Original source · versioned page text
220711 Noosa Oyster Project - CEMP
Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
WASTE REGISTER
Project Name:
Address:
TO
Waste
TAL On-site Re-
Materi
amo use Off-site Re-use
al Type Dat
unt (Specify amount (Specify contractor Off-site Disposal
e.g. soil, e and recycler)
rock,
3(m re-use onsite and
vegetation and/or intended use)
etc. tonnes
)
amoun
amount use/ amount pick up
name of t name of
(m3/ locati (m3/ time/ destination
recycler (m3/ contractor
tonnes) on tonnes) date
tonnes)
M&J Marine Services Page 34 Environmental Management Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.