Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

220711 Noosa Oyster Project - CEMP

Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

              M&J Marine Services PTY. LTD.

              Environmental Management Plan




                      34 Ryan Road, Medowie, NSW 2318
                            ABN: 766 242 991 45



M&J Marine Services                Page 1               Environmental Management Plan
Log in to download the original file

220711 Noosa Oyster Project - CEMP.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 49 pages

Page 2

Document control
Version                 Date        Revision                                    Author

                      1 25/2/2019   Port Of Newcastle                           Jay Maartensz

                      2 15/5/2019   Sea Slip Marinas                            Jay Maartensz

                      3 1/12/2019   DPI Fisheries - Oyster reef pilot           Jay Maartensz

                      4 19/6/2020   Transport NSW - RMS                         Jay Maartensz

                      5 1/1/2021    DPI Fisheries - Oyster reef pilot stage 2   Jay Maartensz

                      6 1/10/2021   Port Macquarie Hasting Council - flood      Jay Maartensz
                                    Clean ups
                      7 14/4/2022   Narooma Oyster Reef Project                 Jay Maartensz

                      8 1/7/2022    Noosa River Oyster Reef Project             Jay Maartensz




M&J Marine Services                         Page 2                         Environmental Management Plan

Page 3

                                        Table Of Contents

      1.     Background                                                            5
           1.1. Introduction                                                       5
           1.2. Environmental policy                                               5
           1.3.     Project Description                                            5
      2.     Environmental Management Structure and Responsibilities               6
           2.1. Director/ manager                                                  6
           2.2. On site Supervisor/ Person in charge                               6
           2.3. Employees and Sub Contractors                                      6
           2.4. Approval and Licensing Requirements                                8
           2.5. Environmental Training                                             8
           2.6. Emergency Contacts and Response                                    8
           2.7. Hazardous Substances                                              10
           2.8. Emergency Response Procedures                                     10
                  2.8.1. Fire Emergency                                           10
                  2.8.2.Gas Leak Emergency                                        10
                  2.8.3.Leak Or Spill Emergency                                   11
      3.          Implementation                                                  12
           3.1.    Risk Assessment                                                12
                  3.1.1.Air quality                                               12
                  3.1.2.Erosion and Sediment Control                              12
                  3.1.3.Water Quality                                             13
                  3.1.4.Flora and Fauna                                           14
                  3.1.5.Community Relations                                       15
                  3.1.6.Tra c                                                     15
                  3.1.7.Waste Management                                          15
                  3.1.8.Noise                                                     16
                  3.1.9.Heritage                                                  16
                  3.1.10.Hazardous Materials                                      17
                  3.1.11.Soil Contamination                                       17
           3.3.     Environmental Control Plan                                    18
           3.4. Environmental Schedules                                           18

      M&J Marine Services                         Page 3        Environmental Management Plan
ffi

Page 4

4.      Monitor and Review                                                18
      4.1. Environmental Monitoring                                       18
      4.2. Environmental Auditing                                         18
      4.3. Communication                                                  19
      4.4. Complaints                                                     20
      4.5. Corrective Action                                              20
      4.6. Environmental Management Plan Review                           21
Attachment 1: Environmental Licences, permits and approvals               22
             Attachment 2: Environmental Schedules                        23
Attachment 3: Environmental Risk Assessment                               35
     Risk Assessment table                                                35
     Risk Control                                                         35




M&J Marine Services                    Page 4           Environmental Management Plan

Page 5

1.          Background
     1.1. Introduction
                This Environmental Management plan “EMP” specifies, at a strategic level, the
                safeguards and controls proposed in order to manage potential environmental
                impacts from any works carried out by M&J Marine During Oyster Reef
                Rehabilitation projects In Noosa.

     1.2. Environmental policy
        M&J Marine Services is committed to leading the industry in minimising the impact of its activities
        on the environment.

        In particular, we will achieve this through our commitment to:
        • comply with all relevant legislation and regulations;
        • regularly review the environmental impact of our activities, endeavour to reduce our overall
          environmental impact and prevent waste using best practice techniques
        • Integrate this Environmental Policy into work practices
        • Maintain adequate hazardous waste materials management and disposal procedure records;
        • Ensure that all accidents and incidents, which pose potential harm to the environment, are reported
          to the relevant statutory authority, that internal investigations are carried out, and that
        • recommendations arising out of investigations are implemented where practicable.
        • Ensure that all employees receive training to perform their tasks in a manner designed to comply
          with legislative requirements and minimise any negative impact on environment;
        • Ensure that employees and contractors adopt a high standard on environmental responsibility in
          the workplace and off the job;
        • Ensure that all contractors are inducted and have a site induction for the site that they will be
          working at.
        • Consult with employees about environmental matters which may affect them;
        • Implement the Environmental Management Policy in consultation with employees

All employees are responsible to ensure that they comply with the policies and procedures of the Company.
This Policy applies to all employees and contractors of M&J Marine Services

     1.3.     Project Description
                This is a general EMP for all construction works either from the water or on the land, Job
                specific environmental considerations and controls will be detailed in the JSEA and detailed
                within the morning toolbox talks as seen necessary.
                EMPs for Future works that require a project specific EMP will include;

                  • Overview of the project
                  • Scope of Construction works
                  • Description of the construction (disturbance) footprint
                  • Timing of the works
                  • Site Plan




M&J Marine Services                                Page 5                     Environmental Management Plan

Page 6

2.          Environmental Management Structure and
            Responsibilities
     2.1.   Director/ manager
              • Ensure this EMP is developed and reviewed with adequate consultation; and
              • Authorising approval and amendments to this EMP.
              • promoting and maintaining good environmental management.
              • Implementing this EMP, including education regarding critical changes to the controls or
                safeguards are communicated to supervisors, employees and relevant contractors;
              • Monitoring compliance with this EMP;
              • Investigating reported non-compliances with this EMP.
     2.2.   On site Supervisor/ Person in charge
               • Inducting all workers and sub contractors and directing all site activities in accordance
                 with this EMP
               • To ensure they and their team members comply with this EMP;
               • To ensure adequate and appropriate instructions regarding this EMP are provided to new
                 staff, other contractors as well as any relevant third parties
               • To report non-compliances with this EMP to Management;
               • To complete any required documentation associated with this EMP.
     2.3.   Employees and Sub Contractors
               • To comply with this EMP;
               • To follow instructions from the supervisor or person in charge regarding this EMP;
               • To report all potential environmental impacts/ hazards to your supervisor as soon as
                 possible



                                             Project Manager
                                             Jay      Maartensz




                                            Site Supervisor
                                      John Matelone / Jay Maartensz



     Employees /                                                                                   Sub Contractors
      workers               Table 2.1 Project Environmental Roles & Responsibilities
                            Matrix




M&J Marine Services                                  Page 6                            Environmental Management Plan

Page 7

                                                                   Pro
                                                                   ject       Site                     Subc
                                                                                          Work
                           TASK                                    Ma        Superv                    ontra
                                                                                           ers
                                                                   nag        isor                     ctors
                                                                    er

Inducting workers and subcontractors and directing
                                                                     2           1           2           2
site activities in accordance with the EMP.
Identifying, assessing and eliminating any non-
compliance or environmentally risky conditions and                   1           1           2           2
documenting the risk controls implemented.
Promoting and maintaining good environmental
management in accordance with the relevant                           1           1           2           2
environmental legislation, regulations and laws.
Implementing practical measures to ensure the site
                                                                     2           1           2           2
complies with the EMP and project specifications
Maintaining, providing updates and supplying this
                                                                     1           2           2           2
EMP to relevant authorities and workers.
Monitoring and assessing subcontractors for the
project to ensure environmental regulations are met                  1           2           2           2
and relate to the works undertaken

Maintaining stocks for environmental control                         1           1           2           1

Provide and maintain a hazardous substances register
for hazardous substances used and stored in the                      1           1           2           2
workplace;
       1 = has responsibility for the overall implementation and / or management of the process/procedure on the
       project
       2 = has responsibility for complying with the process/procedure on the project




M&J Marine Services                                   Page 7                         Environmental Management Plan

Page 8

   2.4. Approval and Licensing Requirements
         Licences, permits and approvals required for this project are summarised in Table 2.2
         below. SMADS will ensure that any licences, permits and approvals are obtained prior to
         work commencing. A copy of all licences, permits and approvals are included in
         Attachment 1 of this EMP.
         Table 2.2 Summary of Licences, permits and approvals

              Regulatory       Licence / Permit /                     Summary of Key Conditions
                                                            Status
              Authority         Approval Type                          and Monitoring Required
                                                                     All works must be undertaken in
                                  Development                        accordance with Best Practice
          Noosa Council                                   Approved   Erosion and Sediment
                                   application
                                                                     Control (BPESC)

                                                                      Hold appropriate DA approvals
          Department of            Resource
                                                                     and comply with all conditions,
          agriculture and          Allocation             Approved
                                                                     reefs to be designed to minimise
             fisheries             Authority
                                                                        impact on existing habitat




   2.5. Environmental Training
         All M&J Marine workers who will be working on site shall receive site-specific induction
         training. The induction training will include:

          •     familiarisation with the requirements of this EMP;

          •     environmental emergency response training; and

          •     familiarisation with site environmental controls.

         M&J Marine may combine the Work Health and Safety (WHS) and Environmental
         induction into one. A record of the site induction will be made on the Site Environmental
         Induction Register (see Attachment 2).



   2.6. Emergency Contacts and Response
         This EMP sets out M&J Marines management of environmental emergencies during the
         project. It includes:

          •     the names of key emergency response personnel and contact details (including all-
                hours telephone numbers);
M&J Marine Services                                  Page 8                Environmental Management Plan

Page 9

          •     contact details for emergency services (e.g. ambulance, fire brigade, spill clean-up
                services);

          •     the location of on-site information on hazardous materials, including SDS (Safety
                Data Sheets) and spill containment material;

          •     steps to follow to minimise damage and control the emergency; and

          •     instructions and contact details for notifying the Site Supervisor, EPA, local council,
                nearby residents or the community if necessary.

         Key Emergency Response Personnel

         Jay Maartensz will be the first point of contact when an incident or spill occurs. He can be
         contacted 24 hours a day. Contact details including emergency services are included in
         Table 2.3.
         Table 2.3 Emergency Response Contact Details

          Project Contact Details
          Emergency Services
          Ambulance, Fire or Police                                                   000
          Poisons Information                                                      13 11 26
          First Aiders
          Jay Maartensz                                                          0457 425 260
          Ian Johnson                                                            0412 517 640
          Utilities
          Water                                                                    132 203
          Electricity                                                               131962
          Gas                                                                    1800 427 532
          Dial Before You Dig                                                        1100
          EPA (24 hour pollution line)                                           1300 130 372
          Project Manager
          Jay Maartensz                                                          0457 425 260


          Officer / Site Supervisor
          John Matelone                                                          0412 521 943


M&J Marine Services                                     Page 9             Environmental Management Plan

Page 10

   2.7. Hazardous Substances
         M&J Marine will maintain an up-to-date register of Hazardous Substances and Safety
         Data Sheets (MSDS) for all materials used on the project (see Attachment 2).

         Controlled, updated copies of these SDS will be readily available to the Project Manager
         and Site Supervisor and prominently displayed at the worksite.

   2.8. Emergency Response Procedures
       2.8.1. Fire Emergency
         Steps to manage a fire emergency:

          •    Call ‘000’ as soon as possible. If ‘000’ does not work on your mobile phone call
               ‘112’;

          •    If safe to do so leave the work area. If unsafe to leave, seek refuge in a safe area
               immediately;

          •    Go to the designated Emergency Assembly Area or to a clear/open area;

          •    Make sure all workers are present and accounted for, do not return to the work area
               to locate any missing workers; and

          •    Notify the Site Supervisor and wait for instructions.

       2.8.2. Gas Leak Emergency
         Steps to manage a gas leakage emergency:

          •    Call the Site Supervisor immediately, if deemed necessary call the Fire Brigade on
               ‘000’. If ‘000’ does not work on your mobile phone call ‘112’;

          •    Site Supervisor to immediately arrange to turn off the gas supply;

          •    Site Supervisor to turn off the site’s electrical supply;

          •    If deemed necessary notify all persons to evacuate the work area and assemble at the
               Emergency Assembly Area;

          •    Control the movement of people to the Emergency Assembly Area;

          •    Check all workers and others are in attendance; and

          •    Remain at the Emergency Assembly Area until notified that the area is safe to
               reoccupy.




M&J Marine Services                             Page 10                    Environmental Management Plan

Page 11

       2.8.3. Leak Or Spill Emergency
         Steps to manage any Leak or Spill in a work site:

          •    Identify the source of the problem;

          •    Stop goods leaking;

          •    Contain spilt material, using spills kit or sand;

          •    Notify officer or Site Supervisor;

          •    Remove spilt material and place in sealed container for disposal (if possible); and

          •    Site Supervisor to record incident.

          OR

          •    as suggested on Safety Data Sheet (SDS)




M&J Marine Services                             Page 11                  Environmental Management Plan

Page 12

3.               Implementation
     3.1.    Risk Assessment
         The risk to the environment of carrying out the project has been considered and documented

          Please see attached documentation
     3.2. Environmental Management Activities and Controls

            The following environmental management activities, mitigation and control measures will
            be adopted to prevent or minimise environmental impacts

         3.2.1.Air quality

                                                                                           Timing /
            Control Measure                                      Responsibility
                                                                                           Frequency
            Potential Impact: Emissions of air pollutants from motor vehicles, vessels & plant
            Regular maintenance of machinery.
                                                                                           Ongoing during
            Workers instructed not to leave machinery            Site Supervisor
                                                                                           project
            idling when not in use.
            Potential Impact: Dust generated from movement of plant and equipment
            Disturbance of site will be monitored and
                                                                                           Ongoing during
            the site will be restored prior to carrying          Site Supervisor
                                                                                           project
            out earthworks in new area.
            Excavated materials will be stocked piled
            and where possible re-used on site. Excess
                                                                                           Ongoing during
            materials to be disposed of in accordance            Site Supervisor
                                                                                           project
            with the Protection of the Environment
            Operations Act 1997.
            Where significant dust is generated, the                                       Ongoing during
                                                                 Site Supervisor
            work area will be watered down.                                                project

         3.2.2. Erosion and Sediment Control

                                                                                           Timing /
            Control Measure                                      Responsibility
                                                                                           Frequency
            Potential Impact: Site erosion and sediment laden water leaving the site
            Sediment and erosion control fencing will be
                                                                                           Ongoing during
            installed as required and left in place until all    Site Supervisor
                                                                                           project
            works are complete.




M&J Marine Services                                    Page 12                     Environmental Management Plan

Page 13

          Silt Booms will be deployed at build sites as
          needed to control excessive plumes and
                                                                                      Ongoing during
          turbidity caused by the reed construction.        Site Supervisor
                                                                                      project
          They will also be used on the load site as
          needed
          Erosion control measures will be monitored and                              Ongoing during
                                                            Site Supervisor
          maintained throughout the project.                                          project
          After heavy rain, all sediment and erosion                                  Ongoing during
                                                            Site Supervisor
          controls will be checked and made good.                                     project

       3.2.3. Water Quality

                                                                                      Timing /
          Control Measure                                   Responsibility
                                                                                      Frequency
          Potential Impact: Contamination of water due to chemicals, fuels or wastes
          Storage of fuels, chemicals and wastes will                                 Ongoing during
                                                            Site Supervisor
          be clear of stormwater or drainage lines.                                   project
          Safety Data Sheet (SDS) of hazardous
                                                                                      Ongoing during
          substance will be referred to when spills         Site Supervisor
                                                                                      project
          occur.
          Work site will hold a spill kit to contain site                             Ongoing during
                                                          Site Supervisor
          spills.                                                                     project
          All hazardous substances on site will be
                                                                                      Ongoing during
          recorded in the Hazardous Substances and          Site Supervisor
                                                                                      project
          Safety Data Sheet Registers.




M&J Marine Services                               Page 13                     Environmental Management Plan

Page 14

       3.2.4. Flora and Fauna

                                                                                   Timing /
          Control Measure                                Responsibility
                                                                                   Frequency
          Potential Impact: Damage to trees and root systems
          At the commencement of works sea grass
          will be marked out with star pickets or
                                                                                   Ongoing during
          alternatively a “Chanel” will be marked        Site Supervisor
                                                                                   project
          where it is suitable to transit with minimal
          disturbance to the sea grass
          Excavation near trees to be kept will be
                                                                                   Ongoing during
          avoided and stockpiles kept clear of any       Site Supervisor
                                                                                   project
          tree.
          Potential Impact: Disturbance to endangered species
          Where an endangered species is identified,
                                                                                   Ongoing during
          works will stop immediately and the            Site Supervisor
                                                                                   project
          relevant authority notified.
          Protective fencing will be installed around
                                                                                   Ongoing during
          trees and areas where endangered species       Site Supervisor
                                                                                   project
          are found.
          Any fauna species encountered on site will
                                                                                   Ongoing during
          be relocated by a qualified wildlife carer     Site Supervisor
                                                                                   project
          from an organisation such as WIRES.
          Potential Impact: Spread of weeds
          Weeds will be removed from the site and                                  Ongoing during
                                                      Site Supervisor
          composted or disposed of to prevent spread.                              project




M&J Marine Services                            Page 14                     Environmental Management Plan

Page 15

       3.2.5. Community Relations

                                                                                    Timing /
          Control Measure                                 Responsibility
                                                                                    Frequency
          Potential Impact: Public amenity
          Community consultation and information
                                                                                    Ongoing during
          events are being co ordinated by the            Project Manager
                                                                                    project
          principle.

       3.2.6. Traffic

                                                                                    Timing /
          Control Measure                                 Responsibility
                                                                                    Frequency
          Potential Impact: Parking and access to site
          Nominated parking areas will be allocated                                 Ongoing during
                                                          Project Manager
          on site.                                                                  project
          Residents and property owners will be
                                                                                    Ongoing during
          notified about the possibility of an increase   Project Manager
                                                                                    project
          in traffic.

       3.2.7. Waste Management

                                                                                    Timing /
          Control Measure                                 Responsibility
                                                                                    Frequency
          Potential Impact: Unacceptable disposal of site waste
          All material waste will be recorded in the                                Ongoing during
                                                          Site Supervisor
          Waste Register.                                                           project
          All waste removed from site will be
          disposed of in accordance with the                                        Ongoing during
                                                          Site Supervisor
          Protection of the Environment Operations                                  project
          Act 1997 (POEO ACT 1997).
          Appropriate space will be provided for the
          temporary storage of garbage, recyclable                                  Ongoing during
                                                     Site Supervisor
          and compostable waste to ensure separation                                project
          of waste products.
          During works, on-going checks will be
          carried out to ensure correct separation and                              Ongoing during
                                                          Site Supervisor
          re-use of recyclable materials is being                                   project
          maintained.


M&J Marine Services                            Page 15                      Environmental Management Plan

Page 16

          Where possible all existing building and                                 Ongoing during
                                                        Site Supervisor
          excavation materials will be re-used on site.                            project




       3.2.8. Noise

                                                                                   Timing /
          Control Measure                                Responsibility
                                                                                   Frequency
          Potential Impact: Unacceptable noise levels and vibrations
          Work equipment will be maintained in good
          working order to comply with EPA                                         Ongoing during
                                                    Site Supervisor
          guidelines. Where required, noise                                        project
          suppressors will be installed.
          Hearing protection will be worn eg                                       Ongoing during
                                                         All workers
          earplugs or earmuffs.                                                    project
          Work will take place during nominated                                    Ongoing during
                                                         Site Supervisor
          work hours only.                                                         project

       3.2.9. Heritage

                                                                                   Timing /
          Control Measure                                Responsibility
                                                                                   Frequency
          Potential Impact: Damage to heritage items
          All heritage items will be identified and                                Ongoing during
                                                         Site Supervisor
          fenced off prior to commencing works.                                    project
          All workers and visitors will be notified of                             Ongoing during
                                                         Site Supervisor
          any heritage items on site.                                              project
          No items will be stored or work undertaken                               Ongoing during
                                                     Site Supervisor
          within the boundary of a heritage item.                                  project
          If heritage items are found during the
          course of works, work will stop                                          Ongoing during
                                                         Project Manager
          immediately and the relevant authorities                                 project
          notified.




M&J Marine Services                            Page 16                     Environmental Management Plan

Page 17

       3.2.10. Hazardous Materials

                                                                                     Timing /
          Control Measure                                  Responsibility
                                                                                     Frequency
          Potential Impact: Spills and uses of hazardous materials
          All hazardous and/or intractable wastes are
                                                                                     Ongoing during
          to be disposed of in accordance with             Site Supervisor
                                                                                     project
          relevant Authority and EPA requirements.
          All hazardous waste removed from site will
          be disposed of in accordance with the                                      Ongoing during
                                                     Site Supervisor
          Protection of the Environment Operations                                   project
          Act 1997 (POEO ACT 1997).
          Safety Data Sheet (SDS) of hazardous                                       Ongoing during
                                                           Site Supervisor
          substance will be referred to if spills occur.                             project
          All hazardous substances will be recorded
          in the Hazardous Substances Register and                                   Ongoing during
                                                     Site Supervisor
          the SDS recorded in the Safety Data Sheets                                 project
          (SDS) Register.

       3.2.11. Soil Contamination

                                                                                     Timing /
          Control Measure                                  Responsibility
                                                                                     Frequency
          Potential Impact: Spillage and leaking of hazardous material into the soil
          Regular maintenance will be undertaken on
          all machinery and transport vehicles to                                    Ongoing during
                                                    Site Supervisor
          ensure there are no fuel or oil spills or                                  project
          leaks.
          Only trained workers will handle hazardous                                 Ongoing during
                                                     Site Supervisor
          materials.                                                                 project
          All materials will be labelled and stored in                               Ongoing during
                                                           Site Supervisor
          a lock-up with an impervious floor.                                        project
          Safety Data Sheets (SDS) for all hazardous                                 Ongoing during
                                                           Site Supervisor
          materials will be kept on site.                                            project
          All site workers will be trained in spill                                  Ongoing during
                                                           Site Supervisor
          management.                                                                project




M&J Marine Services                             Page 17                      Environmental Management Plan

Page 18

     3.3.      Environmental Control Plan
            The key features of the environmental management for this project is to keep good control
            on the following;

     •   waterways and drains
     •   erosion and sediment controls
     •   work areas, machinery or vehicle parking, waste management areas, fuel and chemical
         stores
     •   vegetation requiring protection
     •   traffic management
     •   monitoring locations
     •   environmentally sensitive areas on and adjacent to the site

     3.4. Environmental Schedules
            This EMP refers to a number of environmental schedules comprising forms, registers and
            checklists. They are listed below and included in Attachment 2.

                  1. Site Environmental Induction Register
                  2. Site Environmental Inspection Checklist

                  3. Environmental Complaint Form
                  4. Non-Conformance Report Form
                  5. Hazardous Substances Register
                  6. Safety Data Sheets (SDS) Register
                  7. Waste Register



4.          Monitor and Review
     4.1. Environmental Monitoring
         M&J Marine will monitor the environmental controls listed in Section 3.2 through regular
         site environmental inspections.

         Site environmental inspections will be undertaken halfway through the job and will be
         recorded by the Site Supervisor on the Site Inspection Checklist (see Attachment 2).

     4.2. Environmental Auditing
            Planned and documented audits aimed at evaluating the environmental conformance of the
            project will be carried out by SMADS. Any deficiencies identified during the audits shall
            be documented and actioned in accordance with SMADS corrective action process (see
            Section 4.5).

M&J Marine Services                             Page 18                   Environmental Management Plan

Page 19

         The audits to be carried out and their frequency are listed in Table 4.1.

         Table 4.1 Project Audit Plan

                      Audit Type              Frequency              Record             Auditor
                                                                                     Project
                                           Half way through
           Environmental                                                             Manager /
                                           the project           Audit Report
           Management Plan                                                           External
                                           duration
                                                                                     Auditor
                                                                                     Project
           Sub-contractor                  Half way through
                                                                                     Manager /
           Environmental                   the project           Audit Report
                                                                                     External
           Performance Audit               duration
                                                                                     Auditor
                                                                 Site
                                                                 Environmental
           Site Inspection                 weekly / monthly                          Site Supervisor
                                                                 Inspection
                                                                 Checklist


   4.3. Communication
         To minimise impacts on the public by the project, residents and adjacent property owners
         will be notified before the works commence and at appropriate stages during the project.
         They will be informed of details of the intended work, the duration of the activities,
         information regarding any access interruptions and details of whom to contact with
         questions regarding the work. The Project Manager will seek permission if there is any
         need to access private property.

         Project Signage will be erected at the site.

         M&J Marine will undertake external and on-site communication in case of environmental
         incidents and emergencies, including communication with subcontractors. External
         communication will include informing nearby residents of proposed work, incidents and
         emergencies and contacting regulatory agencies if required.




M&J Marine Services                            Page 19                    Environmental Management Plan

Page 20

   4.4. Complaints
         Community groups, clients, interested parties, etc may advise of practices, activities and
         processes that are related to the environment by a variety of methods. These may include a
         non-conformance report, fax/letter, telephone complaint, newspaper/magazine report and
         verbal protest.

         On receipt of a complaint, the person receiving the complaint will notify the Project
         Manager and the complaint will be recorded using the Environmental Complaint Form
         (see Attachment 2). The Project Manager will follow up the complaint and take
         corrective action as required.

   4.5. Corrective Action
         A non-conformance occurs when a procedure or environmental control is not followed or
         does not perform as required by this EMP. M&J Marine will monitor non-conformances to
         the EMP and initiate corrective and preventive action where required. All non-
         conformances will be recorded on the Non-Conformance Report Form (see Attachment
         2). M&J Marine will undertake corrective action in case of incidents that have an
         environmental impact or works not carried out according to the required standard.
         Procedures for identifying corrective action include:

          •    an EMP review;

          •    investigation into the causes of incidents and recording of the results; and

          •    evaluating further environmental risks.




M&J Marine Services                            Page 20                    Environmental Management Plan

Page 21

   4.6. Environmental Management Plan Review
         This EMP will be reviewed by the Project Manager as required to ensure its continuing
         suitability and to ensure it is conforming to the EMP’s environmental objectives and legal
         requirements. Reviews will be undertaken as necessary as a result of any of the following:

        •      when there is a change in the scope of the project that requires a change in
               environmental controls;

        •      when there is a need to improve performance in an area of environmental impact;

        •      at the completion of environmental audits as required;

        •      as a result of changes in environmental legislation applicable and relevant to the
               project; and

        •      as required by Jay Maartensz.

         Reasons for making changes to the EMP will be documented. A copy of the original EMP document
         will be kept for the project records.

         The Project Manager is authorised to change and re-issue the EMP. The Site Supervisor is to be
         informed of any changes made by the Project Manager.

         The Site Supervisor is responsible for ensuring the work crew are complying with the current EMP,
         and for informing the work crew of any changes. The Site Supervisor is responsible for ensuring the
         workers are aware of changes before starting any works.




M&J Marine Services                              Page 21                      Environmental Management Plan

Page 22

Attachment 1: Environmental Licences, permits and
approvals




M&J Marine Services    Page 22      Environmental Management Plan

Page 23

                      Attachment 2: Environmental Schedules
   1. Site Environmental Induction Register

   2. Site Environmental Inspection Checklist

   3. Environmental Complaint Form

   4. Non-Conformance Report Form

   5. Hazardous Substances Register

   6. Safety Data Sheets (SDS) Register

   7. Waste Register




M&J Marine Services                           Page 23   Environmental Management Plan

Page 24

  SITE ENVIRONMENTAL INDUCTION REGISTER
                      Record of persons receiving environmental induction for this site

 Project Name:                                             Date:
 Address:
 Name of
 Inductor:                                                 Telephone:
 Topics Covered:




I have attended this induction and have read and understood the environmental rules of this
site and EMP.

                                            Induction
                                             Number                 Worker
  Date           Worker Name                                                         Supervisor
                                       (e.g. general induction     Signature
                                            card, license)




M&J Marine Services                           Page 24                    Environmental Management Plan

Page 25

          SITE ENVIRONMENTAL INSPECTION CHECKLIST
PROJECT DETAILS
Project
Name:
Contact
Name:                                                        Telephone:

Email                                                        Date:

ENVIRONMENTAL ISSUES
                                                        N/
Erosion and Sediment Control                   Yes No        Comments
                                                        A
Has an erosion and sediment control plan
been created.
Are sediment and control measures in
place for construction works e.g. sediment
traps, sediment fences etc.
Are these being maintained and kept in
correct working order.
Have materials been contained or placed
in designated areas to be away from
stormwater drains/runoff.
Are designated washout areas in place
away from storm water drains.
Is relevant protection in place surrounding
flora to stop any damage.
Is the site maintained and cleared away
daily of all soil, earth, mud, clay and
concrete waste that may cause an
environmental issue.
                                                        N/
Waste Management                               Yes No        Comments
                                                        A
Has a Waste Management Plan been
created and implemented.
Have stock piles or designated waste areas
been created.
Is the waste being stored in such an area as
not to pollute or contaminate stormwater
drains.
Have excess materials been recycled,
reused or returned.



M&J Marine Services                              Page 25                  Environmental Management Plan

Page 26

                                                      N/
Hazardous Materials                          Yes No        Comments
                                                      A

Are spill kits available and held on site.
Are spills attended to and cleaned up
immediately.
Are procedures in place noting the correct
methods for removing Asbestos.
Is there a designated storage area for
hazardous materials where leaks can’t
flow to open ground or drains.
Are all hazardous material containers
sealed properly and no leaks evident.
Are Safety Data Sheet (SDS) on site for
all hazardous materials
                                                      N/
Air Quality                                  Yes No        Comments
                                                      A
Does all plant and equipment comply with
the relevant codes and emission standards
for air quality
                                                      N/
Noise Management                             Yes No        Comments
                                                      A
Are procedures in place to minimise noise
to workers, site and surrounding areas.
Does all plant and equipment comply with
the relevant codes, guidelines and
standards for noise control

 Company Representative Name:__________________________________________________

Company Representative Signature:_________________________________________________

         Date: ___________________________




M&J Marine Services                            Page 26                Environmental Management Plan

Page 27

            ENVIRONMENTAL COMPLAINT FORM
 Project
 Name:                            EC Number:
 Address:                         Date:
 EC issued to:                    EC issued by:




M&J Marine Services     Page 27                   Environmental Management Plan

Page 28

 ENVIRONMENTAL COMPLAINT DETAILS

 Environmental Incident
 □   Pollution                               □    Potential pollution
 □    Other:


 DETAILS OF COMPLAINT
 Name:                                               Address:
 Position:                                           Contact No
 NATURE OF COMPLAINT
 □ Dust                                    □ Vibration
 □ Noise                                   □ Soil contamination
 □ Water                                   □ Plant/machinery
 □ Pollution                               □ Waste
 □ Flora/fauna                             □ Erosion and sediment controls
 □ Heritage                                □ Other:


 INCIDENT DETAILS
 Location of
                                                          Time:
 incident:
                                                          Date:
 Description:


 Conditions of site when complaint occurred:


 Corrective or preventive action to be taken to                                    Date to be
                                                     Responsible person
 fix the complaint                                                                completed by




 SIGN OFF
 Corrective or preventive action is complete and dealt with by the responsible person noted
 above
 Name:                                            Date:

M&J Marine Services                        Page 28                      Environmental Management Plan

Page 29

 Signature:
 ………………….agrees corrective or preventative is complete
 Name:                                    Date:
 Signature:




M&J Marine Services                  Page 29             Environmental Management Plan

Page 30

            NON-CONFORMANCE REPORT FORM
 Project Name:                                       NCR Number:
 Address                                             Date:
 NCR issued to:                                      NCR issued by:

 NON CONFORMANCE DETAILS

 Area of Non Conformance

 □ Site Establishment                         □   Work Health and Safety

 □ Works outlined in contract                 □   Environmental Management

 □ Supplier                                   □   Quality Management

 □ Customer complaint                         □   Other:


 Description of Non Conformance




 Outline the evidence obtained for Non Conformance




 Corrective or preventive action to be taken to                                  Date to be
                                                     Responsible person
 fix the Non Conformance                                                        completed by




 Sign Off


M&J Marine Services                        Page 30                    Environmental Management Plan

Page 31

 Corrective or preventive action is complete and dealt with by the responsible person noted
 above
 Name:                                          Date:
 Signature:
 …………………… agrees corrective or preventative is complete
 Name:                                          Date:
 Signature:




M&J Marine Services                        Page 31                 Environmental Management Plan

Page 32

               HAZARDOUS SUBSTANCES REGISTER
                                                                   Clearly
                                                                                     SDS on Site
     Product              Location where             Quantit       Labeled
                                                                                                             Action / Comments
      Name                Product is Used              y                            Yes /
                                                                    Yes / No                   Date
                                                                                     No




 An SDS is a Safety Data Sheet – these are available from the substance manufacturer or the point of purchase. SDS must be on site
                                              together with the hazardous substance.

Action / Comments - note any particular safety controls required e.g. use, transport, PPE, first aid, storage, spill control and whether
each substance is classified as hazardous (according to NOHSC) or dangerous goods for transportation (according to ADG code).




M&J Marine Services                                            Page 32                            Environmental Management Plan

Page 33

                SAFETY DATA SHEET (SDS) REGISTER
 Prepared By:


 SAFETY DATA SHEET REGISTER

  SDS Number Date of Issue                       Worker                 Description         Date Reviewed*         Signed




                                            *Check SDS is current before starting each project.

SDS must not be more than five years old from date of issued date.
Refer to: Safe Work Australia Code of Practice - Preparation of Safety Data Sheets for Hazardous Chemicals




M&J Marine Services                                                  Page 33                      Environmental Management Plan

Page 34

                               WASTE REGISTER
  Project Name:
  Address:
              TO
  Waste
              TAL        On-site Re-
  Materi
              amo           use             Off-site Re-use
  al Type         Dat
              unt       (Specify amount      (Specify contractor            Off-site Disposal
   e.g. soil,      e                            and recycler)
    rock,
                3(m     re-use onsite and
  vegetation   and/or     intended use)
     etc.      tonnes
                  )

                                                                   amoun
                        amount use/         amount                                  pick up
                                                    name of           t    name of
                         (m3/   locati       (m3/                                    time/ destination
                                                    recycler        (m3/ contractor
                        tonnes)   on        tonnes)                                   date
                                                                   tonnes)




M&J Marine Services                              Page 34                     Environmental Management Plan

Page 35

Attachment 3: Environmental Risk Assessment
The Environmental Risk Rating of an identified impact is measured in terms of consequence
(severity) and likelihood (probability) of the event happening.


Risk Assessment table
       Consequence or Impact of Hazard               Risk Level   A   P   U        Likelihood/             Risk Rating
                                                                                   Probability
H - Significant detrimental environmental impact,     H = High    1   1   2   A = Almost certain        1 = Immediate
potential death, permanent or long term disability                            could happen at any       action is required
or illness,                                                                   time
M - Short term environmental impact, potential         M=         1   2   3   P = Possible risk could   2 =Control the
temporary disability or illness requiring medical     Medium                  happen occasionally       risks/ hazards
attention                                                                                               a.s.a.p.
L - Minimal environmental impact, potential minor     L = Low     2   3   3   U = Unlikely may          3 =Control risks
injury requiring first aid                                                    happen rarely             with routine
                                                                                                        procedures


Risk Control
Eliminate – ‘Design out’ the hazard when new materials,
equipment and work systems are being purchased for the site;
Substitute - Substitute less hazardous materials, equipment or
substances;
Isolate – separate the environment/workers from hazards using
barriers, enclosing noisy equipment;
Engineering – use engineering controls to reduce the risks.
Make sure that appropriate environmental controls are
available and used correctly;
Administrative – Minimise the risk by adopting safe and
environmentally appropriate working practices or providing
appropriate training, instruction or information;
Personal Protective Equipment – Make sure that appropriate
PPE is available and used correctly.




M&J Marine Services                                       Page 35                      Environmental Management Plan

Page 36

M&J|/ MARINE

Services

M&J Marine Services Page 36 Environmental Management Plan

Page 37

 Marine Plant and water quality monitoring pla




      Project Name:      Noosa Oyster Ecosystem Restoration Projec

      Project Location: Various Locations within the lower Noosa River
      Client:           The Nature Conservancy Australia “TNC”
      Contract No :      K21-22-35b




ABN: 766 242 991 45                 Page 1                  [email protected]
                                                       t

                                                                     n

Page 38

      1. Introduction                                                3
         1.1.General                                                 3
        1.2.Project Background                                       3
         2. Objective                                                3
              3. References                                          3
        4. Construction Methodology                                  4
         5.     Existing Environment                                 5
       6.     Monitoring Process                                     5
               6.1. Protective measures                              5
       7.     Record keeping and reporting                           5




ABN: 766 242 991 45                       Page 2   [email protected]

Page 39

      1. Introduction
         1.1. General
         This document describes the intended marine plant and water quality monitoring plan for
         the Noosa Oyster Ecosystem Restoration project as further described in the Contract
         between The Nature conservancy and M&J Marine Services PTY LTD

        1.2. Project Background
         The estuarine environment of the Noosa River was once dominated with extensive rock
         oyster ecosystems. Oyster ecosystems were largely lost however, in the late 1800s to early
         1900s. At the peak of the wild oyster harvest industry (1906-1907), it is estimated that 2-3
         million oysters were harvested in the lower estuary each year. The commercial oyster
         industry in the Noosa River ceased to be economically viable by the 1940s.

         This project responds to the loss of natural hard substrates in the Noosa River by re-
         introducing locally sourced rock in configurations that rock oysters and associated species
         (e.g. pearl oysters, leaf oysters, hairy mussels, tunicates and macroalgae) readily colonise.
         The design and placement of the rock substrate considers historic location of oyster beds
         plus physical features, such as aspect, height, dimensions and rugosity in a way that can
         help mitigate physical and biological threats to the recovering ecosystem such as
         smothering, heat, erosion, predation and human disturbance.

         2. Objective
         The objective of this Marine plant and water quality plan is to ensure minimal impact to
         the river system and its existing marine life during the construction by monitoring our
         impacts and controlling them with the use of floating silt booms if required.
         We will do this by;

                • Identifying whether the impacts on water quality on the active build site and
                  general water based works are local and temporary
                • Identifying when a plume has the potential to cause adverse social and/or
                  environmental impacts and to provide the opportunity to limit these impacts with
                  particular attention to the adjacent sea grass and mangrove areas.

            3. References
               This document should be read in conjunction with the Project’s Construction Environmental
               Management Plan (CEMP), which is the over-arching plan that details the procedures and
               policies to be following in executing these works.




ABN: 766 242 991 45                             Page 3                     [email protected]

Page 40

        4.     Construction Methodology
               The Reef patches are to be comprised of locally sourced igneous porphyry rock (the
               substrate) with a size range of 100mm to 600mm.
               The substrate will be loaded onto the barge using a Posi - track loader and excavator, the
               barge then travels to the build site which will have individual patches marked out using a
               combination of marker buoys and star pickets, located using GPS.

               Once on site the barge uses steel spuds rather than anchors to ensure precise placement of
               the barge and to eliminate both swing and potential environmental damage from anchor
               chains.
               The barge is then unloaded using an excavator with a customised thumb and blade
               attachment which allows us to pick up the rock and place it into the water precisely and
               carefully, minimising plumes.




ABN: 766 242 991 45                               Page 4                      [email protected]

Page 41

              5.     Existing Environment
            The areas of the Noosa River that the restoration sites are located naturally have a high mount of
            turbidity and after storm events the turbidity would be higher. The department of environment and
            resource management QLD has recorded the average turbidity of the lower Noosa river between 1
            and 4 NTU and the upper estuary averaging up to 20 NTU. The High turbidity that comes with
            storms and flood events are considered natural phenomena and species within the local marine
            environment are able to tolerate these conditions for short periods. We don’t expect the Plumes
            created from reef construction to impact the environment as much as one of these natural events.

            6.     Monitoring Process
     Monitoring                          Frequency                              Responsibility

     Visual inspeciton                    Before commencement of works,         M&J Marine
                                          daily whilst marking out individual
                                          patches
     Aerial Photography                   Before commencement of works          M&J Marine
                                          After rst load in each area
                                          Weekly if impacts appear to be
                                          low
     Site Photographs                     Before and after each site is         M&J Marine
                                          complete - on low tide.


                    6.1. Protective measures
                    Our first step in protecting the local environment is to identify and and clearly mark all
                    sensitive habitats. Once marked we will ensure that the vessels propellors as much as
                    practical do not transit over these areas, when this is not practical we will ensure that engines
                    are trimmed up as much as possible and also, as much as possible, drift over these areas in
                    neutral if there is not practical alternate route.

                    Once on site and building if large plumes are detected and seen to be travelling towards or
                    over sensitive areas such as sea grass then a floating silt boom will be deployed to prevent
                    the plumes from impacting the environment.

                    If the plumes are minor and are not impacting the sensitive areas the silt booms will not be
                    used as dragging of the weights and curtains can potentially be more harmful to the
                    immediate environment than the sediment plumes that they are catching.

                    In addition to plume monitoring and control we are also using a very clean rock supply with
                    minimal sediment within the load and we are placing conveyor belt rubber under the stock
                    piles to minimise / eliminate picking up sediment from the natural ground under the stock
                    piles, this method has been proven to reduce the amount of unintended material being picked
                    up by 90 - 100%.

            7.     Record keeping and reporting
            M&J Marine will keep all photos, both aerial and onsite, for a minimum of 12 moths from project
            completion. They will be given to the principal (TNC) at the end of the job or as required on request.
            In the event that the use of a silt boom on the build sites is triggered the principal will be notified
            immediately and the success of this management strategy will be reported on daily.
            In the unlikely event it is found to be ineffective other methods will be considered including the use
            of a second curtain however based on experience we don’t expect this to be the outcome.




     ABN: 766 242 991 45                                Page 5                       [email protected]
fi

Page 42

     Erosion and Sediment Management Plan




                      Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying                        16/06/2021
                      upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
                      whatsoever for any errors, faults, defects or omissions in the information.
                                                                                                                                                                    1:400




           Noosa Oyster Ecosystem Restora on Project:
Supply of services to construct rock oyster reef founda ons at select sites
                        in the Noosa River estuary




ABN: 766 242 991 45                                                      Page 1                                                     [email protected]
                                                                   ti
                                                                                                             ti

Page 43

General:
1. ESCP Refers to Erosion and Sediment Control Plan.

2. ESC Refers to Erosion and Sediment control

3.Sediment includes but is not limited to clay, silt, sand ,gravel, soil, mud, cement and ceramic waste

4.Any reference to IECA White books (2008) refers to IECA 2008 Best Practice Erosion and Sediment
 control. Books 1-6 International Erosion Control (Australasia) Picton NSW

The ESCP:
5. The ESCP and its associated ESC measures shall be constantly monitored , reviewed and modified as
   required to correct deficiencies. Council has the right to direct changed if, in its opinion the measures that
   are proposed or have been installed are inadequate to prevent pollution.

6. Prior to any activities onsite the responsible person(s) is to be nominated. The responsible person shall
   be responsible for ESC measures onsite. The Name ,address and 24 hour contact can be found within
   the M&J marine Environmental Management plan which will be submitted to council. Council Shall be
   advised within 48 hours of any changes to the responsible person(s), or their contact details, in writing

7. The approved ESCP shall be available on site for inspection by Council officers while work activities are
   occurring

8. The implementation of the ESCP shall be supervised by personnel with appropriate qualifications and /
   or experience in ESC on construction sites.

9. All ESC measures shall be appropriate for the sedate type of the soils onsite, in accordance with the
   IECA white books or other current recognised industry standard for ESC for Australian conditions.

10. All works shall be carried out in accordance with the approved ESCP (as amended from time to time)
   unless circumstances arise where;

          A. Compliance with the ESCP would increase the potential for environmental harm; or

          B. Circumstances change during construction and those circumstances could not have been
             foreseen; or

          C. Council determines that unacceptable off-site sedimentation is occurring as a result of a land
             disturbing activity. In either case the person(s) responsible may be required to take additional,
             or alternative protective action and/or undertake reasonable restoration works within the
             timeframe specified by council.

11. M&J Marine shall ensure adequate supply of ESC, and appropriate pollution clean up materials are on
   site at all times.

Site Access
12. The Site will be accessed by Hilton Esplanade, the sealed road will be monitored and swept clean daily
   or as required if trucks are transferring sediment onto the road.




ABN: 766 242 991 45                                  Page 2                      [email protected]

Page 44

Site Monitoring
13. The ESC will be monitored daily by the designated person(s)

14. The designated person must ensure that if a > 50% probability of rain event of >20mm (surface water) is
    expected through a Bureau of Meteorology forecast over a 24 hour period, or if a short term pulse event
    such as a thunderstorm occurs environmental controls are inspected and adapted to withstand the event
    and remain effective.

15. The designated person must ensure that any disturbed areas are stabilised and rehabilitated as soon as
    construction work is completed. Land based sediment and erosion controls must stay in place and be
    maintained until the site is completely stabilised


Proposed Erosion and sediment controls to be in place on load site




Symbol                                            Technique

                                                  Floating Silt Boom


                                                  Sediment Fence Barrier




ABN: 766 242 991 45                               Page 3                      [email protected]

Page 45

            Biosecurity risk management

                M&J Marine Services Pty Ltd




     Noosa Oyster Ecosystem Restora on Project:
Supply of services to construct rock oyster reef founda ons at select
                   sites in the Noosa River estuary



                                    2022
                               ti
                                            ti

Page 46

Content

  
 
 
   
 
  
  
 
 

1.PROJECT OVERVIEW
2.PURPOSE
3.SCOPE
4.MANAGEMENT RESPONSIBILITIES .
5.BIOSECURITY HAZARDS............ weed
6.SITE/PREMISE DETAILS.......... weed
7.OPERATIONAL PROCEDURES
8. MONITORING
9.REPORTING
1O.CONTACTS .......sccssssseceesssccecesseneeeeesseeeeesesseeeesessseeessessseeeesesseeeeessaeeeeeeesneeeeesenseeereesaeeeeseenaees 6

 

Version: July 2022 Page 2

Page 47

                     1.Project overview

                     M&J Marine Pty Ltd is providing services to The Nature Conservancy (TNC) to construct rock
                     founda ons of oyster reefs in the Noosa River Estuary. The work is being undertaken against
                     engineered speci ca ons and state and local regulatory approvals.

                     The work includes the deployment of 3250 tonnes of igneous rock sources from quarries within
                     the Sunshine Coast region of Queensland.

                     M&J Marine will transport necessary barges, boats and heavy machinery, by land only, from
                     New South Wales to Noosa, Queensland to delivery this service.

                     The works will be undertaken in July and August 2022.

                     This document should be read in construc on with the Project Management Plan (V12) for this
                     work and M&J Marine Services Pty Ltd Construc on and Environmental Management Plan
                     (CEMP).


                     2.Purpose

                     Protec ng Australia’s biosecurity is a responsibility shared by government, industry and the
                     community. Biosecurity risk management prac ces implemented by industry can assist in
                     maintaining Australia’s pest and disease biosecurity status and signi cantly reduce
                     contamina on that leads to schedule slippage and increased project costs.

                     M&J Marine Services Pty Ltd is commi ed to maintaining Australia’s strict biosecurity status and
                     takes all necessary precau ons when moving vessels between Australian estuaries.


                     3.Scope

                     The scope of this document involves the proponent complying with Australia’s biosecurity
                     requirements by developing and implemen ng processes and procedures to mi gate
                     biosecurity risks during its opera ons.

                     Key ac vi es include:

                     Transport of vessels and equipment, by truck, from New South Wales to Noosa, Queensland

                     Cleaning and disinfec ng all equipment prior to deployment in the Noosa River.

                     Ensuring rock supply used in the construc on of oyster reefs is less than 50 percent
                     contaminated with soil/sediment and is free of foreign materials such as plas cs.

                     Maintenance of a load out site at Noosaville, on the shore of the Noosa River, which will be
                     maintained to a high standard of opera on, from which pollutants will not enter the estuary
                     and create a biofouling issue.
                     Version: July 2022                                                                         Page 3
ti
 ti
      ti
           ti
                ti
                            fi
                                 ti
                                      ti
                                           ti
                                                ti
                                                     tt
                                                          ti
                                                               ti
                                                                    ti
                                                                         ti
                                                                              ti
                                                                                   ti
                                                                                        fi
                                                                                             ti
                                                                                                  ti

Page 48

                4.Management responsibili es

                M&J Marine Services Pty Ltd takes responsibility for delivering biosecurity awareness
                informa on and material for project personnel (e.g. induc on training, toolbox and pre-start
                mee ngs)

                Ensuring all vessels (barges) are cleaned and inspected before deployment

                Repor ng possible biosecurity threats from related works to the Contractor (The Nature
                Conservancy) and authori es.


                5.Biosecurity hazards

                Poten al biosecurity hazards from this project include the transloca on of marine plants and
                biofouling organisms on barges used for the transport and deployment of rock.

                6.Site/premise details

                Work site loca ons




                Version: July 2022                                                                        Page 4
ti
     ti
      ti
           ti
                   ti
                                     ti
                                          ti
                                                             ti
                                                                       ti

Page 49

          The construc on load-out site is located on Hilton Esplanade, Noosaville.




          7.Opera onal procedures

          In this sec on detail the procedures that will provide assurance that the biosecurity integrity of
          cargo is maintained.

          Equipment Handling and Cleaning /treatment

          Two barges will be relocated from New South Wales to Noosa, Queensland

          The barges will be loaded onto trucks and transported to Noosa by road.

          During loading, each barge will be pressure washed and sprayed with Virkon. Virkon is a premier
          broad spectrum virucidal veterinary disinfectant that is recognised by industry and governments
          worldwide as a disinfectant of choice for livestock disease preven on and control.

          Each barge will then be transported to Noosa and air dried for 72 hours.

          Virkon will then be reapplied to the barges on arrival in Noosa as an addi onal precau on.




          Version: July 2022                                                                           Page 5
ti
     ti
           ti
                                                                 ti
                                                                        ti
                                                                                      ti

Page 50

           8.Monitoring

           During opera ons, biosecurity o cers will be invited to inspect the barges.

           The construc on team will also inspect the barges on a daily basis.


           9.Repor ng

           Possible marine pest incursions will be reported on as they occur to the Contractor and
           authori es.

           Incursion responses will be coordinated with the Contractor and authori es.

           Incursions and responses will be reported on in the weekly construc on report and/or nal
           construc on report.


           10.Contacts

           Service provider contact:

           Jay Maartensz: Director
           M&J Marine Services PTY. LTD
           8 Eleonora Close, Whitebridge, NSW 2290
           M 0457 425 260
           E [email protected]
           ABN 766 242 99 145

           Contractor contact:
           Craig Bohm
           Queensland Manager, Oceans
           The Nature Conservancy
           Email: [email protected]
           Mobile: +61 410 872 435

           DAF Biosecurity contact:
           Dr Stephen Wesche
           Principal Scien st
           Department of Fisheries
           Phone: 0475 945 704
           Email: [email protected]




           Version: July 2022                                                                        Page 6
ti
 ti
      ti
            ti
             ti
                  ti
                                ffi
                                                                   ti
                                                                        ti
                                                                                         fi

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.