operations Act 1997.
Where significant dust is generated, the Ongoing during
Site Supervisor
work area will be watered down. project
3.2.2. Erosion and Sediment Control
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Site erosion and sediment laden water leaving the site
Sediment and erosion control fencing will be
Ongoing during
installed as required and left in place until all Site Supervisor
project
works are complete.
M&J Marine Services Page 12 Environmental Management Plan
Page 13
Silt Booms will be deployed at build sites as
needed to control excessive plumes and
Ongoing during
turbidity caused by the reed construction. Site Supervisor
project
They will also be used on the load site as
needed
Erosion control measures will be monitored and Ongoing during
Site Supervisor
maintained throughout the project. project
After heavy rain, all sediment and erosion Ongoing during
Site Supervisor
controls will be checked and made good. project
3.2.3. Water Quality
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Contamination of water due to chemicals, fuels or wastes
Storage of fuels, chemicals and wastes will Ongoing during
Site Supervisor
be clear of stormwater or drainage lines. project
Safety Data Sheet (SDS) of hazardous
Ongoing during
substance will be referred to when spills Site Supervisor
project
occur.
Work site will hold a spill kit to contain site Ongoing during
Site Supervisor
spills. project
All hazardous substances on site will be
Ongoing during
recorded in the Hazardous Substances and Site Supervisor
project
Safety Data Sheet Registers.
M&J Marine Services Page 13 Environmental Management Plan
Page 14
3.2.4. Flora and Fauna
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Damage to trees and root systems
At the commencement of works sea grass
will be marked out with star pickets or
Ongoing during
alternatively a “Chanel” will be marked Site Supervisor
project
where it is suitable to transit with minimal
disturbance to the sea grass
Excavation near trees to be kept will be
Ongoing during
avoided and stockpiles kept clear of any Site Supervisor
project
tree.
Potential Impact: Disturbance to endangered species
Where an endangered species is identified,
Ongoing during
works will stop immediately and the Site Supervisor
project
relevant authority notified.
Protective fencing will be installed around
Ongoing during
trees and areas where endangered species Site Supervisor
project
are found.
Any fauna species encountered on site will
Ongoing during
be relocated by a qualified wildlife carer Site Supervisor
project
from an organisation such as WIRES.
Potential Impact: Spread of weeds
Weeds will be removed from the site and Ongoing during
Site Supervisor
composted or disposed of to prevent spread. project
M&J Marine Services Page 14 Environmental Management Plan
Page 15
3.2.5. Community Relations
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Public amenity
Community consultation and information
Ongoing during
events are being co ordinated by the Project Manager
project
principle.
3.2.6. Traffic
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Parking and access to site
Nominated parking areas will be allocated Ongoing during
Project Manager
on site. project
Residents and property owners will be
Ongoing during
notified about the possibility of an increase Project Manager
project
in traffic.
3.2.7. Waste Management
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Unacceptable disposal of site waste
All material waste will be recorded in the Ongoing during
Site Supervisor
Waste Register. project
All waste removed from site will be
disposed of in accordance with the Ongoing during
Site Supervisor
Protection of the Environment Operations project
Act 1997 (POEO ACT 1997).
Appropriate space will be provided for the
temporary storage of garbage, recyclable Ongoing during
Site Supervisor
and compostable waste to ensure separation project
of waste products.
During works, on-going checks will be
carried out to ensure correct separation and Ongoing during
Site Supervisor
re-use of recyclable materials is being project
maintained.
M&J Marine Services Page 15 Environmental Management Plan
Page 16
Where possible all existing building and Ongoing during
Site Supervisor
excavation materials will be re-used on site. project
3.2.8. Noise
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Unacceptable noise levels and vibrations
Work equipment will be maintained in good
working order to comply with EPA Ongoing during
Site Supervisor
guidelines. Where required, noise project
suppressors will be installed.
Hearing protection will be worn eg Ongoing during
All workers
earplugs or earmuffs. project
Work will take place during nominated Ongoing during
Site Supervisor
work hours only. project
3.2.9. Heritage
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Damage to heritage items
All heritage items will be identified and Ongoing during
Site Supervisor
fenced off prior to commencing works. project
All workers and visitors will be notified of Ongoing during
Site Supervisor
any heritage items on site. project
No items will be stored or work undertaken Ongoing during
Site Supervisor
within the boundary of a heritage item. project
If heritage items are found during the
course of works, work will stop Ongoing during
Project Manager
immediately and the relevant authorities project
notified.
M&J Marine Services Page 16 Environmental Management Plan
Page 17
3.2.10. Hazardous Materials
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Spills and uses of hazardous materials
All hazardous and/or intractable wastes are
Ongoing during
to be disposed of in accordance with Site Supervisor
project
relevant Authority and EPA requirements.
All hazardous waste removed from site will
be disposed of in accordance with the Ongoing during
Site Supervisor
Protection of the Environment Operations project
Act 1997 (POEO ACT 1997).
Safety Data Sheet (SDS) of hazardous Ongoing during
Site Supervisor
substance will be referred to if spills occur. project
All hazardous substances will be recorded
in the Hazardous Substances Register and Ongoing during
Site Supervisor
the SDS recorded in the Safety Data Sheets project
(SDS) Register.
3.2.11. Soil Contamination
Timing /
Control Measure Responsibility
Frequency
Potential Impact: Spillage and leaking of hazardous material into the soil
Regular maintenance will be undertaken on
all machinery and transport vehicles to Ongoing during
Site Supervisor
ensure there are no fuel or oil spills or project
leaks.
Only trained workers will handle hazardous Ongoing during
Site Supervisor
materials. project
All materials will be labelled and stored in Ongoing during
Site Supervisor
a lock-up with an impervious floor. project
Safety Data Sheets (SDS) for all hazardous Ongoing during
Site Supervisor
materials will be kept on site. project
All site workers will be trained in spill Ongoing during
Site Supervisor
management. project
M&J Marine Services Page 17 Environmental Management Plan
Page 18
3.3. Environmental Control Plan
The key features of the environmental management for this project is to keep good control
on the following;
• waterways and drains
• erosion and sediment controls
• work areas, machinery or vehicle parking, waste management areas, fuel and chemical
stores
• vegetation requiring protection
• traffic management
• monitoring locations
• environmentally sensitive areas on and adjacent to the site
3.4. Environmental Schedules
This EMP refers to a number of environmental schedules comprising forms, registers and
checklists. They are listed below and included in Attachment 2.
1. Site Environmental Induction Register
2. Site Environmental Inspection Checklist
3. Environmental Complaint Form
4. Non-Conformance Report Form
5. Hazardous Substances Register
6. Safety Data Sheets (SDS) Register
7. Waste Register
4. Monitor and Review
4.1. Environmental Monitoring
M&J Marine will monitor the environmental controls listed in Section 3.2 through regular
site environmental inspections.
Site environmental inspections will be undertaken halfway through the job and will be
recorded by the Site Supervisor on the Site Inspection Checklist (see Attachment 2).
4.2. Environmental Auditing
Planned and documented audits aimed at evaluating the environmental conformance of the
project will be carried out by SMADS. Any deficiencies identified during the audits shall
be documented and actioned in accordance with SMADS corrective action process (see
Section 4.5).
M&J Marine Services Page 18 Environmental Management Plan
Page 19
The audits to be carried out and their frequency are listed in Table 4.1.
Table 4.1 Project Audit Plan
Audit Type Frequency Record Auditor
Project
Half way through
Environmental Manager /
the project Audit Report
Management Plan External
duration
Auditor
Project
Sub-contractor Half way through
Manager /
Environmental the project Audit Report
External
Performance Audit duration
Auditor
Site
Environmental
Site Inspection weekly / monthly Site Supervisor
Inspection
Checklist
4.3. Communication
To minimise impacts on the public by the project, residents and adjacent property owners
will be notified before the works commence and at appropriate stages during the project.
They will be informed of details of the intended work, the duration of the activities,
information regarding any access interruptions and details of whom to contact with
questions regarding the work. The Project Manager will seek permission if there is any
need to access private property.
Project Signage will be erected at the site.
M&J Marine will undertake external and on-site communication in case of environmental
incidents and emergencies, including communication with subcontractors. External
communication will include informing nearby residents of proposed work, incidents and
emergencies and contacting regulatory agencies if required.
M&J Marine Services Page 19 Environmental Management Plan
Page 20
4.4. Complaints
Community groups, clients, interested parties, etc may advise of practices, activities and
processes that are related to the environment by a variety of methods. These may include a
non-conformance report, fax/letter, telephone complaint, newspaper/magazine report and
verbal protest.
On receipt of a complaint, the person receiving the complaint will notify the Project
Manager and the complaint will be recorded using the Environmental Complaint Form
(see Attachment 2). The Project Manager will follow up the complaint and take
corrective action as required.
4.5. Corrective Action
A non-conformance occurs when a procedure or environmental control is not followed or
does not perform as required by this EMP. M&J Marine will monitor non-conformances to
the EMP and initiate corrective and preventive action where required. All non-
conformances will be recorded on the Non-Conformance Report Form (see Attachment
2). M&J Marine will undertake corrective action in case of incidents that have an
environmental impact or works not carried out according to the required standard.
Procedures for identifying corrective action include:
• an EMP review;
• investigation into the causes of incidents and recording of the results; and
• evaluating further environmental risks.
M&J Marine Services Page 20 Environmental Management Plan
Page 21
4.6. Environmental Management Plan Review
This EMP will be reviewed by the Project Manager as required to ensure its continuing
suitability and to ensure it is conforming to the EMP’s environmental objectives and legal
requirements. Reviews will be undertaken as necessary as a result of any of the following:
• when there is a change in the scope of the project that requires a change in
environmental controls;
• when there is a need to improve performance in an area of environmental impact;
• at the completion of environmental audits as required;
• as a result of changes in environmental legislation applicable and relevant to the
project; and
• as required by Jay Maartensz.
Reasons for making changes to the EMP will be documented. A copy of the original EMP document
will be kept for the project records.
The Project Manager is authorised to change and re-issue the EMP. The Site Supervisor is to be
informed of any changes made by the Project Manager.
The Site Supervisor is responsible for ensuring the work crew are complying with the current EMP,
and for informing the work crew of any changes. The Site Supervisor is responsible for ensuring the
workers are aware of changes before starting any works.
M&J Marine Services Page 21 Environmental Management Plan
Page 22
Attachment 1: Environmental Licences, permits and approvals M&J Marine Services Page 22 Environmental Management Plan
Page 23
Attachment 2: Environmental Schedules 1. Site Environmental Induction Register 2. Site Environmental Inspection Checklist 3. Environmental Complaint Form 4. Non-Conformance Report Form 5. Hazardous Substances Register 6. Safety Data Sheets (SDS) Register 7. Waste Register M&J Marine Services Page 23 Environmental Management Plan
Page 24
SITE ENVIRONMENTAL INDUCTION REGISTER
Record of persons receiving environmental induction for this site
Project Name: Date:
Address:
Name of
Inductor: Telephone:
Topics Covered:
I have attended this induction and have read and understood the environmental rules of this
site and EMP.
Induction
Number Worker
Date Worker Name Supervisor
(e.g. general induction Signature
card, license)
M&J Marine Services Page 24 Environmental Management Plan
Page 25
SITE ENVIRONMENTAL INSPECTION CHECKLIST
PROJECT DETAILS
Project
Name:
Contact
Name: Telephone:
Email Date:
ENVIRONMENTAL ISSUES
N/
Erosion and Sediment Control Yes No Comments
A
Has an erosion and sediment control plan
been created.
Are sediment and control measures in
place for construction works e.g. sediment
traps, sediment fences etc.
Are these being maintained and kept in
correct working order.
Have materials been contained or placed
in designated areas to be away from
stormwater drains/runoff.
Are designated washout areas in place
away from storm water drains.
Is relevant protection in place surrounding
flora to stop any damage.
Is the site maintained and cleared away
daily of all soil, earth, mud, clay and
concrete waste that may cause an
environmental issue.
N/
Waste Management Yes No Comments
A
Has a Waste Management Plan been
created and implemented.
Have stock piles or designated waste areas
been created.
Is the waste being stored in such an area as
not to pollute or contaminate stormwater
drains.
Have excess materials been recycled,
reused or returned.
M&J Marine Services Page 25 Environmental Management Plan
Page 26
N/
Hazardous Materials Yes No Comments
A
Are spill kits available and held on site.
Are spills attended to and cleaned up
immediately.
Are procedures in place noting the correct
methods for removing Asbestos.
Is there a designated storage area for
hazardous materials where leaks can’t
flow to open ground or drains.
Are all hazardous material containers
sealed properly and no leaks evident.
Are Safety Data Sheet (SDS) on site for
all hazardous materials
N/
Air Quality Yes No Comments
A
Does all plant and equipment comply with
the relevant codes and emission standards
for air quality
N/
Noise Management Yes No Comments
A
Are procedures in place to minimise noise
to workers, site and surrounding areas.
Does all plant and equipment comply with
the relevant codes, guidelines and
standards for noise control
Company Representative Name:__________________________________________________
Company Representative Signature:_________________________________________________
Date: ___________________________
M&J Marine Services Page 26 Environmental Management Plan
Page 27
ENVIRONMENTAL COMPLAINT FORM Project Name: EC Number: Address: Date: EC issued to: EC issued by: M&J Marine Services Page 27 Environmental Management Plan
Page 28
ENVIRONMENTAL COMPLAINT DETAILS
Environmental Incident
□ Pollution □ Potential pollution
□ Other:
DETAILS OF COMPLAINT
Name: Address:
Position: Contact No
NATURE OF COMPLAINT
□ Dust □ Vibration
□ Noise □ Soil contamination
□ Water □ Plant/machinery
□ Pollution □ Waste
□ Flora/fauna □ Erosion and sediment controls
□ Heritage □ Other:
INCIDENT DETAILS
Location of
Time:
incident:
Date:
Description:
Conditions of site when complaint occurred:
Corrective or preventive action to be taken to Date to be
Responsible person
fix the complaint completed by
SIGN OFF
Corrective or preventive action is complete and dealt with by the responsible person noted
above
Name: Date:
M&J Marine Services Page 28 Environmental Management Plan
Page 29
Signature: ………………….agrees corrective or preventative is complete Name: Date: Signature: M&J Marine Services Page 29 Environmental Management Plan
Page 30
NON-CONFORMANCE REPORT FORM
Project Name: NCR Number:
Address Date:
NCR issued to: NCR issued by:
NON CONFORMANCE DETAILS
Area of Non Conformance
□ Site Establishment □ Work Health and Safety
□ Works outlined in contract □ Environmental Management
□ Supplier □ Quality Management
□ Customer complaint □ Other:
Description of Non Conformance
Outline the evidence obtained for Non Conformance
Corrective or preventive action to be taken to Date to be
Responsible person
fix the Non Conformance completed by
Sign Off
M&J Marine Services Page 30 Environmental Management Plan
Page 31
Corrective or preventive action is complete and dealt with by the responsible person noted above Name: Date: Signature: …………………… agrees corrective or preventative is complete Name: Date: Signature: M&J Marine Services Page 31 Environmental Management Plan
Page 32
HAZARDOUS SUBSTANCES REGISTER
Clearly
SDS on Site
Product Location where Quantit Labeled
Action / Comments
Name Product is Used y Yes /
Yes / No Date
No
An SDS is a Safety Data Sheet – these are available from the substance manufacturer or the point of purchase. SDS must be on site
together with the hazardous substance.
Action / Comments - note any particular safety controls required e.g. use, transport, PPE, first aid, storage, spill control and whether
each substance is classified as hazardous (according to NOHSC) or dangerous goods for transportation (according to ADG code).
M&J Marine Services Page 32 Environmental Management Plan
Page 33
SAFETY DATA SHEET (SDS) REGISTER
Prepared By:
SAFETY DATA SHEET REGISTER
SDS Number Date of Issue Worker Description Date Reviewed* Signed
*Check SDS is current before starting each project.
SDS must not be more than five years old from date of issued date.
Refer to: Safe Work Australia Code of Practice - Preparation of Safety Data Sheets for Hazardous Chemicals
M&J Marine Services Page 33 Environmental Management Plan
Page 34
WASTE REGISTER
Project Name:
Address:
TO
Waste
TAL On-site Re-
Materi
amo use Off-site Re-use
al Type Dat
unt (Specify amount (Specify contractor Off-site Disposal
e.g. soil, e and recycler)
rock,
3(m re-use onsite and
vegetation and/or intended use)
etc. tonnes
)
amoun
amount use/ amount pick up
name of t name of
(m3/ locati (m3/ time/ destination
recycler (m3/ contractor
tonnes) on tonnes) date
tonnes)
M&J Marine Services Page 34 Environmental Management Plan
Page 35
Attachment 3: Environmental Risk Assessment
The Environmental Risk Rating of an identified impact is measured in terms of consequence
(severity) and likelihood (probability) of the event happening.
Risk Assessment table
Consequence or Impact of Hazard Risk Level A P U Likelihood/ Risk Rating
Probability
H - Significant detrimental environmental impact, H = High 1 1 2 A = Almost certain 1 = Immediate
potential death, permanent or long term disability could happen at any action is required
or illness, time
M - Short term environmental impact, potential M= 1 2 3 P = Possible risk could 2 =Control the
temporary disability or illness requiring medical Medium happen occasionally risks/ hazards
attention a.s.a.p.
L - Minimal environmental impact, potential minor L = Low 2 3 3 U = Unlikely may 3 =Control risks
injury requiring first aid happen rarely with routine
procedures
Risk Control
Eliminate – ‘Design out’ the hazard when new materials,
equipment and work systems are being purchased for the site;
Substitute - Substitute less hazardous materials, equipment or
substances;
Isolate – separate the environment/workers from hazards using
barriers, enclosing noisy equipment;
Engineering – use engineering controls to reduce the risks.
Make sure that appropriate environmental controls are
available and used correctly;
Administrative – Minimise the risk by adopting safe and
environmentally appropriate working practices or providing
appropriate training, instruction or information;
Personal Protective Equipment – Make sure that appropriate
PPE is available and used correctly.
M&J Marine Services Page 35 Environmental Management Plan
Page 36
M&J|/ MARINE Services M&J Marine Services Page 36 Environmental Management Plan
Page 37
Marine Plant and water quality monitoring pla
Project Name: Noosa Oyster Ecosystem Restoration Projec
Project Location: Various Locations within the lower Noosa River
Client: The Nature Conservancy Australia “TNC”
Contract No : K21-22-35b
ABN: 766 242 991 45 Page 1 [email protected]
t
n
Page 38
1. Introduction 3
1.1.General 3
1.2.Project Background 3
2. Objective 3
3. References 3
4. Construction Methodology 4
5. Existing Environment 5
6. Monitoring Process 5
6.1. Protective measures 5
7. Record keeping and reporting 5
ABN: 766 242 991 45 Page 2 [email protected]
Page 39
1. Introduction
1.1. General
This document describes the intended marine plant and water quality monitoring plan for
the Noosa Oyster Ecosystem Restoration project as further described in the Contract
between The Nature conservancy and M&J Marine Services PTY LTD
1.2. Project Background
The estuarine environment of the Noosa River was once dominated with extensive rock
oyster ecosystems. Oyster ecosystems were largely lost however, in the late 1800s to early
1900s. At the peak of the wild oyster harvest industry (1906-1907), it is estimated that 2-3
million oysters were harvested in the lower estuary each year. The commercial oyster
industry in the Noosa River ceased to be economically viable by the 1940s.
This project responds to the loss of natural hard substrates in the Noosa River by re-
introducing locally sourced rock in configurations that rock oysters and associated species
(e.g. pearl oysters, leaf oysters, hairy mussels, tunicates and macroalgae) readily colonise.
The design and placement of the rock substrate considers historic location of oyster beds
plus physical features, such as aspect, height, dimensions and rugosity in a way that can
help mitigate physical and biological threats to the recovering ecosystem such as
smothering, heat, erosion, predation and human disturbance.
2. Objective
The objective of this Marine plant and water quality plan is to ensure minimal impact to
the river system and its existing marine life during the construction by monitoring our
impacts and controlling them with the use of floating silt booms if required.
We will do this by;
• Identifying whether the impacts on water quality on the active build site and
general water based works are local and temporary
• Identifying when a plume has the potential to cause adverse social and/or
environmental impacts and to provide the opportunity to limit these impacts with
particular attention to the adjacent sea grass and mangrove areas.
3. References
This document should be read in conjunction with the Project’s Construction Environmental
Management Plan (CEMP), which is the over-arching plan that details the procedures and
policies to be following in executing these works.
ABN: 766 242 991 45 Page 3 [email protected]
Page 40
4. Construction Methodology
The Reef patches are to be comprised of locally sourced igneous porphyry rock (the
substrate) with a size range of 100mm to 600mm.
The substrate will be loaded onto the barge using a Posi - track loader and excavator, the
barge then travels to the build site which will have individual patches marked out using a
combination of marker buoys and star pickets, located using GPS.
Once on site the barge uses steel spuds rather than anchors to ensure precise placement of
the barge and to eliminate both swing and potential environmental damage from anchor
chains.
The barge is then unloaded using an excavator with a customised thumb and blade
attachment which allows us to pick up the rock and place it into the water precisely and
carefully, minimising plumes.
ABN: 766 242 991 45 Page 4 [email protected]
Page 41
5. Existing Environment
The areas of the Noosa River that the restoration sites are located naturally have a high mount of
turbidity and after storm events the turbidity would be higher. The department of environment and
resource management QLD has recorded the average turbidity of the lower Noosa river between 1
and 4 NTU and the upper estuary averaging up to 20 NTU. The High turbidity that comes with
storms and flood events are considered natural phenomena and species within the local marine
environment are able to tolerate these conditions for short periods. We don’t expect the Plumes
created from reef construction to impact the environment as much as one of these natural events.
6. Monitoring Process
Monitoring Frequency Responsibility
Visual inspeciton Before commencement of works, M&J Marine
daily whilst marking out individual
patches
Aerial Photography Before commencement of works M&J Marine
After rst load in each area
Weekly if impacts appear to be
low
Site Photographs Before and after each site is M&J Marine
complete - on low tide.
6.1. Protective measures
Our first step in protecting the local environment is to identify and and clearly mark all
sensitive habitats. Once marked we will ensure that the vessels propellors as much as
practical do not transit over these areas, when this is not practical we will ensure that engines
are trimmed up as much as possible and also, as much as possible, drift over these areas in
neutral if there is not practical alternate route.
Once on site and building if large plumes are detected and seen to be travelling towards or
over sensitive areas such as sea grass then a floating silt boom will be deployed to prevent
the plumes from impacting the environment.
If the plumes are minor and are not impacting the sensitive areas the silt booms will not be
used as dragging of the weights and curtains can potentially be more harmful to the
immediate environment than the sediment plumes that they are catching.
In addition to plume monitoring and control we are also using a very clean rock supply with
minimal sediment within the load and we are placing conveyor belt rubber under the stock
piles to minimise / eliminate picking up sediment from the natural ground under the stock
piles, this method has been proven to reduce the amount of unintended material being picked
up by 90 - 100%.
7. Record keeping and reporting
M&J Marine will keep all photos, both aerial and onsite, for a minimum of 12 moths from project
completion. They will be given to the principal (TNC) at the end of the job or as required on request.
In the event that the use of a silt boom on the build sites is triggered the principal will be notified
immediately and the success of this management strategy will be reported on daily.
In the unlikely event it is found to be ineffective other methods will be considered including the use
of a second curtain however based on experience we don’t expect this to be the outcome.
ABN: 766 242 991 45 Page 5 [email protected]
fi
Page 42
Erosion and Sediment Management Plan
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 16/06/2021
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:400
Noosa Oyster Ecosystem Restora on Project:
Supply of services to construct rock oyster reef founda ons at select sites
in the Noosa River estuary
ABN: 766 242 991 45 Page 1 [email protected]
ti
ti
Page 43
General:
1. ESCP Refers to Erosion and Sediment Control Plan.
2. ESC Refers to Erosion and Sediment control
3.Sediment includes but is not limited to clay, silt, sand ,gravel, soil, mud, cement and ceramic waste
4.Any reference to IECA White books (2008) refers to IECA 2008 Best Practice Erosion and Sediment
control. Books 1-6 International Erosion Control (Australasia) Picton NSW
The ESCP:
5. The ESCP and its associated ESC measures shall be constantly monitored , reviewed and modified as
required to correct deficiencies. Council has the right to direct changed if, in its opinion the measures that
are proposed or have been installed are inadequate to prevent pollution.
6. Prior to any activities onsite the responsible person(s) is to be nominated. The responsible person shall
be responsible for ESC measures onsite. The Name ,address and 24 hour contact can be found within
the M&J marine Environmental Management plan which will be submitted to council. Council Shall be
advised within 48 hours of any changes to the responsible person(s), or their contact details, in writing
7. The approved ESCP shall be available on site for inspection by Council officers while work activities are
occurring
8. The implementation of the ESCP shall be supervised by personnel with appropriate qualifications and /
or experience in ESC on construction sites.
9. All ESC measures shall be appropriate for the sedate type of the soils onsite, in accordance with the
IECA white books or other current recognised industry standard for ESC for Australian conditions.
10. All works shall be carried out in accordance with the approved ESCP (as amended from time to time)
unless circumstances arise where;
A. Compliance with the ESCP would increase the potential for environmental harm; or
B. Circumstances change during construction and those circumstances could not have been
foreseen; or
C. Council determines that unacceptable off-site sedimentation is occurring as a result of a land
disturbing activity. In either case the person(s) responsible may be required to take additional,
or alternative protective action and/or undertake reasonable restoration works within the
timeframe specified by council.
11. M&J Marine shall ensure adequate supply of ESC, and appropriate pollution clean up materials are on
site at all times.
Site Access
12. The Site will be accessed by Hilton Esplanade, the sealed road will be monitored and swept clean daily
or as required if trucks are transferring sediment onto the road.
ABN: 766 242 991 45 Page 2 [email protected]
Page 44
Site Monitoring
13. The ESC will be monitored daily by the designated person(s)
14. The designated person must ensure that if a > 50% probability of rain event of >20mm (surface water) is
expected through a Bureau of Meteorology forecast over a 24 hour period, or if a short term pulse event
such as a thunderstorm occurs environmental controls are inspected and adapted to withstand the event
and remain effective.
15. The designated person must ensure that any disturbed areas are stabilised and rehabilitated as soon as
construction work is completed. Land based sediment and erosion controls must stay in place and be
maintained until the site is completely stabilised
Proposed Erosion and sediment controls to be in place on load site
Symbol Technique
Floating Silt Boom
Sediment Fence Barrier
ABN: 766 242 991 45 Page 3 [email protected]
Page 45
Biosecurity risk management
M&J Marine Services Pty Ltd
Noosa Oyster Ecosystem Restora on Project:
Supply of services to construct rock oyster reef founda ons at select
sites in the Noosa River estuary
2022
ti
ti
Page 46
Content 1.PROJECT OVERVIEW 2.PURPOSE 3.SCOPE 4.MANAGEMENT RESPONSIBILITIES . 5.BIOSECURITY HAZARDS............ weed 6.SITE/PREMISE DETAILS.......... weed 7.OPERATIONAL PROCEDURES 8. MONITORING 9.REPORTING 1O.CONTACTS .......sccssssseceesssccecesseneeeeesseeeeesesseeeesessseeessessseeeesesseeeeessaeeeeeeesneeeeesenseeereesaeeeeseenaees 6 Version: July 2022 Page 2
Page 47
1.Project overview
M&J Marine Pty Ltd is providing services to The Nature Conservancy (TNC) to construct rock
founda ons of oyster reefs in the Noosa River Estuary. The work is being undertaken against
engineered speci ca ons and state and local regulatory approvals.
The work includes the deployment of 3250 tonnes of igneous rock sources from quarries within
the Sunshine Coast region of Queensland.
M&J Marine will transport necessary barges, boats and heavy machinery, by land only, from
New South Wales to Noosa, Queensland to delivery this service.
The works will be undertaken in July and August 2022.
This document should be read in construc on with the Project Management Plan (V12) for this
work and M&J Marine Services Pty Ltd Construc on and Environmental Management Plan
(CEMP).
2.Purpose
Protec ng Australia’s biosecurity is a responsibility shared by government, industry and the
community. Biosecurity risk management prac ces implemented by industry can assist in
maintaining Australia’s pest and disease biosecurity status and signi cantly reduce
contamina on that leads to schedule slippage and increased project costs.
M&J Marine Services Pty Ltd is commi ed to maintaining Australia’s strict biosecurity status and
takes all necessary precau ons when moving vessels between Australian estuaries.
3.Scope
The scope of this document involves the proponent complying with Australia’s biosecurity
requirements by developing and implemen ng processes and procedures to mi gate
biosecurity risks during its opera ons.
Key ac vi es include:
Transport of vessels and equipment, by truck, from New South Wales to Noosa, Queensland
Cleaning and disinfec ng all equipment prior to deployment in the Noosa River.
Ensuring rock supply used in the construc on of oyster reefs is less than 50 percent
contaminated with soil/sediment and is free of foreign materials such as plas cs.
Maintenance of a load out site at Noosaville, on the shore of the Noosa River, which will be
maintained to a high standard of opera on, from which pollutants will not enter the estuary
and create a biofouling issue.
Version: July 2022 Page 3
ti
ti
ti
ti
ti
fi
ti
ti
ti
ti
tt
ti
ti
ti
ti
ti
ti
fi
ti
ti
Page 48
4.Management responsibili es
M&J Marine Services Pty Ltd takes responsibility for delivering biosecurity awareness
informa on and material for project personnel (e.g. induc on training, toolbox and pre-start
mee ngs)
Ensuring all vessels (barges) are cleaned and inspected before deployment
Repor ng possible biosecurity threats from related works to the Contractor (The Nature
Conservancy) and authori es.
5.Biosecurity hazards
Poten al biosecurity hazards from this project include the transloca on of marine plants and
biofouling organisms on barges used for the transport and deployment of rock.
6.Site/premise details
Work site loca ons
Version: July 2022 Page 4
ti
ti
ti
ti
ti
ti
ti
ti
ti
Page 49
The construc on load-out site is located on Hilton Esplanade, Noosaville.
7.Opera onal procedures
In this sec on detail the procedures that will provide assurance that the biosecurity integrity of
cargo is maintained.
Equipment Handling and Cleaning /treatment
Two barges will be relocated from New South Wales to Noosa, Queensland
The barges will be loaded onto trucks and transported to Noosa by road.
During loading, each barge will be pressure washed and sprayed with Virkon. Virkon is a premier
broad spectrum virucidal veterinary disinfectant that is recognised by industry and governments
worldwide as a disinfectant of choice for livestock disease preven on and control.
Each barge will then be transported to Noosa and air dried for 72 hours.
Virkon will then be reapplied to the barges on arrival in Noosa as an addi onal precau on.
Version: July 2022 Page 5
ti
ti
ti
ti
ti
ti
Page 50
8.Monitoring
During opera ons, biosecurity o cers will be invited to inspect the barges.
The construc on team will also inspect the barges on a daily basis.
9.Repor ng
Possible marine pest incursions will be reported on as they occur to the Contractor and
authori es.
Incursion responses will be coordinated with the Contractor and authori es.
Incursions and responses will be reported on in the weekly construc on report and/or nal
construc on report.
10.Contacts
Service provider contact:
Jay Maartensz: Director
M&J Marine Services PTY. LTD
8 Eleonora Close, Whitebridge, NSW 2290
M 0457 425 260
E [email protected]
ABN 766 242 99 145
Contractor contact:
Craig Bohm
Queensland Manager, Oceans
The Nature Conservancy
Email: [email protected]
Mobile: +61 410 872 435
DAF Biosecurity contact:
Dr Stephen Wesche
Principal Scien st
Department of Fisheries
Phone: 0475 945 704
Email: [email protected]
Version: July 2022 Page 6
ti
ti
ti
ti
ti
ti
ffi
ti
ti
fi