1.1. General
This document describes the intended marine plant and water quality monitoring plan for
the Noosa Oyster Ecosystem Restoration project as further described in the Contract
between The Nature conservancy and M&J Marine Services PTY LTD
1.2. Project Background
The estuarine environment of the Noosa River was once dominated with extensive rock
oyster ecosystems. Oyster ecosystems were largely lost however, in the late 1800s to early
1900s. At the peak of the wild oyster harvest industry (1906-1907), it is estimated that 2-3
million oysters were harvested in the lower estuary each year. The commercial oyster
industry in the Noosa River ceased to be economically viable by the 1940s.
This project responds to the loss of natural hard substrates in the Noosa River by re-
introducing locally sourced rock in configurations that rock oysters and associated species
(e.g. pearl oysters, leaf oysters, hairy mussels, tunicates and macroalgae) readily colonise.
The design and placement of the rock substrate considers historic location of oyster beds
plus physical features, such as aspect, height, dimensions and rugosity in a way that can
help mitigate physical and biological threats to the recovering ecosystem such as
smothering, heat, erosion, predation and human disturbance.
2. Objective
The objective of this Marine plant and water quality plan is to ensure minimal impact to
the river system and its existing marine life during the construction by monitoring our
impacts and controlling them with the use of floating silt booms if required.
We will do this by;
• Identifying whether the impacts on water quality on the active build site and
general water based works are local and temporary
• Identifying when a plume has the potential to cause adverse social and/or
environmental impacts and to provide the opportunity to limit these impacts with
particular attention to the adjacent sea grass and mangrove areas.
3. References
This document should be read in conjunction with the Project’s Construction Environmental
Management Plan (CEMP), which is the over-arching plan that details the procedures and
policies to be following in executing these works.
ABN: 766 242 991 45 Page 3 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.