Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Compiled Approved Plans OPW19-0278.01 pdf · OPW19/0278.01

of 7

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
            -
    NOOSA COUNCIL
    APPROVED PLAN
OPW19/0278.01 16 APR 2020


[OCR of page images]
 

 

DRAWING SIZE - AT

\ LOTS 2 & 3 ON RP 78252
i] ie dt st

 

NOOSA COUNCIL
APPROVED PLAN
OPW19/0278.01 16 APR 2020

 

 

 

Level Origin PM 56277, RL 1635m

8
|
|

   
 

PROVDE ADDTONAL 3/N16
BARS 2 ASO.) N TCP OF

FETANING WALL FOOTNG FOR
SEWER PROTECTON

 

 

 

 

   

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tae = 3 .
REFER ORG OWA FOR 5 I 7
‘SEWER PROTECTION /
DEALS, a , Mon
oe
UNDSORPG WLS _
AGENT REPOS ~~
OREN ERED
NNN !
“ype 1 alge EAN “Sram APPROX. FILLI VOLUME 1495m 2
(a Sion 10 Now i
Nm FSET 1D ~ 4g wog soe
a
° Str 1% ee :
» I. -
' be i
t eS =
NAA AAA AY Al ¥ .
‘l T ze
— el | e BA
ings iy FUL=-01.2m =
i g &
Ig
Lol
I
a 1 FILL-0.9m cP.
es smone 5 x00 | 4 aemeage je Tsogn~ ~~~ ~~~ _ ew nper--—¢ ----— re
EI ade LS | See hee eS “ RP! BOUNDARY —
BEEP aloe cnc mn —
1k or rere Woe SEVER PROTECTON
fs ova nop -— A. | wen ee aenats| ‘
oie one ben ne S Et oe .
(Rub seep sera N. |
Jerome ronmen S
CML TEM NE emus soe
1
CAICAL DEPT Eien osm apne ous SITE PLAN — EARTHWORKS & RW SETOUT
pa ast ‘Seale 1: 200
RAID naccem onan
{Gao foe umn ota
LEGEND
TINE wanine 0e W NCEONE
SOFRACTR 7m GENTE aL SEREES FAR TO | He QUEENSLAND AL OF ONFOR &
TO BE PROTECTED IN ACCORDANCE WITH THE TRAFFIC CONTROL DEWCES & AS 2890.1 # EXISTING SURFACE SPOT LEVELS.
SOY RSE SNE fate Soe rojas ova ECE
‘SUPPLY LINE
INDICATES EMISTING SEWER LINE
INDICATES PROPOSED SEWER LINE
INDICATES TELSTRA LNE APPROX
ALIGNVENT, BULDER TO CONF
EXACT LOCATON PRIOR TO WORKS
wee tetacer wrx CATES EXSTNG STORER
DRAIN

DIAL 1100

BEFORE YOU DIG

CS

 

 

 

Fil-1.8m

INDICATES DEPT OF CUT OR FILL
AS NOTED

REVB

a

(
¢
se
?
(
?
t

VAN ~yY
)

RP. BOUNDARY

ni2 10?
1 FULED LOT
| GROUND LEVEL

 

190 BLOCK - CORE
FILLED NI2—400 V &e He
~ LAP BARS SOOM,

—
ANE woRES.
BEFORE. POUR

Gieat-cst 0, ane
ROUND LEVEL

ADDITONAL 3/16

450 (L) WHERE

PROVIDE FULL HT.
MOVEMENT JONNTS AT
80M CTRS,

 

 

 

med

 

200MM FREE DRAINING
BACKFILL WITH AGI PIPE

 

 

 

 

  

 

 

 

NomeD oW PLAN J 70 OUTET.

a2 150 TAK HEEL S182

T 5 WESH TOP 40° COVER
1500 -

 

 

 

¥ SLITTW TOP & BOTTOM
6 UGS AT 900 CTRS

 

 

 

 

BLOCK RETAINING WALL - TYPE 1

TYPICAL SECTION

1
‘SPOON DRAIN OR SMUIAR

[ TO RE-DIVERT STORMWATER,

CEOFABRIC OR SIMIAR FOR
SLT/ANES RETAENSION

1
VERTICAL MEMBERS AS PER |
TABLE, 1200 CTRS. RAKE
BACK AT ANGLE SHOWN,

   

‘200%50 HORIZONTALS
For DEPTHS UP TO 1600
BEYOND USE 200X75. ‘200X400MM FREE DRAINING
BACKFILL IN CEOFABRIC
<}——— WRAPPING WH AGI PIPE TO
OUTET.

GRADE CONCRETE. AWAY
FROM POSTS.

‘He REAEAINED

 

(GROUND LEVEL

 

20NPA COMPACTED
CONCRETE,

BERR ARSSBEEIND.

 

 

LEEPER RETAINING WALL — TYPE 1 ALTERATIVE
TYPICAL SECTION

 

 

 

 

 

 

 

 

 

 

 

“H RETAINED | VERTICAL MEMBER | FOOTING DEPTH
(0x8)

600, 200 x 75 400,

300 TO x WO

1200 700 x 100 1200

1600. 700 x 200 1500

7000 2/25 x 200 | Ta00
_—,-
pate

VERTICAL

WEWBER

Cum? —* Smt

‘CONSTRUCTION NOTES.

5 Se SNES RE To COURED OW HTC,
OSRDWCKS ENE ESE ORG MO TE AATEC.

SNE Gr 6 APO or caTNG AL STG SS

fs AOC ME ATED CRT PT NE

FODPARS wo OREN
\ ng en os ork on.

2 OMENS MRE WOT OEED FOR COMING EES

5 Gate amen 1 sn BX BEAN A ASD

pennors ce stare

ACES FONT FRUTED FR EACH LOTION,
FoR RED BNE, WAIUA GOS APY TO

une
ML Saves 108 CAD A PRTED A ROARED FIR TD

FILLING NOTES:

ESTE 5 10 BE SORMPED CLEAR OF AL ORIN MATERAL NO
es
~ THE SUBGRE IS TO BE ROUED WH A VBRATIG STEEL OL
RULER TO ACHENE A MNMAY SLATE FELD CENI OF S58 THE
CEIMPACTEN 1 TD BE SUCENT TD ACHE A LOW CUNT OF 7
LOS PER Soon WH AN APROVD PERTH SAND FENEROVETER
FRA DEPTH OF 10m BELOW EXCAVATED LEAL OPES OF
CGMPACTEN TEST RESULTS SHALE PRESENTED To St CONSULTING
ENGREES FR APPROVAL
— THE FL MATRA. CLEA CRANUAR MATRAL (ESO TD A
CUAEY SiO ACURDANCE Wi ASY728) BE FREE OF mY
(FGANG WATERAL AO HAVE A CLAY CENTENT OF LESS THAN 2
(PUTTY NOE ESS THAN 75% UNEAR SARNIA OF 158. THE
PROPOSED MATERA TO BE NSPECTED BY 5c COSULTNG
NENEERS PRIOR TDS REMIVAL TO EXE TS COWPATHALTY.
= THE LB TOBE PLACED AMD COMPACT W ACCORDANCE WT
{SS7RG-1W96 TD A LEEL SUFCENT TO ACHEKE& LEVEL 1
CERTREATIN WT A MMMM FELATVE PED OENSITY OF 5,
CORES OF COMPACTN TST RESULTS SHALL BE PRESEN TD Soc
CINSLING ENGNEERS FOR APPROVAL
= FLMG AND COMPACTING ADACENT ESN STRUCTRE 510
1 STRCT A0toROANE WT THE ASOOMTED OETALS ND
SPEOFCATONS.
= MEAS WHEE EUSTNG SUTURES 08 TEES ARE REMOKD SLL
Be BACIFLED WI THE APPROD FL MATERA. COMPACTED
ACCORDANCE WT ASZATO-I996 TO AGHEVE A MRM RELATVE
FAL DENSITY oF ss
= ANT LOOSE OR SOFT WATERAL WNOOERED THE STE
PREPAKTIN SAIL BE REMDIED AND REPLACED WTH THE APROKED
FL AMTERMLCOMPACED WM AOGERDANE WT ASZETO-I896 TO
[AEE A MAMA RELATE FLD DENSITY OF 85
= ST ORANGE AND SLT PROTECTION MEASURES MUST BE ISTLED
PORTO CONSTRICTON CAENCNG.

ce eee oF

 

WET ENSTNG STORMWATER MANHOLE/PT
STNG SENER CONNECTION PONT
EAFORCED CONCRETE HEADWALL
ESTING SEVER MANHOLE
EISTNG STORMWATER MANHOLE
NEM 1050 STORMWATER MANHOLE
OB, BNSTNG EDGE OF BTUMEN

KC ENSTNG KERB & CHANNEL
NSL” NATURAL SURFACE LEVEL
FH ARE HYDRANT

TP EASA PIT

EP, ELECTRICAL POWER POLE
ERB —EASTNG KERBING

 

 

 

 

Femi | Deron te

 

 

 

FOR APPROVAL

 

D0 NOT SCALE FROM THIS DRAWN
a te cd eid
irra rome rare

 

 

 

OC) st ==

 

"OPERATIONAL WORKS:
EARTHWORKS & RW DETAILS

 

“Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE

 

 

 

 

OMe Wow 16 Dawn OK.
1280.8 25] FSS, ¥ lo62e- ows | C.

 

 
Full text of the other 6 pages

Page 2

            -
    NOOSA COUNCIL
    APPROVED PLAN
OPW19/0278.01 16 APR 2020


[OCR of page images]
 

 

DRAWING SIZE - AT

 

 

NOOSA COUNCIL
APPROVED PLAN
OPW19/0278.01 16 APR 2020

 

 

| tors 2 & 3 on aP ease
tev Oot AND
# Level Origin PM 86277, RL. 1635

DRIVEWAY SLAB
125mm THK
SLB2 MESH.
50mm TOP COVER

WET TOOLED
oo ONT,

LOWER SLAB MESH TO MAINTAN
40rvm TOP COVER CUT EVERY SECOND
\WRE SOmm CLEAR ALONG LINE OF
JONT

TJ) TOOLED JOINT DETAIL

  
  
 

16 DOWELS,
800 CTRS, 125 THICK

1340) connor
(0) /508,

KEY JOINT PROFLE.

 

‘STOP MESH 50mm
FROM JOINT,

Kd) DANLEY KEY JOINT DETAIL

    

YN TAMER,
Str COVER.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PIT TRIMMER DETAIL FOR PITS

 

wwrw.dialbeforeyoudig.com.au

DIAL1100

BEFORE YOU DIG

 

 

 

 

HATCHING INDICATES PROPOSED

INTER-ALOTMENT DRAINAGE,

ENSURE SMOOTH TRANSITION FROM
NEW FOOTPATH 70 NEW DRIVEWAY
EDGE, NO STEP. TYPICAL.

 

DEWEY CROSSOVERS N ACCORDANCE WH

PEA ST ORG

 

060 AND CONCI

NEW CONCRETE. 125 FOOTPATH /PAVED
AREAS SHOWN SHADED TO COUNCIL
STANDARDS (IPWEA rg SEO R065),
MAX TOOL ONT SPACINGS AT 20m
CRS, REFER LANDSCAPE ARCHITECTS
PLAN FOR SURFACE. TREATMENTS.
AX CROSSFALL GRADE OF 1 IN 40.

EXISTING CROSSOVER. REINSTATE
KERB TO COUNCIL STADNARDS.

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

EXISTING CROSSOVER. REINSTATE NOON
KERB TO COUNCIL STADNARDS. \
~ Ga, (KERB » ta a.
— : a= :——
« { THEW 2m (W) CONCRETE FOOTPATH wt EZ (9) ENGR PPA .
_ =P BY tk) a
~~ fa oe Te 1 We
I

 

rs) 7

 

 

 

 

 

 

 

 

 

 

 

 

ty

 

 

 

 

 

RP. BOUNDARY

   

 

 

 

 

 

 

 

 

ID eat HATCHING INDICATES PROPOSED
f ‘0m WDE EASEMENT FOR
! INTER-ALOTMENT DRAINACE.

a)
\
if 2

— UNIT 2 [4
FFL 270 '

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F
JI™

UNIT 3
FFL 270

RP. BOUND "—

 

 

 

 

“10m WDE EASEMENT FOR

 

SITE PLAN — DRIVEWAY & ACCESS
Sede T 200

 

"ALL UNE WARKNG 10 BE W ACCORDANCE
INTHE QUEENSLAND MANUAL OF UNIFCR
"RAFFc CONTROL EMCES AS. 2901
PARKING FACLTIES PART 1: OFF-STREET CAR

CONTRACTOR TD LOCATE AL SERMCES PRR TO
COMMENGNG HORKS ON SE. AL SERVES ARE
10 BE PROTECTED I ACCORDANCE WIM TE
AUTHORITY REPONSELE FOR THE SERVICE

 

 

 

 

 

 

 

 

a

 

 

 

{GENERAL NOTES

Den
DETERMINED
ON-SITE
PAVEMENT MATERIALS
125mm N25 CONCRETE PAVEMENT, SLB2 MESH MIDDLE
100 THK COMPACTED BASE COURSE SAND OR CRUSHER DUST
~SUB-GRADE PREPERATION IN ACCORDANCE. WITH
SPECIFICATIONS /NOTES.

DRIVEWAY CARPARK PAVEMENT SECTION

* SUBGRADE PREPERATION, REFER

 

 

(ts)

(ks)

 

 

 

 

 

 

LEGEND

INDICATES EXISTING SURFACE
CONTOUR AND LEVEL TO AHD.

 

EXISTING SURFACE SPOT LEVELS.

INDICATES PROPOSED FINISHED
SURFACE LEVELS

INDIGATES DIRECTION OF FALL
TO FINSHED SURFACES.

125 THK. DRIVEWAY SLAB ON
COMPACTED MATERIAL, SLE MESH,
TOP 50 COVER, FLEXIBLE JONT
[AGAINST MASONRY /CONCRETE.

100 THK. TERRACE SLAB ON
CCOMPACTED WATERIAL, SL72 MESH,
TOP 40 COVER, 200(M) x 200(0)
EDGE_THCKENNG AT UNSUPPORTED
EDGES. FLEXIBLE uONT AGANST
ASONRY /CONCRETE.

DENOTES WET TOOLED JONT TO
TERRACE SLAB, REFER TO DETALS

DENOTES FORMED KEY JOINT 10
DRIVEWAY SLAB, DETAIL TO DETAILS

INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE

INDICATES EXISTNG SEWER UNE

INDICATES WATER MAIN. APPROX
‘AUGNWENT, BULDER TO CONFRM
EXACT LOCATION PRIOR TO WORKS.

INDICATES TELSTRA LINE APPROX
‘AUGNWENT, BUILDER TO CONFRM
EXACT LOCATION PRIOR TO WORKS:

INDICATES STORMWATER DRAIN
PROPOSED AS NOTED MIN 1 IN
100 FALL UNLESS NOTED
OTHERWISE

—_ INDICATES STORMWATER DRAIN

EXISTING AS NOTED MIN 1 100
FALL UNLESS NOTED OTHERWSE

Gomi? —t _fmt:100 @ at
1:200 @ AS

Sa Fs a.
2 AL'SUERENS W MIERES
AacHTERA AMS
Aiea cs To AEH HE BONER
SUE SUE & SPOOL oe LoATG AL. STAG
Snes HN ND GMT HE MOMENT Mo SVL ASE
THATAL NW oi EM ACEROANCE MH TE ATED
FORTS 0 OREN

ST EOS 0B SA OTF
2 Bones MET SSS FO MC OS
5 OOGRE URE 1o a 2 He BNE
NGA MENNENTS SIP

i urea ite 98 AED CML SUB

oon
JtPasen OS 10 nm WOE WET ToD WH EY
Bo west wR CT aun Jom
ve sets Fa FETTID Fo a WEN

3 or Are cm CS TE

al seis 20 wo OTE 1S RD
oR TWO COE

roRAULCS
| mu sr Som we cuca a RRB
ECM RAN FR LOCATING OFF

AL Sir natWUS M0 WE RETIN MT THe
‘lone stone ro Acre WH ASN.

Hage UREOETOC AFTER OFC AL NEES POTS

{CHE CONTACT To NTE POSTON LL STAG
‘Saenz 16 NOENED OUTESE MD SINE FUNG PRO TO
2DRCP HE RNC SIND PPE AS MID LD AT ANAM
Gia oT IGTUAD ve DCTS
Aeron WI HE NARACRES REUREENS
ine

7. ANTE SLY PERI BON GAD 1 0;

aa ne use Ho SY He 2

is a PLETE

‘eo coe
WER SES oT PETE RD LBS 0 AL
{ENS WO ODWEENONG SUL BE WE ARNE RE
Scemgoce MT ASEH,

1 Os, NPT OPS WO QOBKE Cs TUNED
‘HAIR oF PESMUM PARENTS ARE 10 ITED WH ETHER

WET ENSTNG STORMWATER MANHOLE/PT

STNG SENER CONNECTION PONT
EAFORCED CONCRETE HEADWALL
ESTING SEVER MANHOLE

EISTNG STORMWATER MANHOLE

NEM 1050 STORMWATER MANHOLE
ISIN EDGE OF BTUMEN
ESTING KERB. & CHANEL
NATURAL SURFACE EVEL
FH ARE HYDRANT
TP EASA PIT
EP, ELECTRICAL POWER POLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ge HA
Shiv ore ia ues freer
+ [SREP RE SF orm

SS a
a
FOR APPROVAL
00 NOT SCALE FROM THIS DRAWING
Epcpsursre
> esuaueaas
“OPERATIONAL WORKS:
DRIVEWAY & ACCESS
“Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
ste Nov 16 Dawn 0K
raze, ¢{|oeze1-owe| ©

 

 

 

Page 3

            -
    NOOSA COUNCIL
    APPROVED PLAN
OPW19/0278.01 16 APR 2020


[OCR of page images]
 

DRAWING SIZE - AT

 

NOOSA COUNCIL
APPROVED PLAN

| OPW19/0278.01 16 APR 2020

 

 

 

LOTS 2 & 3 ON RP 78252
Level Datum AH
Level On PM 56277, RL 1L.635m

——

  
    
    
  
 

102 souoney
was ice

Fup auwe
S10 RETANNG
wa

‘508 ans De FOL

   

— ere MT
FECTINGLAR GATE OE
Face aT Low nis
‘ONG REHEORNG Loe

sme ceo LEE.

Fern POPE,

DETAIL ON THS

oe ee 1 00 cae 0 STN TE an
Prov spact IL To MAH DISING GL
icone Pee

THIS SWP PROVIDED AS
DISCHARGE PONT FOR
NEIGHBOURING ALOTMENT

DRAINAGE,

EXISTING HCB's & NEW SW DRAINAGE
LUNE TO BE PROTECTED AS PER

‘SEWER/STORMWATER PROTEC
DETAILS ON ORG 26281-OWi,

u pana

wo

ROOF RUNOFF

ae

§
4”

COUNCIL STORN WATER
SYSTEM

INALTRATION PITS
TREAT FIRST FLUSH RUNOFF FROM ROOF'S
STORAGE AND ONGOING INALTRATION
REDUCES DEVELOPED STIE RUNOFF

  

WATER,

 

AUSDRAIN ENVIRONODULE 2
INFILTRATION CELLS. REFER

HATCHING INDICATES PROPOSED
INTER-ALOTNENT DRAINAGE.

A

2/n25xT5x4.0 RHS (GKLV.)
LAD AT 1 in 100 MN
INSTALL TO NEW KERE
ADAPTORS AND MAKE
FOOTPATH GOOD.

se

2/125xT5x4.0 RHS (GALV)
UND AT in 100 MIN
INSTALL TO NEW KERB
ADAPTORS AND MAKE
FOOTPATH GOOD,

LIZABETH STREET

FALL LANDSCAPED AREAS TO
FORMED FLOW PATHS TO ONERT

[— RUNOFF TO GRATED DRAINS AND
SW PITS. 1 in 100 MIN FALL
TYPICAL,

 

 

 

 

2/125x5x4.0 RUS (GALY.)

 

  

SHEET.

 

52

 

®
(
?
?
°
?
‘

 

TION

 

RP. BOUNDARY

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

  

1.0m WIDE EASEMENT FOR

 

UNIT 2
FFL2A0-— =

   

 

 

 

 

 

 

 

  

 

 

j |

 

 

 

 

 

e

(1.0m,
UNIT 3 g
mL 270 aE

 

 

  

 

 

 

foes

 

 

 

 

 

STORMWATER MANAGEMENT

 

‘SITE_PLAN
Sede T 200

 

cm
CEAMENCNG WORK

 

S

TRACTOR TO LOC

ATE ALL SERMCES
ON STE. AL

ator

0
SERVES ARE
OBE PROTECTED IN ACCORDANCE WT THE
AUERITY RESPCNSBLE FORTHE SERVICE

 

THES DRANG IS TOBE READ N CONJINCTON
WTA THE STORAWATER WAMAGEVENT REPORT BY
SG CONSULTNG ENGNEERS (a. 2523(S)

ALPES 70 BE LAD AT 1 100 UN
UNLESS NOTED

 

 

 

BEFORE YOU DIG

 

 

 

 

STORMWATER
INFLOW

RP. BOUNDARY

 

 

FALL LANDSCAPED AREAS TO

\__ FORMED FLOW PATHS TO DNERT
RUNOFF TO. SW PITS. 1 in 100
MIN FALL TYPICAL,

AUSDRAIN ENVIROMODULE 2
INFILTRATION CELLS 10 IN LINE,
WRAPPED IN GECFABRIC

rete to00 vPVE
rt
a

oP

 

 

    
   

AUSORAN ENVIROMODULE 2
INFILTRATION CELLS. REFER
“ DETAL ON THIS SHEET.

 

HATCHING INDICATES PROPOSED
1.0m WIDE EASENENT FOR
INTER-ALOTMENT DRAINAGE.

LOCATE. STORMWATER PITS:

AAT LOW PONT ON

NEIGHBOURING PROPERTY
REFER TYPICAL DETAIL

Bx so? f

r

los

 

 

 

LEGEND

INDICATES EXISTING SURFACE
CONTOUR AND LEVEL TO AHD.

 

 

4° BAISTNG SURFACE SPOT LEVELS.

INDICATES DIRECTION OF FALL

Aly
TO FINSHED SPOON DRANS.
x INDICATES PROPOSED FINISHED
SURFACE LEVELS
60-150 150(W) GRATED DRAIN WITH
HEAVY DUTY GRATE
3

4505q PIPE JUNCTION BOX WITH
BOLTED UD, PRECAST
CONCRETE

450Sq FIELD INLET, PRECAST
CONCRETE WITH RAISED GRATE. FOR
LANDSCAPED AREA DRAINAGE.

 

5°35 soqsq FIELD LET, PRECAST
CONCRETE WTH RAISED GRATE FOR
LANDSCAPED AREA ORANAGE
S$ sromuwarer vert. neers 10
(MM COLLECT PONONG FROM

NEIGHBORING PROPERTY.
REFER DETAIL

INDICATES PROPOSED STORMWATER,
DRAN EXISTING MIN 1 in 100,
GRADE UNO,

sw.

 

BP DENOTES APPROXIMATE. DOWNPIPE
LOCATIONS TO BE CONFIRMED BY
ARCHITECT AND HYDRAULIC
DESIGNER,

PROVIDE NSPECTION OPENINGS

STORMWATER OUTLET

‘as STORMWATER
TL T_ _omow
—
x PROVIDE DROPS AT EACH END
Z SJ) oF THE PIT FROM THE MAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THROUGH DRAIN TO THE
SLOTTED PIPE IN THE BASE

PROVIDE SLOTIED PIPE

THROUGH BOTTON OF

AUSDRAIN INFILTRATION SOAKER PIT DETAIL

ALL PIPE PENETRATIONS THROUGH THE GEOFABRIC TO
BE FITTED WITH STANLESS STEEL PIPE CLAMPS,
GGEOFABRIC TO BE LAPPED AT JOINS WITH A ROOT
INABITOR PROWDED ALONG THE JOIN LINES

Gomi? —t _fmt:100 @ at
1:200 @ AS

1 OT Soe ow ms mam.
{LAL oups Wl
‘moan aM

‘cA NGS HEB RET TOE NER
SUT BLE RSIS For Loa ALL EMG
Sis WTHW 0D KUEN HE ALOMENT 0 SH SE
THATALL Rw mS EW AOROMRCE TTA

gD EAMG, Ee SINR

(NCCE SHPAE LEME #506 OER 308

5 GMERE WS WARNE WT S138 1S 380

6 ROR AOE TS 13, PACED CTA SB

oon,

{PaPvGou 0B Yom WHE WET OUD WH CE
Sh WE OT ANG

oust me
ge es Son Po foe LC} ALON
FO CURED MEWS, WAN GES APL TO MSDE

SALW SO CMPLD Fe REQREMNTS F AUTHORES
ioc ASHEN, FE GTN AL MES PETS ND
renos

{CT CTC 61 CNN HE POSTEN OF AL STNG

eens TO LPG LNG a0 DATA UN GE
ort we,

TAT SPL PERK ON GROND TBE;

fam tu on Ss Ht oT M8

fuss 1 PLT

{CALL ABE GONG AKO WEIL TER SPY FENORE. TO BE

Tec come

A SERCES ENO ERATED W RO SUBS MO AL
OECTINS SL BE WE MME HE SU.

‘re AORN ET HEALED AE To SLED

ACOMDIMCE WI ASIA, HOE RES ET E MSVLED

sca

‘CEN-OTS, MECN PENNS 0 CG CPS STUATD

YEHGLAR oR RES PRESENTS AED EE AD WH THER

AS On OS

TAIL -GOND LES SIAL BE ACGROMCE M ROR

couse Pa

CALL STE PES WO WER SERCES PAERATNG SUBS TBE

(RAPED WN AFRO LSE 7 RT OPP

{He RM SERVE RPE 10 HE NMA EL PE

SET UNS OTD CTC.

KEY

SWPT  ENSTING STORMWATER MANHOLE/AT
STNG SEWER COMNECTON PONT

RR
8

Ro. HW

a

SWWH ENSTNG STORNWATER MANHOLE

SWMH NEW 1050 STORUNATER MANHOLE

QB. BASTNG EDGE OF BTUVEN

K & C BUSTING KERB & CHANNEL

NSL’ NATURAL SURFACE LEVEL

FH FRE HYDRANT

1 THSTRAPIT

EP, ELECTRICAL POWER POLE
STNG KERBNG |

BR

 

a [sw a omen ines samaes [19 /09/0
Seaee aa ash, [evan

 

 

 

 

 

 

Dern

FOR APPROVAL
00 NOT SCALE FROM THIS DRAWING

Os B=

OPERATIONAL. WORKS:
STORMWATER MANAGEMENT
“Lots 2 & 3 RP78252

Elizabeth St, NOOSAVILLE

 

 

 

 

 

 

 

 

 

 

 

ste Nov 16 Dawn 0K
PES, { 26281-Sw | €.

 

Page 4

     1.0 GENERAL                                                                  Unless otherwise specified, reinstate all existing surfaces,                      Methods of protection shall include but not be limited to      Sandy subsoils are preferred for these works. Clay soils       9.0 TURFING                                                         LANDSCAPE SPECIFICATION
     All works to be performed by a licensed Contractor                           items, structures and anything disturbed or damaged by                            the following:                                                 may be used when in a dry state, but extreme care is           Supply and install A-grade turf (variety specified on
     familiar with landscape construction of this nature. The                     the performance of the works, to its condition at the                                                                                            necessary to ensure the resulting subsoil profiles are not     drawings) to areas shown on drawings. Finishing levels
                                                                                                                                                                    · Construction of temporary surface swales;
     Contractor shall verify the location of utilities on site prior              commencement of the Contract, other than that forming                                                                                            compacted or subject to excess moisture.                       should be flush with adjacent surfaces unless otherwise
                                                                                                                                                                    · Diversion and dispersal of concentrated flows to point
     to the commencement of construction, and ensure that                         part of or directly modified by the new work.                                                                                                                                                                   detailed. Spread topsoil and grade surface to ensure a
                                                                                                                                                                      where the water can pass through the site without            Supply and install imported topsoil that complies with
     they will not have an effect on the works. The Landscape                     Remove and cart away debris, spoil and surplus building                                                                                                                                                         level finished surface, which drains to nominated field
                                                                                                                                                                      damage;                                                      Australian Standards to all turf (100mm) and garden                                                                                       -
     Subcontractor is advised to visit the site to satisfy                                                                                                                                                                                                                                        gullies.
                                                                                                                                                                                                                                                                                                                                                                     NOOSA COUNCIL
                                                                                  materials from the site and buildings, with the exception                         · Construction and maintenance of silt traps (eg hay           (300mm) areas as shown on drawings unless otherwise
     themselves as to local conditions, accessibility, storage                    of those works associated with others prior to practical
                                                                                                                                                                      bales) to prevent the discharge of scoured materials to      specified. Ensure modified site soil is free from stones,      Turf to be free from nutgrass or other noxious weeds or
     space, the full extent and character of the works and the
                                                                                                                                                                                                                                                                                                                                                                     APPROVED PLAN
                                                                                  completion.                                                                                                                                                                                                     any other material deleterious to plant growth.
                                                                                                                                                                      downstream areas;                                            sticks, roots, rubbish and material toxic to plant growth.
     site, the nature of the ground, the level of the subsoil
                                                                                                                                                                    · Progressive restoration of disturbed areas;                  Modified topsoil shall have a friable structure with good      Deliver the turf within 24 hours of cutting, and lay it
                                                                                                                                                                                                                                                                                                                                                                   OPW19/0278 8 JAN 2020
     water, the supply of materials and water and the
                                                                                  2.0 EXCAVATION AND EARTHWORKS                                                     · Construction of temporary siltation fencing.                 drainage and high organic content.                             within 36 hours of cutting. Prevent it from drying out
     execution of the contract generally. No claim will be
     allowed for any alleged inadequacy of the description                        Inspect the site and ascertain the nature of excavation                           Any erosion damage reinstatement or cleanup as a result                                                                       between cutting and laying.
                                                                                                                                                                                                                                   Fire Ant Control
     herein. Should there be any conflict, the Contractor shall                   required and the working conditions that will be                                  of the contractor not adequately protecting the site,
                                                                                                                                                                                                                                   The Landscape Subcontractor is to allow to carry out all
     notify the Landscape designer immediately.                                   encountered prior to the commencement of work. The                                materials or the works shall be the responsibility of the
                                                                                                                                                                                                                                   necessary measures, inspections and safeguards to ensure       10.0 EDGING
                                                                                  location of topsoil stockpiles, roadway and cut                                   landscape contractor.
                                                                                                                                                                                                                                   Fire Ants do not enter the site via equipment, machinery,      Supply and install all edging as per drawings. Paved edging
     Figured dimensions shall take precedence over scale                          embankment profiles and water connection points must
                                                                                                                                                                    Remove temporary erosion control measures when they            materials and plant stock.                                     shall sit on 100mm of concrete. Timber edging must be
     measurements and large scale drawings over small scale.                      be taken into account.
                                                                                                                                                                    are no longer required.                                                                                                       constructed from hardwood and joined using galvanised
     Unless otherwise specified the Drawings and Specification                    The Landscape Subcontractor shall ensure measures to
     shall include everything reasonable for the proper and                                                                                                                                                                                                                                       fittings.
                                                                                  minimise erosion and siltation relative to the works                              EXISTING TREES                                                 6.0 FERTILISER
     entire completion of the work, not withstanding any                          outlined in this specification, including staging of the                          Protect all existing vegetation unless otherwise specified.    Provide proprietary fertilisers, delivered to the site in
     omission in the Specification or Drawings.                                   works, stabilisation of exposed surfaces, diversion drains                        All vegetation and weed removal is to be carried out using     sealed bags marked to show manufacturer or vendor,
     Verify discrepancies between Specification and Drawings                                                                                                                                                                                                                                      11.0 IRRIGATION
                                                                                  and silt traps over and above those already installed in                          industry standard accepted safety procedures and               weight, fertiliser type, N:P:K ratio, recommended uses and     The irrigation system shall be fully automatic provide even
     with the Landscape Designer before proceeding with the                       civil works.                                                                      equipment to ensure personal and environmental                 application rates. Store in a dry secure environment.
     particular work. Failure to do so will not be taken as a                                                                                                                                                                                                                                     cover to all grass and planting areas. Do not waste water.
                                                                                                                                                                    protection. Avoid damage to nearby trees and                   Apply according to manufacturer's recommendations              Take particular care to install the correct nozzle for the
     reason to claim for extra work.                                              Surface drainage shall be diverted clear of excavations and
                                                                                                                                                                    surroundings.                                                  (rate/reapplication/watering).                                 situation, and also allow for specific sprinkler and valve
                                                                                  covers shall be provided where necessary for safety.
     Convey soils, earth, sand, loose debris and the like to or                   Ensure that run-off is not concentrated onto adjoining                                                                                           Garden beds - Slow Release - Osmocote or similar               adjustment as will be required.
                                                                                                                                                                    Grub out stumps and roots over 75mm diameter to a
     from the site in a manner that will prevent dropping of                      properties and does not cause a nuisance thereto.                                 minimum depth of 500mm below sub-grade. Stumps less            approved.                                                      This Specification is not project or site specific. The intent
     materials on streets, public and private areas. Cover all                    Finished surfaces shall be graded in accordance with                              than 75mm diameter shall be cut off at ground level and        Tree plantings - Slow Release - Osmocote or similar            is to provide a basis on which a professional standard,
     loads with taut heavy-duty purpose fitted tarpaulins to                      Construction Plans.                                                               treated to prevent regrowth.                                   approved.                                                      fully operational, compliant (with all applicable industry,
     ensure no loss of load or dust. Ensure that the wheels,                      Erect barriers as required to prevent excavated material                                                                                         Grassing - Growforce 301 or similar approved100kg/Ha           local authority and Australian standards) irrigation system
     tracks and body surfaces of all vehicles and plant leaving                   and rocks from intruding onto adjoining properties.                               Completely remove woody weeds within the extent of                                                                            can be provided for the site. Submission of the design to
     the site are free of mud and that mud is not carried onto                    Establish exact locations of services, drains, sewers and                         works.                                                                                                                        Local Authority for approval and all costs involved are the
     adjacent paved streets or other areas.                                                                                                                                                                                        7.0 MULCH                                                      responsibility of the irrigation subcontractor.
                                                                                  water supply lines and points prior to commencing works                                                                                          Supply and install organic mulch to a minimum of 100mm
                                                                                  and ensure their protection during the works.                                                                                                                                                                   Fully automatic commercial quality system:
     Check all delivery tickets, labels, identification marks                                                                                                       3.0 FINISHED LEVELS & GRADES                                   and gravel mulch to a minimum of 50mm. Ensure mulch
     and, the goods themselves to ensure that all products                        All major earthworks associated with this project shall be                        Minimum cross falls of 1:50 on planting and pathways to        meets Australian Standards and is free from deleterious        · 24 station (min) commercial controller in lockable box;
     comply with the project documents. Where different                           carried out as part of the Landscape Works.                                       drainage collection points and overflow points. Planting       matter, fungi and disease. Mulch shall finish 25mm below       · Mains tapping point back flow device, including dual
     types of any product are specified, check to ensure that                                                                                                       areas should not exceed 1:3.                                   adjacent surfaces.                                               check valve in lockable box to council requirements, to
     the correct type is being used in each location. In                          ENVIRONMENTAL PROTECTION
                                                                                                                                                                                                                                                                                                    be undertaken by builder refer to hydraulic drawings;
     particular, check that:-                                                     The Landscape Subcontractor should consider in every
                                                                                                                                                                                                                                                                                                  · Filter at back flow;
     All stock has been adequately protected for loading and in                   instance whether the use of chemicals is strictly necessary                       4.0 CULTIVATION & SUBSURFACE DRAINAGE                          8.0 PLANT SUPPLY
                                                                                                                                                                                                                                                                                                  · Control wire;
     transit.                                                                     before application, and assess the product, site conditions                       The Landscape Subcontractor is to provide for sufficient       The Contractor shall supply plants as specified in the
                                                                                                                                                                                                                                                                                                  · Conduit access to all isolated areas;
     The sources, types, qualities, finishes and colours are                      and species to ensure minimum risk to his employees,                              surface and sub-surface drainage to garden and grass           planting schedule. Plants shall be delivered on site true to
                                                                                                                                                                                                                                                                                                  · Drip irrigation to new garden areas;
     correct, and match any approved samples.                                     other users of the site and the environment.                                      areas to ensure adequately drained soft landscaped areas       pot size, species and type, and free of weeds, disease and
                                                                                                                                                                                                                                                                                                  · Pop-up irrigation to grassed areas;
     The correct species, cultivars, pot sizes, plant height, girth                                                                                                 free from surface ponding water and heavy/ waterlogged         fungal infection. Substitutes will not be made without
                                                                                                                                                                                                                                                                                                  · Coordinate penetrations and suspended under slab
     or spread have been supplied for each consignment from                       When using pesticides the Landscape Subcontractor must                                                                                           prior consent of the Landscape Designer.
                                                                                                                                                                    soils. Surface and sub-surface drainage is to aid in the                                                                        conduit and copper work with builder.
     the supplier.                                                                use a certified operator and take appropriate safety
                                                                                                                                                                    healthy growth and continued thriving of all plant stock       All plants shall be true to scheduled nomenclature, well       · An approved rainswitch override is to be installed to
     All materials should be clean, undamaged and otherwise                       precautions in accordance with all current statutory
                                                                                                                                                                    and grass areas.                                               formed, hardened off and disease free nursery stock.             cut-off irrigation after a pre-set rainfall level has been
     in good condition.                                                           regulations.
                                                                                                                                                                    Comply with the relevant Australian Standards to the           They shall be container grown in potting soil with root          reached. Install to manufacturers' directions with a
     Where appropriate protective covers should be intact                                                                                                                                                                          system firmly established but with no large roots growing        manual override switch.
     with unbroken seals.                                                         The Landscape Subcontractor must dispose of unused                                extent that they are relevant and not over-ridden by the
                                                                                                                                                                    specification.                                                 out of the container. No plant shall be pot bound.
                                                                                  and unwanted containers and chemicals in a safe way in
                                                                                                                                                                                                                                   Ensure that trunks and branches are free of dieback,           Give 10 working days notice of the proposed date for the
     Ensure adequate provision is made for the protection and                     accordance with the methods approved by the relevant
                                                                                                                                                                    Cultivate sub-grade to a minimum depth of 150mm prior          cavities, sunburn and secretions. Trunk and branches are       instruction. Provide written operational instructions for
     storage of deliveries. In particular ensure that:-                           authorities. Disposal will be off site.
                                                                                                                                                                    to placing topsoil to all planting and turf areas on ground.   to be evenly tapered and textured typical of the specie.       the installation under the Contract. The defects liability
     Materials which may deteriorate with storage must not                                                                                                                                                                                                                                        period for the irrigation system shall be 52 weeks from
     be stockpiled on site.                                                       Herbicide must never drift, fall or run-off onto open water                                                                                      Plant material is to be matured enough to support
                                                                                  or onto adjacent sites, gardens or ground not intended for                                                                                       themselves without staking.                                    the date of Practical Completion.
     Adequate and appropriate provision is made for storage
     prior to deliveries arriving on site. ALL materials in                       treatment.                                                                        5.0 FILL & TOPSOIL
     storage are to be suitably protected from physical damage                                                                                                      Fill and subsoil material used to make up levels shall be      Branches should be evenly distributed, exhibit a full well
                                                                                  The Landscape Subcontractor will be responsible for                               re-used from previous earthworks operations on site or                                                                        12.0 TANK INSTALLATION
     and extremes of weather and to minimise hazards                              assessing any potential wildlife problem when tendering                                                                                          formed canopy that occupies a minimum 1/3 of the
                                                                                                                                                                    imported as required and shall be excavated material                                                                          Supply and install tank to size and location specified as per
     persons, materials and equipment. Keep storage areas                         and during the course of the works. Allowance must be                                                                                            overall current height. Specimens are to be prepared for
                                                                                                                                                                    which is composed of natural site subsoils but free from:                                                                     drawing by others.
     neat and tidy.                                                               made for any protection or control of such pests the                                                                                             their intended purpose. For ex-ground stock where
     Do not use roads, driveways, paths hard standings and the                    Landscape Subcontractor deems necessary. Subsequent                                                                                              canopy modification is intended, provide details of how
                                                                                                                                                                    · Logs, stumps or other un-decomposed vegetative               each specimen's visual character will be at time of
     like forming part of the works for access or storage unless                  wallaby or rabbit damage to planting or other works will                                                                                                                                                        13.0 LIGHTING
                                                                                                                                                                      material.                                                    delivery.
     prior written approval has been given.                                       be deemed as defective work and subject to replacement                                                                                                                                                          All lighting is to be carried out out a qualified electrician.
                                                                                                                                                                    · Materials susceptible to spontaneous combustion.
                                                                                  as per the normal contract conditions.                                                                                                           Foliage shall be evenly distributed across the crown in        All recommended lighting is merely a suggestion, with the
     Operatives must be appropriately skilled and experienced                                                                                                       · Clay, of liquid limit exceeding 90 and/or plasticity index
                                                                                                                                                                                                                                   proportion to the branching structure as well as be of a       ultimate style of lighting used at the description of the
     for the type and quality of work and familiar with the                                                                                                           exceeding 65.
                                                                                  Any proposed method of protection or control of pests                                                                                            true colour typical of the specie, dense and of good size.     client.
     terms of the specification.                                                                                                                                    · Refuse and rubbish, including paper, plastics, rubber,
                                                                                  must be agreed with the Superintendent prior to use on                                                                                           Ensure foliage is free of deficiencies and burn. Plant
     Inspect products/materials/stock carefully before use and                                                                                                        metal and all type of containers.
                                                                                  site.                                                                                                                                            material is to be 'hardened' to full sun and exposed
                                                                                                                                                                    · Concrete, bitumen, brick, steel, masonry rubble or other
     reject any which are defective.                                                                                                                                                                                               conditions by the supplier to ensure successful plant          14.0 MAINTENANCE/ESTABLISHMENT PERIOD
                                                                                                                                                                      deleterious material.
     Use products/materials only in the method and for the                        Restrict dust caused by the Works to a minimum. Take all                                                                                         establishment into the site environment. For ex-ground         Maintenance of all landscape works is to be carried out by
                                                                                                                                                                    · Toxic substances and compounds that would inhibit
     purpose recommended by the manufacturer.                                     practicable steps to minimise noise resulting from the                                                                                           stock apply an anti-transpirant.                               the Contractor until completion of the landscape works.
                                                                                                                                                                      healthy plant life.
     Ensure appropriate quantities are utilised, provide                          Works.                                                                                                                                                                                                          Maintenance includes replacement of dead and/or
                                                                                                                                                                    · Any material not capable of being satisfactorily             At the time of the last plant stock review prior to site
     adequate measures for mixing and spreading of all                                                                                                                                                                                                                                            diseased plant stock, removal of weeds and rubbish, weed
                                                                                  EROSION AND SEDIMENT CONTROL                                                        compacted.                                                   delivery, plant material is to conform with the specified
     products or materials.                                                                                                                                                                                                                                                                       spraying and mowing.
     Set out components or stock to ensure correct                                Take all precautions necessary to prevent erosion,                                                                                               minimum plant sizes in the Plant Schedule. Plants shall not
                                                                                  contamination and sedimentation of the site, surrounding                          Any such material shall be removed from site to the            exhibit signs of having been stressed at any stage during
     positioning and spacings are achieved.
                                                                                  areas, water and drainage systems, in accordance with                             Landscape Subcontractors own tip.                              their development due to inadequate watering, excessive
     Protect finished work from subsequent operations and
     interference by others as project progresses.                                the Environmental Protection (Water) Policy 1997.                                                                                                shade/sunlight, suffered physical damage or have
                                                                                                                                                                                                                                   restricted habit due to growth in nursery rows.




  seed       landscape design                                          NOTES
                                                                       Use figured dimensions in preference to scaled.

                                                                       Notify the Landscape Designer before proceeding if any anomaly is found
                                                                       between this drawing and conditions on site.
                                                                                                                                                       Attn: Developer/Builder
                                                                                                                                                       Landscape Compliance Certification may be
                                                                                                                                                       necessary at BA Stage of development.
                                                                                                                                                                                                                     DRAWING

                                                                                                                                                                                                                    specification
                                                                                                                                                                                                                                                                                  CLIENT

                                                                                                                                                                                                                                                                                 KIDD + Co
                                                                                                                                                                                                                                                                                                                                                                                 PROJECT

                                                                                                                                                                                                                                                                                                                                                                                 160614
                                                                                                                                                       Please contact Landscape Designer for Detailed                drawing no.        160614 01
            t 07 3217 6491 m04 1616 9858
            po box 527 paddington qld 4064
                                                                       Details not certified for construction. Contractor responsible for structural
                                                                       engineering certifications,hydraulic certifications & building approvals.
                                                                       Levels taken from information provided from the Client's site setout plan.
                                                                       Confirm all finished levels on site prior to excavation.
                                                                                                                                                       Landscape Design to complete approval package
                                                                                                                                                       requirements (04 1616 9858)
                                                                                                                                                                                                                     drawn              ps                                       DESIGNERS                                                                                       46 ‐ 48 Elizabeth Street
                                                                                                                                                                                                                                                                                                                                                                                 Noosaville QLD 4566
               www.seedlandscapes.com.au                               ©       2016 SEED Landscapes                                                                                                                                                                                                                                                                              ISSUE
Document Set ID: 21024968
                        abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
                                                                       all rights reserved. the information contained in the document is copyright
                                                                       and cannot be reproduced or copied by any means without
                                                                       the written permission of seed landscapes.
                                                                                                                                                                                                                                                                                                                                                                                 28/10/18
                                                                                                                                                                                                                                                                                                                                                                                                 B

Page 5

                                                                                                                                                                                                                                                      -
     1:200@ A3
                                                                                                                                                                                                                                          NOOSA COUNCIL                                        LANDSCAPE PLAN
                                                                                                                                                                                                                                                                                                     Scale 1:200 @ A3
     0 5 10 20          50                     100                                                                                                                                                                                        APPROVED PLAN
                                                                                                                                                                                                                Elizabeth Street        OPW19/0278 8 JAN 2020
                                  06      TURFED AREA:
                                  04      Install A-Grade Green Couch Turf over
                                          100mm topsoil to council verge
                                                                                                                                                                                                                                                                        CONCRETE DRIVEWAY:
                                         EXISTING TREES:                                                                                                                                                                                                                Standard entry driveway, Standard BCC
                                         Protect and retain existing trees as per                                                                                                                                                                                       crossover; all necessary council
                                         BCC Guidelines and AS4970                                                                                                                                                                                                      approvals to be in place prior to
                                  01     TREE PLANTING:                                                                                                                                                                                                                 constructing driveway or crossover
                                  04     Shade trees with non-invasive root
                                         systems to maintain privacy and aid in                                                                                                                                                                                         SCREEN PLANTING:                      03
                                         sustainable building practices                                                                                                                                                                                                 Shrubs and trees to screen fence      04
                                                                                                                                                                                                                                                                        and provide privacy from street and
                                  02      CLIMBING PLANTING:                                                                                                                                                                                                            develop visually interesting frontage
                                  04      Climbing vine to narrow garden bed to
                                                                                                                                                                                                                                                                        GARDEN EDGING:                     07
                                          grow over fence and reduce visual impact
                                                                                                                                                                                                                                                                        Concrete edging to separate garden 04
                                                                                                                                                                                                                                                                        and turfed areas
                                          HARDSTAND AREA:
                                          Extended precast concrete pavers or                                                                                                                                                                                           TURFED AREA:                       06
                                                                                                                                                                                                                                                                        Install A-Grade Green Couch Turf   04
                                          concrete slab of decking around pool to
                                          accommodate pool fencing and extend                                                                                                                                                                                           over 100mm topsoil to private open
                                          recreation space for residents                                                                                                                                                                                                space
                                          enjoyment

                                  03
                                  04
                                          SCREEN PLANTING:
                                          Shrubs and trees to screen fence and                                                                                 U1
                                          provide privacy from neighbours
                                                                                                                                                                                                                                        U2                              SCREEN PLANTING:
                                                                                                                                                                                                                                                                        Shrubs and trees to screen fence
                                                                                                                                                                                                                                                                        and provide privacy from
                                                                                                                                                                                                                                                                        neighbours
                                                                                                                                                                                                                                                                                                                03
                                                                                                                                                                                                                                                                                                                04




                                                                                                                                                                                                                                                                        ORGANIC MULCH:                        04
                                                                                                                                                                                                                                                                        75mm deep organic Hoop Pine (no 04
                                                                                                                                                                                                                                                                        fines) mulch to all garden beds unless
                                                                                                                                                                                                                                                                        otherwise stated


                                                                02            GARDEN PLANTING:
                                                                04            Native local species planting for                                                                                                                                                         GARDEN PLANTING:                      02
                                                                              environmental responsible practice,                                                                                                                                                       Small groundcovers in gap between 04
                                                                              300mm cultivated garden soil to beds                                                                                                                                                      concrete slabs to soften visual impact


                                                                              HARDSTAND AREA:
                                                                              Precast concrete pavers or concrete slab
                                                                                                                                                                                      U4                                                                                ORGANIC MULCH:
                                                                                                                                                                                                                                                                        75mm deep organic Hoop Pine (no 04
                                                                                                                                                                                                                                                                        fines) mulch to untility area to allow
                                                                                                                                                                                                                                                                                                               04


     DRAINAGE:
     All paths and garden beds to fall
     away from proposed building and
     excess storm water to be collected
                                                                06
                                                                              to extend passive recreational area for
                                                                              resident

                                                                              TURFED AREA:
                                                                                                                                                                                                                                        U3                              access and 'soft' edge for planting
                                                                                                                                                                                                                                                                        HARDSTAND AREA:
                                                                                                                                                                                                                                                                        Extended precast concrete pavers or
     in stormwater pits where available                                                                                                                                                                                                                                 concrete slab of decking around pool to
                                                                04            Install A-Grade Green Couch Turf over                                                                                                                                                     accommodate pool fencing and extend
     IRRIGATION:                                                              100mm topsoil to council verge                                                                                                                                                            recreation space for residents
     Drip line irrigation system to be fully                                                                                                                                                                                                                            enjoyment
     automated to cover all garden areas;                                     POOL FENCING:
     Spray irrigation pop-ups in all turf                                     Frameless glass pool fencing and gate to pool                                                                                                                                             TURFED AREA:                       06
                                                                              zone; fencing must comply to local council                                                                                                                                                Install A-Grade Green Couch Turf   04
     SOIL CONDITIONER:                                                        and Australian Standards codes                                                                                                                                                            over 100mm topsoil to private open
     ECO Hydro Terraplex (source from                                         POOL:                                                                                                                                                                                     space
     Eco-environment) conditioner to all                                      Pool and pool position by architect; refer to
     garden beds; refer to manufacturers                                      architects details                                                                                                                                                                        POOL:
     specifications                                                                                                                                                                                                                                                     Pool and pool position by architect;
                                                                04            SANDSTONE GRAVEL MULCH:                                                                                                                                                                   refer to architects details
                                                                04            70-140mm tumbled Sandstone River rock
                                                                              gravel mulch in all pool area planting                                                                                                                                                    DRYING AREA:




 seed
                                                                              zone                                                                                                                                                                                      Fence mounted clotheslines to drying
                                                                                                                                                                                                                                                                        area; refer to manufacturer's detail




                                                     NOTES                                                                                                                            DRAWING                                CLIENT          LEGEND                                             PROJECT
           landscape design                                                                                                          Attn: Developer/Builder
                                                     Use figured dimensions in preference to scaled.

                                                     Notify the Landscape Designer before proceeding if any anomaly is found
                                                     between this drawing and conditions on site.
                                                                                                                                     Landscape Compliance Certification may be
                                                                                                                                     necessary at BA Stage of development.
                                                                                                                                     Please contact Landscape Designer for Detailed
                                                                                                                                                                                      landscape plan                        KIDD + Co            proposed tree
                                                                                                                                                                                                                                                 existing tree
                                                                                                                                                                                                                                                                        driveway
                                                                                                                                                                                                                                                                        pedestrian path
                                                                                                                                                                                                                                                                                                160614
                                                                                                                                                                                      drawing no.   160614 02
          t 07 3217 6491 m04 1616 9858
          po box 527 paddington qld 4064
                                                     Details not certified for construction. Contractor responsible for structural
                                                     engineering certifications,hydraulic certifications & building approvals.
                                                     Levels taken from information provided from the Client's site setout plan.
                                                     Confirm all finished levels on site prior to excavation.
                                                                                                                                     Landscape Design to complete approval package
                                                                                                                                     requirements (04 1616 9858)
                                                                                                                                                                                      drawn         ps                      DESIGNERS            groundcovers/grasses   paved area
                                                                                                                                                                                                                                                                                                46 ‐ 48 Elizabeth Street
                                                                                                                                                                                                                                                                                                Noosaville QLD 4566
             www.seedlandscapes.com.au                                                                                                                                                north                                                      proposed shrubs
                                                                                                                                                                                                                                                                                                ISSUE
                                                                                                                                                                                                    '




                                                     ©       2016 SEED Landscapes


Document Set ID: 21024968
                        abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
                                                     all rights reserved. the information contained in the document is copyright
                                                     and cannot be reproduced or copied by any means without
                                                     the written permission of seed landscapes.
                                                                                                                                                                                                                                                 turfed areas                                   28/10/18
                                                                                                                                                                                                                                                                                                                B

Page 6

                                                                                                                                                                                                                                                           -
     1:200@ A3                                                                                                                                                                                                                                                                                             PLANTING PLAN
                                                                                                                                                                                                                                               NOOSA COUNCIL                                                  Scale 1:200 @ A3
     0 5 10 20         50                    100
                                                                                                                                                                                                                                               APPROVED PLAN
                                                                                                                                                                                                               Elizabeth Street              OPW19/0278 8 JAN 2020

                                                                 3 BAN eri
                                                                                                                                                                                                                                                                                             3 BAN spi
                                                                 3 BAN spi                                                                                                                                                                                                   5 LOM lon
                                                                                             3 HIB spl                                                                                                                                                                                       5 BAN eri
                                                                                                                                                                                                                                                                                             2 HIB div
                                                               3 COR rub                                                                                                                                                                                                     5 ALP cae
                                                                                            3 HIB div
                                                               1 BAN rob                   1 MEL qui                                                                                                               5 CAR app                                                                 2 BAN spi
                                                               3 WES fru                                                                                                                                                                                                                     5 WES fru
                                                                3 SYZ aus
                                                                                                                                                                                                                  3 PAN tec                                                  2 ARC cun
                                                                                                                                                                                                                   3 PAN tec
                                                                                                                                                                                                                  6 LEP art                                                                  6 SYZ HG
                                                                                            3 ALP cae                                                                                                             1 ARC cun
                                                                  6 SYZ HG                                                                                                                                        1 ARC cun
                                                                                             4 HIB spl                                                                                                             7 CAR app                                                                 4 WES fru
                                                                  2 BAC cit                                                                                                                                       10 LEP art
                                                                                                                                                                                                                                                                                             4 WES fru
                                                                                                                                                                                                                   12 LEP art                                                                6 SYZ aus
                                                                                                                                                                                                                   3 ARC cun

                                                                                                                                                                                                                                                                             1 STE sin
                                                                                            3 ALP cae                                                                                                                                                                        6 LEP art
                                                                                                                                                                                                                                                                             6 ALP cae


                                                                                                                                                              U1
                                                                  4 SYZ HG
                                                                                          2 COR rub
                                                                4 WES fru


                                                                                                                                                                                                                                             U2
                                                                                         26 DIA cae
                                                                                          2 MEL ell                                                                                                                                                                          7 COR rub
                                                                                                                                                                                                                                                                             15 LEP art
                                                                                                                                                                                                                                                                             3 ALO bri
                                                                                          3 LIN mon                                                                                                                 2 PAN tec
                                                                                           4 HIB sca                                                                                                                                                                         6 ALP cae
                                                                                          3 LIN mon
                                                                 4 SYZ aus                                                                                                                                                                                                                   4 WES fru
                                                                                          9 ALP cae
                                                                 6 WES fru                                                                                                                                                                                                                   6 SYZ HG
                                                                 5 WES fru                                                                                                                                                                                                   1 ARC cun
                                                                                           3 LOP con                                                                                                                 4 ALO bri
                                                                                            6 SYZ HG                                                                                                                                                                         10 COR rub
                                                                                                                                   9 ALP cae                                                                       3 CRI ped
                                                                                                                                   14 LEP art                                                                                                                                                3 WES fru
                                                                                                               5 SYZ aus                                                                                                                                                     2 MEL ell
                                                                                                                                    4 VIO ban
                                                                                                                                    5 ALP cae
                                                                                                                                                                                                                                                                             18 CAR app



                                                                                                                                                                                     U4
                                                                                                                                     1 MEL ell                                                                                                                                               6 SYZ HG

                                                                                                                                                                                                                                                                             1 ARC cun



                                                                                                               1 SYZ aus
                                                                                                                                                                                                                                             U3                              8 VIO ban

                                                                                                                                                                                                                                                                                             5 COR rub
                                                                                                             6 COR rub                                                                                                                                                                       1 SYZ aus
                                                                                                                                    1 ARC cun
                                                                                                                                                                                                                                                                                             5 WES fru
                                                                                                                                                                                                                                                                             25 CAR app
                                                                                                                                                                                                                                                                             1 MEL qui

                                                                                                               4 SYZ HG

                                                                                                                                    5 ALP cae
                                                                                                                                     1 STE sin
                                                                                                               6 SYZ aus                                                                                                                                                                     6 SYZ aus
                                                                                                                                    6 COR rub                                                                                                                                1 STE sin
                                                                                                             1 LOP con
                                                                                                             4 WES fru                                                                                                                                                                      4 WES fru
                                                                                                                                    2 ARC cun                                                                                                                                               4 BAC cit




 seed
                                                                                                                                                                                                                                                                             1 ARC cun
                                                                                                                                   30 CRI ped                                                                                                                                               5 SYZ HG
                                                                                                               4 SYZ aus                                                                                                                                                                    6 SYZ aus
                                                                                                               4 BAC cit
                                                                                                                                   10 LOM lon


                                                   NOTES                                                                                                                             DRAWING                                     CLIENT           LEGEND                                                 PROJECT
           landscape design                                                                                                         Attn: Developer/Builder
                                                   Use figured dimensions in preference to scaled.

                                                   Notify the Landscape Designer before proceeding if any anomaly is found
                                                   between this drawing and conditions on site.
                                                                                                                                    Landscape Compliance Certification may be
                                                                                                                                    necessary at BA Stage of development.
                                                                                                                                    Please contact Landscape Designer for Detailed
                                                                                                                                                                                     planting plan                               KIDD + Co            proposed tree
                                                                                                                                                                                                                                                      existing tree
                                                                                                                                                                                                                                                                                 driveway
                                                                                                                                                                                                                                                                                pedestrian path
                                                                                                                                                                                                                                                                                                         160614
                                                                                                                                                                                     drawing no.   160614 03
          t 07 3217 6491 m04 1616 9858
          po box 527 paddington qld 4064
                                                   Details not certified for construction. Contractor responsible for structural
                                                   engineering certifications,hydraulic certifications & building approvals.
                                                   Levels taken from information provided from the Client's site setout plan.
                                                   Confirm all finished levels on site prior to excavation.
                                                                                                                                    Landscape Design to complete approval package
                                                                                                                                    requirements (04 1616 9858)
                                                                                                                                                                                     drawn         ps                            DESIGNERS            groundcovers/grasses      paved area
                                                                                                                                                                                                                                                                                                         46 ‐ 48 Elizabeth Street
                                                                                                                                                                                                                                                                                                         Noosaville QLD 4566
             www.seedlandscapes.com.au                                                                                                                                               north                                                            proposed shrubs
                                                                                                                                                                                                                                                                                                         ISSUE
                                                                                                                                                                                                   '




                                                   ©       2016 SEED Landscapes


Document Set ID: 21024968
                        abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
                                                   all rights reserved. the information contained in the document is copyright
                                                   and cannot be reproduced or copied by any means without
                                                   the written permission of seed landscapes.
                                                                                                                                                                                                                                                      turfed areas                                       28/10/18
                                                                                                                                                                                                                                                                                                                         B

Page 7

                               -                                                                                                                                                                                                                                                   LANDSCAPE DETAILS
       NOOSA COUNCIL
       APPROVED PLAN
     OPW19/0278 8 JAN 2020
                                                                                                                                            Provide depression
                                                                                                                                            in mulch at base
                                                                                                                                            of plant
                                                                                                                                        Provide depression
                                                                                                                                        in mulch at base of
                                                                                                                                        plant
                                                                                                                                           75mm Mulch
                                                                                                                                        75mm Mulch




             Stake and tie single
             stemmed stock with
             appropriate materials                                                                                                                                                      SUBGRADE


             Excavate hole                                                                                                                   100mm cultivated                        Excavate hole 200mm wider &
             1000mm wide                                                                                                                     subgrade                                deeper than pot size and backfill
                                                                                                                                                                                     with imported topsoil
             and 1000mm
             deep, backfill                                                                                                        03       SHRUB PLANTING DETAIL
             hole with                                                                                                             04       Scale 1:25 @A3
             modified site
             topsoil                                                                                                                                                                                                             100mm mulch layer
                                                                                                                                                                     75mm mulch layer
                                                                                                                                                                                                                                 300mm deep modified
                                                                                                                                                                     300mm deep modified                                         site soil except where
             4 x 10g slow                                                                                                                                            site soil except where
             release                                                                                                                                                                                                             tree plantings occur
                                                                                                                                                                     tree plantings occur
             fertilizer tablets                                                                                                                                        Cultivate subgrade to
                                                                                                                                                                                                                                     Cultivate subgrade to
             Install root                                                                                                                                             100mm depth.                                                  100mm depth.
             barrier to
             900mm
             deep
             Cultivate soil at
             base of hole to
             100mm depth                        SUBGRADE

        01        TREE PLANTING DETAIL                                                                                             04       ORGANIC MULCH DETAIL                                        05     GRAVEL MULCH DETAIL
        04        Scale 1:25 @A3                                                                                                   04       Scale 1:25 @A3                                              04     Scale 1:25 @A3



         Provide depression
         in mulch at base of
         plant                                             75mm
                                                           Mulch

                                                                                                                                                                                                                                           MULCH: Refer to
                                                                                                                                                                                                                                           Specification.
                                                                                                                                                                                                                                           CONCRETE MOWING STRIP:
                                                                                                                                                                                                                                           Continuous extruded mowing strip.
                                                                                                                                                                                                                                           Profile as indicated below and refer
                                                                                                                                                                                                                                           to drawings.

                                                                                                                                                     TURF: A-Grade turf                                                                    TOPSOIL:Refer to Specification
                                               SUBGRADE                                                                                             IMPORTED SOIL:                                                                         CULTIVATED SUBGRADE:Refer to
                                                                                                                                                    100mm depth bedding course                                                             Specification.
                  100mm                       Excavate hole 200mm wider                                                                              CULTIVATED SUBGRADE:                                                                  COMPACTED SUBGRADE:Min.
                                              & deeper than pot size and                                                                            100mm min depth cultivated                                    SUBGRADE
                  cultivated                                                                                                                         sub-grade                                                                             150mm thickness.
                  subgrade                    backfill with imported topsoil
                                                                                                                                                                                                                                           NOTES
        02        MASS PLANTING DETAIL                                                                                                                                                                                                     1. CONSTRUCTION JOINTS:Place at
        04        Scale 1:25 @A3                                                                                                                                                                                                           minimum 5m centres.
                                                                                                                                                                                                                                           2. TOOL JOINTS:Make tool joint at
                                                                                                                                                                                                                                           equal distances from both ends.




  seed
                                                                                                                                                         SUBGRADE                                                                          Make joint at points of change in
                                                                                                                                                                                                                                           curvature/ direction. Joints to be at
                                                                                                                                   05      TURF DETAIL                                                  07     CONCRETE EDGE DETAIL
                                                                                                                                   04      Scale 1:25 @A3                                               04     Scale 1:25 @A3



                                                   NOTES                                                                                                                                  DRAWING                                      CLIENT                                        PROJECT
             landscape design                      Use figured dimensions in preference to scaled.

                                                   Notify the Landscape Designer before proceeding if any anomaly is found
                                                   between this drawing and conditions on site.
                                                                                                                                    Attn: Developer/Builder
                                                                                                                                    Landscape Compliance Certification may be
                                                                                                                                    necessary at BA Stage of development.
                                                                                                                                                                                          details                                      KIDD + Co                                     160614
                                                                                                                                    Please contact Landscape Designer for Detailed        drawing no.        160614 04
             t 07 3217 6491 m04 1616 9858
             po box 527 paddington qld 4064
                                                   Details not certified for construction. Contractor responsible for structural
                                                   engineering certifications,hydraulic certifications & building approvals.
                                                   Levels taken from information provided from the Client's site setout plan.
                                                   Confirm all finished levels on site prior to excavation.
                                                                                                                                    Landscape Design to complete approval package
                                                                                                                                    requirements (04 1616 9858)
                                                                                                                                                                                          drawn              ps
                                                                                                                                                                                                                                       DESIGNERS                                     46 ‐ 48 Elizabeth Street
                                                                                                                                                                                                                                                                                     Noosaville QLD 4566
                www.seedlandscapes.com.au          ©       2016 SEED Landscapes                                                                                                                                                                                                      ISSUE
Document Set ID: 21024968abn 85 468 007 510
                                                   all rights reserved. the information contained in the document is copyright
                                                   and cannot be reproduced or copied by any means without
                                                   the written permission of seed landscapes.
                                                                                                                                                                                                                                                                                     28/10/18
                                                                                                                                                                                                                                                                                                     B
Version: 1, Version Date: 11/12/2019

Used in these records

About this file

File size
6.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW19-0278.01 pdf.pdf · 6.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.