220711 Noosa Oyster Project - CEMP
Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Table Of Contents
1. Background 5
1.1. Introduction 5
1.2. Environmental policy 5
1.3. Project Description 5
2. Environmental Management Structure and Responsibilities 6
2.1. Director/ manager 6
2.2. On site Supervisor/ Person in charge 6
2.3. Employees and Sub Contractors 6
2.4. Approval and Licensing Requirements 8
2.5. Environmental Training 8
2.6. Emergency Contacts and Response 8
2.7. Hazardous Substances 10
2.8. Emergency Response Procedures 10
2.8.1. Fire Emergency 10
2.8.2.Gas Leak Emergency 10
2.8.3.Leak Or Spill Emergency 11
3. Implementation 12
3.1. Risk Assessment 12
3.1.1.Air quality 12
3.1.2.Erosion and Sediment Control 12
3.1.3.Water Quality 13
3.1.4.Flora and Fauna 14
3.1.5.Community Relations 15
3.1.6.Tra c 15
3.1.7.Waste Management 15
3.1.8.Noise 16
3.1.9.Heritage 16
3.1.10.Hazardous Materials 17
3.1.11.Soil Contamination 17
3.3. Environmental Control Plan 18
3.4. Environmental Schedules 18
M&J Marine Services Page 3 Environmental Management Plan
ffi
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.