Skip to the record
The only place to find full transcripts.

Original source · versioned page text

220711 Noosa Oyster Project - CEMP

Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

   4.4. Complaints
         Community groups, clients, interested parties, etc may advise of practices, activities and
         processes that are related to the environment by a variety of methods. These may include a
         non-conformance report, fax/letter, telephone complaint, newspaper/magazine report and
         verbal protest.

         On receipt of a complaint, the person receiving the complaint will notify the Project
         Manager and the complaint will be recorded using the Environmental Complaint Form
         (see Attachment 2). The Project Manager will follow up the complaint and take
         corrective action as required.

   4.5. Corrective Action
         A non-conformance occurs when a procedure or environmental control is not followed or
         does not perform as required by this EMP. M&J Marine will monitor non-conformances to
         the EMP and initiate corrective and preventive action where required. All non-
         conformances will be recorded on the Non-Conformance Report Form (see Attachment
         2). M&J Marine will undertake corrective action in case of incidents that have an
         environmental impact or works not carried out according to the required standard.
         Procedures for identifying corrective action include:

          •    an EMP review;

          •    investigation into the causes of incidents and recording of the results; and

          •    evaluating further environmental risks.




M&J Marine Services                            Page 20                    Environmental Management Plan
Log in to download the original file

220711 Noosa Oyster Project - CEMP.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.