NOOSA COUNCIL
APPROVED PLAN
OPW19/0278.01 16 APR 2020
[OCR of page images]
DRAWING SIZE - AT
\ LOTS 2 & 3 ON RP 78252
i] ie dt st
NOOSA COUNCIL
APPROVED PLAN
OPW19/0278.01 16 APR 2020
Level Origin PM 56277, RL 1635m
8
|
|
PROVDE ADDTONAL 3/N16
BARS 2 ASO.) N TCP OF
FETANING WALL FOOTNG FOR
SEWER PROTECTON
Tae = 3 .
REFER ORG OWA FOR 5 I 7
‘SEWER PROTECTION /
DEALS, a , Mon
oe
UNDSORPG WLS _
AGENT REPOS ~~
OREN ERED
NNN !
“ype 1 alge EAN “Sram APPROX. FILLI VOLUME 1495m 2
(a Sion 10 Now i
Nm FSET 1D ~ 4g wog soe
a
° Str 1% ee :
» I. -
' be i
t eS =
NAA AAA AY Al ¥ .
‘l T ze
— el | e BA
ings iy FUL=-01.2m =
i g &
Ig
Lol
I
a 1 FILL-0.9m cP.
es smone 5 x00 | 4 aemeage je Tsogn~ ~~~ ~~~ _ ew nper--—¢ ----— re
EI ade LS | See hee eS “ RP! BOUNDARY —
BEEP aloe cnc mn —
1k or rere Woe SEVER PROTECTON
fs ova nop -— A. | wen ee aenats| ‘
oie one ben ne S Et oe .
(Rub seep sera N. |
Jerome ronmen S
CML TEM NE emus soe
1
CAICAL DEPT Eien osm apne ous SITE PLAN — EARTHWORKS & RW SETOUT
pa ast ‘Seale 1: 200
RAID naccem onan
{Gao foe umn ota
LEGEND
TINE wanine 0e W NCEONE
SOFRACTR 7m GENTE aL SEREES FAR TO | He QUEENSLAND AL OF ONFOR &
TO BE PROTECTED IN ACCORDANCE WITH THE TRAFFIC CONTROL DEWCES & AS 2890.1 # EXISTING SURFACE SPOT LEVELS.
SOY RSE SNE fate Soe rojas ova ECE
‘SUPPLY LINE
INDICATES EMISTING SEWER LINE
INDICATES PROPOSED SEWER LINE
INDICATES TELSTRA LNE APPROX
ALIGNVENT, BULDER TO CONF
EXACT LOCATON PRIOR TO WORKS
wee tetacer wrx CATES EXSTNG STORER
DRAIN
DIAL 1100
BEFORE YOU DIG
CS
Fil-1.8m
INDICATES DEPT OF CUT OR FILL
AS NOTED
REVB
a
(
¢
se
?
(
?
t
VAN ~yY
)
RP. BOUNDARY
ni2 10?
1 FULED LOT
| GROUND LEVEL
190 BLOCK - CORE
FILLED NI2—400 V &e He
~ LAP BARS SOOM,
—
ANE woRES.
BEFORE. POUR
Gieat-cst 0, ane
ROUND LEVEL
ADDITONAL 3/16
450 (L) WHERE
PROVIDE FULL HT.
MOVEMENT JONNTS AT
80M CTRS,
med
200MM FREE DRAINING
BACKFILL WITH AGI PIPE
NomeD oW PLAN J 70 OUTET.
a2 150 TAK HEEL S182
T 5 WESH TOP 40° COVER
1500 -
¥ SLITTW TOP & BOTTOM
6 UGS AT 900 CTRS
BLOCK RETAINING WALL - TYPE 1
TYPICAL SECTION
1
‘SPOON DRAIN OR SMUIAR
[ TO RE-DIVERT STORMWATER,
CEOFABRIC OR SIMIAR FOR
SLT/ANES RETAENSION
1
VERTICAL MEMBERS AS PER |
TABLE, 1200 CTRS. RAKE
BACK AT ANGLE SHOWN,
‘200%50 HORIZONTALS
For DEPTHS UP TO 1600
BEYOND USE 200X75. ‘200X400MM FREE DRAINING
BACKFILL IN CEOFABRIC
<}——— WRAPPING WH AGI PIPE TO
OUTET.
GRADE CONCRETE. AWAY
FROM POSTS.
‘He REAEAINED
(GROUND LEVEL
20NPA COMPACTED
CONCRETE,
BERR ARSSBEEIND.
LEEPER RETAINING WALL — TYPE 1 ALTERATIVE
TYPICAL SECTION
“H RETAINED | VERTICAL MEMBER | FOOTING DEPTH
(0x8)
600, 200 x 75 400,
300 TO x WO
1200 700 x 100 1200
1600. 700 x 200 1500
7000 2/25 x 200 | Ta00
_—,-
pate
VERTICAL
WEWBER
Cum? —* Smt
‘CONSTRUCTION NOTES.
5 Se SNES RE To COURED OW HTC,
OSRDWCKS ENE ESE ORG MO TE AATEC.
SNE Gr 6 APO or caTNG AL STG SS
fs AOC ME ATED CRT PT NE
FODPARS wo OREN
\ ng en os ork on.
2 OMENS MRE WOT OEED FOR COMING EES
5 Gate amen 1 sn BX BEAN A ASD
pennors ce stare
ACES FONT FRUTED FR EACH LOTION,
FoR RED BNE, WAIUA GOS APY TO
une
ML Saves 108 CAD A PRTED A ROARED FIR TD
FILLING NOTES:
ESTE 5 10 BE SORMPED CLEAR OF AL ORIN MATERAL NO
es
~ THE SUBGRE IS TO BE ROUED WH A VBRATIG STEEL OL
RULER TO ACHENE A MNMAY SLATE FELD CENI OF S58 THE
CEIMPACTEN 1 TD BE SUCENT TD ACHE A LOW CUNT OF 7
LOS PER Soon WH AN APROVD PERTH SAND FENEROVETER
FRA DEPTH OF 10m BELOW EXCAVATED LEAL OPES OF
CGMPACTEN TEST RESULTS SHALE PRESENTED To St CONSULTING
ENGREES FR APPROVAL
— THE FL MATRA. CLEA CRANUAR MATRAL (ESO TD A
CUAEY SiO ACURDANCE Wi ASY728) BE FREE OF mY
(FGANG WATERAL AO HAVE A CLAY CENTENT OF LESS THAN 2
(PUTTY NOE ESS THAN 75% UNEAR SARNIA OF 158. THE
PROPOSED MATERA TO BE NSPECTED BY 5c COSULTNG
NENEERS PRIOR TDS REMIVAL TO EXE TS COWPATHALTY.
= THE LB TOBE PLACED AMD COMPACT W ACCORDANCE WT
{SS7RG-1W96 TD A LEEL SUFCENT TO ACHEKE& LEVEL 1
CERTREATIN WT A MMMM FELATVE PED OENSITY OF 5,
CORES OF COMPACTN TST RESULTS SHALL BE PRESEN TD Soc
CINSLING ENGNEERS FOR APPROVAL
= FLMG AND COMPACTING ADACENT ESN STRUCTRE 510
1 STRCT A0toROANE WT THE ASOOMTED OETALS ND
SPEOFCATONS.
= MEAS WHEE EUSTNG SUTURES 08 TEES ARE REMOKD SLL
Be BACIFLED WI THE APPROD FL MATERA. COMPACTED
ACCORDANCE WT ASZATO-I996 TO AGHEVE A MRM RELATVE
FAL DENSITY oF ss
= ANT LOOSE OR SOFT WATERAL WNOOERED THE STE
PREPAKTIN SAIL BE REMDIED AND REPLACED WTH THE APROKED
FL AMTERMLCOMPACED WM AOGERDANE WT ASZETO-I896 TO
[AEE A MAMA RELATE FLD DENSITY OF 85
= ST ORANGE AND SLT PROTECTION MEASURES MUST BE ISTLED
PORTO CONSTRICTON CAENCNG.
ce eee oF
WET ENSTNG STORMWATER MANHOLE/PT
STNG SENER CONNECTION PONT
EAFORCED CONCRETE HEADWALL
ESTING SEVER MANHOLE
EISTNG STORMWATER MANHOLE
NEM 1050 STORMWATER MANHOLE
OB, BNSTNG EDGE OF BTUMEN
KC ENSTNG KERB & CHANNEL
NSL” NATURAL SURFACE LEVEL
FH ARE HYDRANT
TP EASA PIT
EP, ELECTRICAL POWER POLE
ERB —EASTNG KERBING
Femi | Deron te
FOR APPROVAL
D0 NOT SCALE FROM THIS DRAWN
a te cd eid
irra rome rare
OC) st ==
"OPERATIONAL WORKS:
EARTHWORKS & RW DETAILS
“Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
OMe Wow 16 Dawn OK.
1280.8 25] FSS, ¥ lo62e- ows | C.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
-
NOOSA COUNCIL
APPROVED PLAN
OPW19/0278.01 16 APR 2020
[OCR of page images]
DRAWING SIZE - AT
NOOSA COUNCIL
APPROVED PLAN
OPW19/0278.01 16 APR 2020
| tors 2 & 3 on aP ease
tev Oot AND
# Level Origin PM 86277, RL. 1635
DRIVEWAY SLAB
125mm THK
SLB2 MESH.
50mm TOP COVER
WET TOOLED
oo ONT,
LOWER SLAB MESH TO MAINTAN
40rvm TOP COVER CUT EVERY SECOND
\WRE SOmm CLEAR ALONG LINE OF
JONT
TJ) TOOLED JOINT DETAIL
16 DOWELS,
800 CTRS, 125 THICK
1340) connor
(0) /508,
KEY JOINT PROFLE.
‘STOP MESH 50mm
FROM JOINT,
Kd) DANLEY KEY JOINT DETAIL
YN TAMER,
Str COVER.
PIT TRIMMER DETAIL FOR PITS
wwrw.dialbeforeyoudig.com.au
DIAL1100
BEFORE YOU DIG
HATCHING INDICATES PROPOSED
INTER-ALOTMENT DRAINAGE,
ENSURE SMOOTH TRANSITION FROM
NEW FOOTPATH 70 NEW DRIVEWAY
EDGE, NO STEP. TYPICAL.
DEWEY CROSSOVERS N ACCORDANCE WH
PEA ST ORG
060 AND CONCI
NEW CONCRETE. 125 FOOTPATH /PAVED
AREAS SHOWN SHADED TO COUNCIL
STANDARDS (IPWEA rg SEO R065),
MAX TOOL ONT SPACINGS AT 20m
CRS, REFER LANDSCAPE ARCHITECTS
PLAN FOR SURFACE. TREATMENTS.
AX CROSSFALL GRADE OF 1 IN 40.
EXISTING CROSSOVER. REINSTATE
KERB TO COUNCIL STADNARDS.
EXISTING CROSSOVER. REINSTATE NOON
KERB TO COUNCIL STADNARDS. \
~ Ga, (KERB » ta a.
— : a= :——
« { THEW 2m (W) CONCRETE FOOTPATH wt EZ (9) ENGR PPA .
_ =P BY tk) a
~~ fa oe Te 1 We
I
rs) 7
ty
RP. BOUNDARY
ID eat HATCHING INDICATES PROPOSED
f ‘0m WDE EASEMENT FOR
! INTER-ALOTMENT DRAINACE.
a)
\
if 2
— UNIT 2 [4
FFL 270 '
F
JI™
UNIT 3
FFL 270
RP. BOUND "—
“10m WDE EASEMENT FOR
SITE PLAN — DRIVEWAY & ACCESS
Sede T 200
"ALL UNE WARKNG 10 BE W ACCORDANCE
INTHE QUEENSLAND MANUAL OF UNIFCR
"RAFFc CONTROL EMCES AS. 2901
PARKING FACLTIES PART 1: OFF-STREET CAR
CONTRACTOR TD LOCATE AL SERMCES PRR TO
COMMENGNG HORKS ON SE. AL SERVES ARE
10 BE PROTECTED I ACCORDANCE WIM TE
AUTHORITY REPONSELE FOR THE SERVICE
a
{GENERAL NOTES
Den
DETERMINED
ON-SITE
PAVEMENT MATERIALS
125mm N25 CONCRETE PAVEMENT, SLB2 MESH MIDDLE
100 THK COMPACTED BASE COURSE SAND OR CRUSHER DUST
~SUB-GRADE PREPERATION IN ACCORDANCE. WITH
SPECIFICATIONS /NOTES.
DRIVEWAY CARPARK PAVEMENT SECTION
* SUBGRADE PREPERATION, REFER
(ts)
(ks)
LEGEND
INDICATES EXISTING SURFACE
CONTOUR AND LEVEL TO AHD.
EXISTING SURFACE SPOT LEVELS.
INDICATES PROPOSED FINISHED
SURFACE LEVELS
INDIGATES DIRECTION OF FALL
TO FINSHED SURFACES.
125 THK. DRIVEWAY SLAB ON
COMPACTED MATERIAL, SLE MESH,
TOP 50 COVER, FLEXIBLE JONT
[AGAINST MASONRY /CONCRETE.
100 THK. TERRACE SLAB ON
CCOMPACTED WATERIAL, SL72 MESH,
TOP 40 COVER, 200(M) x 200(0)
EDGE_THCKENNG AT UNSUPPORTED
EDGES. FLEXIBLE uONT AGANST
ASONRY /CONCRETE.
DENOTES WET TOOLED JONT TO
TERRACE SLAB, REFER TO DETALS
DENOTES FORMED KEY JOINT 10
DRIVEWAY SLAB, DETAIL TO DETAILS
INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTNG SEWER UNE
INDICATES WATER MAIN. APPROX
‘AUGNWENT, BULDER TO CONFRM
EXACT LOCATION PRIOR TO WORKS.
INDICATES TELSTRA LINE APPROX
‘AUGNWENT, BUILDER TO CONFRM
EXACT LOCATION PRIOR TO WORKS:
INDICATES STORMWATER DRAIN
PROPOSED AS NOTED MIN 1 IN
100 FALL UNLESS NOTED
OTHERWISE
—_ INDICATES STORMWATER DRAIN
EXISTING AS NOTED MIN 1 100
FALL UNLESS NOTED OTHERWSE
Gomi? —t _fmt:100 @ at
1:200 @ AS
Sa Fs a.
2 AL'SUERENS W MIERES
AacHTERA AMS
Aiea cs To AEH HE BONER
SUE SUE & SPOOL oe LoATG AL. STAG
Snes HN ND GMT HE MOMENT Mo SVL ASE
THATAL NW oi EM ACEROANCE MH TE ATED
FORTS 0 OREN
ST EOS 0B SA OTF
2 Bones MET SSS FO MC OS
5 OOGRE URE 1o a 2 He BNE
NGA MENNENTS SIP
i urea ite 98 AED CML SUB
oon
JtPasen OS 10 nm WOE WET ToD WH EY
Bo west wR CT aun Jom
ve sets Fa FETTID Fo a WEN
3 or Are cm CS TE
al seis 20 wo OTE 1S RD
oR TWO COE
roRAULCS
| mu sr Som we cuca a RRB
ECM RAN FR LOCATING OFF
AL Sir natWUS M0 WE RETIN MT THe
‘lone stone ro Acre WH ASN.
Hage UREOETOC AFTER OFC AL NEES POTS
{CHE CONTACT To NTE POSTON LL STAG
‘Saenz 16 NOENED OUTESE MD SINE FUNG PRO TO
2DRCP HE RNC SIND PPE AS MID LD AT ANAM
Gia oT IGTUAD ve DCTS
Aeron WI HE NARACRES REUREENS
ine
7. ANTE SLY PERI BON GAD 1 0;
aa ne use Ho SY He 2
is a PLETE
‘eo coe
WER SES oT PETE RD LBS 0 AL
{ENS WO ODWEENONG SUL BE WE ARNE RE
Scemgoce MT ASEH,
1 Os, NPT OPS WO QOBKE Cs TUNED
‘HAIR oF PESMUM PARENTS ARE 10 ITED WH ETHER
WET ENSTNG STORMWATER MANHOLE/PT
STNG SENER CONNECTION PONT
EAFORCED CONCRETE HEADWALL
ESTING SEVER MANHOLE
EISTNG STORMWATER MANHOLE
NEM 1050 STORMWATER MANHOLE
ISIN EDGE OF BTUMEN
ESTING KERB. & CHANEL
NATURAL SURFACE EVEL
FH ARE HYDRANT
TP EASA PIT
EP, ELECTRICAL POWER POLE
Ge HA
Shiv ore ia ues freer
+ [SREP RE SF orm
SS a
a
FOR APPROVAL
00 NOT SCALE FROM THIS DRAWING
Epcpsursre
> esuaueaas
“OPERATIONAL WORKS:
DRIVEWAY & ACCESS
“Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
ste Nov 16 Dawn 0K
raze, ¢{|oeze1-owe| ©
Page 3
-
NOOSA COUNCIL
APPROVED PLAN
OPW19/0278.01 16 APR 2020
[OCR of page images]
DRAWING SIZE - AT
NOOSA COUNCIL
APPROVED PLAN
| OPW19/0278.01 16 APR 2020
LOTS 2 & 3 ON RP 78252
Level Datum AH
Level On PM 56277, RL 1L.635m
——
102 souoney
was ice
Fup auwe
S10 RETANNG
wa
‘508 ans De FOL
— ere MT
FECTINGLAR GATE OE
Face aT Low nis
‘ONG REHEORNG Loe
sme ceo LEE.
Fern POPE,
DETAIL ON THS
oe ee 1 00 cae 0 STN TE an
Prov spact IL To MAH DISING GL
icone Pee
THIS SWP PROVIDED AS
DISCHARGE PONT FOR
NEIGHBOURING ALOTMENT
DRAINAGE,
EXISTING HCB's & NEW SW DRAINAGE
LUNE TO BE PROTECTED AS PER
‘SEWER/STORMWATER PROTEC
DETAILS ON ORG 26281-OWi,
u pana
wo
ROOF RUNOFF
ae
§
4”
COUNCIL STORN WATER
SYSTEM
INALTRATION PITS
TREAT FIRST FLUSH RUNOFF FROM ROOF'S
STORAGE AND ONGOING INALTRATION
REDUCES DEVELOPED STIE RUNOFF
WATER,
AUSDRAIN ENVIRONODULE 2
INFILTRATION CELLS. REFER
HATCHING INDICATES PROPOSED
INTER-ALOTNENT DRAINAGE.
A
2/n25xT5x4.0 RHS (GKLV.)
LAD AT 1 in 100 MN
INSTALL TO NEW KERE
ADAPTORS AND MAKE
FOOTPATH GOOD.
se
2/125xT5x4.0 RHS (GALV)
UND AT in 100 MIN
INSTALL TO NEW KERB
ADAPTORS AND MAKE
FOOTPATH GOOD,
LIZABETH STREET
FALL LANDSCAPED AREAS TO
FORMED FLOW PATHS TO ONERT
[— RUNOFF TO GRATED DRAINS AND
SW PITS. 1 in 100 MIN FALL
TYPICAL,
2/125x5x4.0 RUS (GALY.)
SHEET.
52
®
(
?
?
°
?
‘
TION
RP. BOUNDARY
1.0m WIDE EASEMENT FOR
UNIT 2
FFL2A0-— =
j |
e
(1.0m,
UNIT 3 g
mL 270 aE
foes
STORMWATER MANAGEMENT
‘SITE_PLAN
Sede T 200
cm
CEAMENCNG WORK
S
TRACTOR TO LOC
ATE ALL SERMCES
ON STE. AL
ator
0
SERVES ARE
OBE PROTECTED IN ACCORDANCE WT THE
AUERITY RESPCNSBLE FORTHE SERVICE
THES DRANG IS TOBE READ N CONJINCTON
WTA THE STORAWATER WAMAGEVENT REPORT BY
SG CONSULTNG ENGNEERS (a. 2523(S)
ALPES 70 BE LAD AT 1 100 UN
UNLESS NOTED
BEFORE YOU DIG
STORMWATER
INFLOW
RP. BOUNDARY
FALL LANDSCAPED AREAS TO
\__ FORMED FLOW PATHS TO DNERT
RUNOFF TO. SW PITS. 1 in 100
MIN FALL TYPICAL,
AUSDRAIN ENVIROMODULE 2
INFILTRATION CELLS 10 IN LINE,
WRAPPED IN GECFABRIC
rete to00 vPVE
rt
a
oP
AUSORAN ENVIROMODULE 2
INFILTRATION CELLS. REFER
“ DETAL ON THIS SHEET.
HATCHING INDICATES PROPOSED
1.0m WIDE EASENENT FOR
INTER-ALOTMENT DRAINAGE.
LOCATE. STORMWATER PITS:
AAT LOW PONT ON
NEIGHBOURING PROPERTY
REFER TYPICAL DETAIL
Bx so? f
r
los
LEGEND
INDICATES EXISTING SURFACE
CONTOUR AND LEVEL TO AHD.
4° BAISTNG SURFACE SPOT LEVELS.
INDICATES DIRECTION OF FALL
Aly
TO FINSHED SPOON DRANS.
x INDICATES PROPOSED FINISHED
SURFACE LEVELS
60-150 150(W) GRATED DRAIN WITH
HEAVY DUTY GRATE
3
4505q PIPE JUNCTION BOX WITH
BOLTED UD, PRECAST
CONCRETE
450Sq FIELD INLET, PRECAST
CONCRETE WITH RAISED GRATE. FOR
LANDSCAPED AREA DRAINAGE.
5°35 soqsq FIELD LET, PRECAST
CONCRETE WTH RAISED GRATE FOR
LANDSCAPED AREA ORANAGE
S$ sromuwarer vert. neers 10
(MM COLLECT PONONG FROM
NEIGHBORING PROPERTY.
REFER DETAIL
INDICATES PROPOSED STORMWATER,
DRAN EXISTING MIN 1 in 100,
GRADE UNO,
sw.
BP DENOTES APPROXIMATE. DOWNPIPE
LOCATIONS TO BE CONFIRMED BY
ARCHITECT AND HYDRAULIC
DESIGNER,
PROVIDE NSPECTION OPENINGS
STORMWATER OUTLET
‘as STORMWATER
TL T_ _omow
—
x PROVIDE DROPS AT EACH END
Z SJ) oF THE PIT FROM THE MAN
THROUGH DRAIN TO THE
SLOTTED PIPE IN THE BASE
PROVIDE SLOTIED PIPE
THROUGH BOTTON OF
AUSDRAIN INFILTRATION SOAKER PIT DETAIL
ALL PIPE PENETRATIONS THROUGH THE GEOFABRIC TO
BE FITTED WITH STANLESS STEEL PIPE CLAMPS,
GGEOFABRIC TO BE LAPPED AT JOINS WITH A ROOT
INABITOR PROWDED ALONG THE JOIN LINES
Gomi? —t _fmt:100 @ at
1:200 @ AS
1 OT Soe ow ms mam.
{LAL oups Wl
‘moan aM
‘cA NGS HEB RET TOE NER
SUT BLE RSIS For Loa ALL EMG
Sis WTHW 0D KUEN HE ALOMENT 0 SH SE
THATALL Rw mS EW AOROMRCE TTA
gD EAMG, Ee SINR
(NCCE SHPAE LEME #506 OER 308
5 GMERE WS WARNE WT S138 1S 380
6 ROR AOE TS 13, PACED CTA SB
oon,
{PaPvGou 0B Yom WHE WET OUD WH CE
Sh WE OT ANG
oust me
ge es Son Po foe LC} ALON
FO CURED MEWS, WAN GES APL TO MSDE
SALW SO CMPLD Fe REQREMNTS F AUTHORES
ioc ASHEN, FE GTN AL MES PETS ND
renos
{CT CTC 61 CNN HE POSTEN OF AL STNG
eens TO LPG LNG a0 DATA UN GE
ort we,
TAT SPL PERK ON GROND TBE;
fam tu on Ss Ht oT M8
fuss 1 PLT
{CALL ABE GONG AKO WEIL TER SPY FENORE. TO BE
Tec come
A SERCES ENO ERATED W RO SUBS MO AL
OECTINS SL BE WE MME HE SU.
‘re AORN ET HEALED AE To SLED
ACOMDIMCE WI ASIA, HOE RES ET E MSVLED
sca
‘CEN-OTS, MECN PENNS 0 CG CPS STUATD
YEHGLAR oR RES PRESENTS AED EE AD WH THER
AS On OS
TAIL -GOND LES SIAL BE ACGROMCE M ROR
couse Pa
CALL STE PES WO WER SERCES PAERATNG SUBS TBE
(RAPED WN AFRO LSE 7 RT OPP
{He RM SERVE RPE 10 HE NMA EL PE
SET UNS OTD CTC.
KEY
SWPT ENSTING STORMWATER MANHOLE/AT
STNG SEWER COMNECTON PONT
RR
8
Ro. HW
a
SWWH ENSTNG STORNWATER MANHOLE
SWMH NEW 1050 STORUNATER MANHOLE
QB. BASTNG EDGE OF BTUVEN
K & C BUSTING KERB & CHANNEL
NSL’ NATURAL SURFACE LEVEL
FH FRE HYDRANT
1 THSTRAPIT
EP, ELECTRICAL POWER POLE
STNG KERBNG |
BR
a [sw a omen ines samaes [19 /09/0
Seaee aa ash, [evan
Dern
FOR APPROVAL
00 NOT SCALE FROM THIS DRAWING
Os B=
OPERATIONAL. WORKS:
STORMWATER MANAGEMENT
“Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
ste Nov 16 Dawn 0K
PES, { 26281-Sw | €.
Page 4
1.0 GENERAL Unless otherwise specified, reinstate all existing surfaces, Methods of protection shall include but not be limited to Sandy subsoils are preferred for these works. Clay soils 9.0 TURFING LANDSCAPE SPECIFICATION
All works to be performed by a licensed Contractor items, structures and anything disturbed or damaged by the following: may be used when in a dry state, but extreme care is Supply and install A-grade turf (variety specified on
familiar with landscape construction of this nature. The the performance of the works, to its condition at the necessary to ensure the resulting subsoil profiles are not drawings) to areas shown on drawings. Finishing levels
· Construction of temporary surface swales;
Contractor shall verify the location of utilities on site prior commencement of the Contract, other than that forming compacted or subject to excess moisture. should be flush with adjacent surfaces unless otherwise
· Diversion and dispersal of concentrated flows to point
to the commencement of construction, and ensure that part of or directly modified by the new work. detailed. Spread topsoil and grade surface to ensure a
where the water can pass through the site without Supply and install imported topsoil that complies with
they will not have an effect on the works. The Landscape Remove and cart away debris, spoil and surplus building level finished surface, which drains to nominated field
damage; Australian Standards to all turf (100mm) and garden -
Subcontractor is advised to visit the site to satisfy gullies.
NOOSA COUNCIL
materials from the site and buildings, with the exception · Construction and maintenance of silt traps (eg hay (300mm) areas as shown on drawings unless otherwise
themselves as to local conditions, accessibility, storage of those works associated with others prior to practical
bales) to prevent the discharge of scoured materials to specified. Ensure modified site soil is free from stones, Turf to be free from nutgrass or other noxious weeds or
space, the full extent and character of the works and the
APPROVED PLAN
completion. any other material deleterious to plant growth.
downstream areas; sticks, roots, rubbish and material toxic to plant growth.
site, the nature of the ground, the level of the subsoil
· Progressive restoration of disturbed areas; Modified topsoil shall have a friable structure with good Deliver the turf within 24 hours of cutting, and lay it
OPW19/0278 8 JAN 2020
water, the supply of materials and water and the
2.0 EXCAVATION AND EARTHWORKS · Construction of temporary siltation fencing. drainage and high organic content. within 36 hours of cutting. Prevent it from drying out
execution of the contract generally. No claim will be
allowed for any alleged inadequacy of the description Inspect the site and ascertain the nature of excavation Any erosion damage reinstatement or cleanup as a result between cutting and laying.
Fire Ant Control
herein. Should there be any conflict, the Contractor shall required and the working conditions that will be of the contractor not adequately protecting the site,
The Landscape Subcontractor is to allow to carry out all
notify the Landscape designer immediately. encountered prior to the commencement of work. The materials or the works shall be the responsibility of the
necessary measures, inspections and safeguards to ensure 10.0 EDGING
location of topsoil stockpiles, roadway and cut landscape contractor.
Fire Ants do not enter the site via equipment, machinery, Supply and install all edging as per drawings. Paved edging
Figured dimensions shall take precedence over scale embankment profiles and water connection points must
Remove temporary erosion control measures when they materials and plant stock. shall sit on 100mm of concrete. Timber edging must be
measurements and large scale drawings over small scale. be taken into account.
are no longer required. constructed from hardwood and joined using galvanised
Unless otherwise specified the Drawings and Specification The Landscape Subcontractor shall ensure measures to
shall include everything reasonable for the proper and fittings.
minimise erosion and siltation relative to the works EXISTING TREES 6.0 FERTILISER
entire completion of the work, not withstanding any outlined in this specification, including staging of the Protect all existing vegetation unless otherwise specified. Provide proprietary fertilisers, delivered to the site in
omission in the Specification or Drawings. works, stabilisation of exposed surfaces, diversion drains All vegetation and weed removal is to be carried out using sealed bags marked to show manufacturer or vendor,
Verify discrepancies between Specification and Drawings 11.0 IRRIGATION
and silt traps over and above those already installed in industry standard accepted safety procedures and weight, fertiliser type, N:P:K ratio, recommended uses and The irrigation system shall be fully automatic provide even
with the Landscape Designer before proceeding with the civil works. equipment to ensure personal and environmental application rates. Store in a dry secure environment.
particular work. Failure to do so will not be taken as a cover to all grass and planting areas. Do not waste water.
protection. Avoid damage to nearby trees and Apply according to manufacturer's recommendations Take particular care to install the correct nozzle for the
reason to claim for extra work. Surface drainage shall be diverted clear of excavations and
surroundings. (rate/reapplication/watering). situation, and also allow for specific sprinkler and valve
covers shall be provided where necessary for safety.
Convey soils, earth, sand, loose debris and the like to or Ensure that run-off is not concentrated onto adjoining Garden beds - Slow Release - Osmocote or similar adjustment as will be required.
Grub out stumps and roots over 75mm diameter to a
from the site in a manner that will prevent dropping of properties and does not cause a nuisance thereto. minimum depth of 500mm below sub-grade. Stumps less approved. This Specification is not project or site specific. The intent
materials on streets, public and private areas. Cover all Finished surfaces shall be graded in accordance with than 75mm diameter shall be cut off at ground level and Tree plantings - Slow Release - Osmocote or similar is to provide a basis on which a professional standard,
loads with taut heavy-duty purpose fitted tarpaulins to Construction Plans. treated to prevent regrowth. approved. fully operational, compliant (with all applicable industry,
ensure no loss of load or dust. Ensure that the wheels, Erect barriers as required to prevent excavated material Grassing - Growforce 301 or similar approved100kg/Ha local authority and Australian standards) irrigation system
tracks and body surfaces of all vehicles and plant leaving and rocks from intruding onto adjoining properties. Completely remove woody weeds within the extent of can be provided for the site. Submission of the design to
the site are free of mud and that mud is not carried onto Establish exact locations of services, drains, sewers and works. Local Authority for approval and all costs involved are the
adjacent paved streets or other areas. 7.0 MULCH responsibility of the irrigation subcontractor.
water supply lines and points prior to commencing works Supply and install organic mulch to a minimum of 100mm
and ensure their protection during the works. Fully automatic commercial quality system:
Check all delivery tickets, labels, identification marks 3.0 FINISHED LEVELS & GRADES and gravel mulch to a minimum of 50mm. Ensure mulch
and, the goods themselves to ensure that all products All major earthworks associated with this project shall be Minimum cross falls of 1:50 on planting and pathways to meets Australian Standards and is free from deleterious · 24 station (min) commercial controller in lockable box;
comply with the project documents. Where different carried out as part of the Landscape Works. drainage collection points and overflow points. Planting matter, fungi and disease. Mulch shall finish 25mm below · Mains tapping point back flow device, including dual
types of any product are specified, check to ensure that areas should not exceed 1:3. adjacent surfaces. check valve in lockable box to council requirements, to
the correct type is being used in each location. In ENVIRONMENTAL PROTECTION
be undertaken by builder refer to hydraulic drawings;
particular, check that:- The Landscape Subcontractor should consider in every
· Filter at back flow;
All stock has been adequately protected for loading and in instance whether the use of chemicals is strictly necessary 4.0 CULTIVATION & SUBSURFACE DRAINAGE 8.0 PLANT SUPPLY
· Control wire;
transit. before application, and assess the product, site conditions The Landscape Subcontractor is to provide for sufficient The Contractor shall supply plants as specified in the
· Conduit access to all isolated areas;
The sources, types, qualities, finishes and colours are and species to ensure minimum risk to his employees, surface and sub-surface drainage to garden and grass planting schedule. Plants shall be delivered on site true to
· Drip irrigation to new garden areas;
correct, and match any approved samples. other users of the site and the environment. areas to ensure adequately drained soft landscaped areas pot size, species and type, and free of weeds, disease and
· Pop-up irrigation to grassed areas;
The correct species, cultivars, pot sizes, plant height, girth free from surface ponding water and heavy/ waterlogged fungal infection. Substitutes will not be made without
· Coordinate penetrations and suspended under slab
or spread have been supplied for each consignment from When using pesticides the Landscape Subcontractor must prior consent of the Landscape Designer.
soils. Surface and sub-surface drainage is to aid in the conduit and copper work with builder.
the supplier. use a certified operator and take appropriate safety
healthy growth and continued thriving of all plant stock All plants shall be true to scheduled nomenclature, well · An approved rainswitch override is to be installed to
All materials should be clean, undamaged and otherwise precautions in accordance with all current statutory
and grass areas. formed, hardened off and disease free nursery stock. cut-off irrigation after a pre-set rainfall level has been
in good condition. regulations.
Comply with the relevant Australian Standards to the They shall be container grown in potting soil with root reached. Install to manufacturers' directions with a
Where appropriate protective covers should be intact system firmly established but with no large roots growing manual override switch.
with unbroken seals. The Landscape Subcontractor must dispose of unused extent that they are relevant and not over-ridden by the
specification. out of the container. No plant shall be pot bound.
and unwanted containers and chemicals in a safe way in
Ensure that trunks and branches are free of dieback, Give 10 working days notice of the proposed date for the
Ensure adequate provision is made for the protection and accordance with the methods approved by the relevant
Cultivate sub-grade to a minimum depth of 150mm prior cavities, sunburn and secretions. Trunk and branches are instruction. Provide written operational instructions for
storage of deliveries. In particular ensure that:- authorities. Disposal will be off site.
to placing topsoil to all planting and turf areas on ground. to be evenly tapered and textured typical of the specie. the installation under the Contract. The defects liability
Materials which may deteriorate with storage must not period for the irrigation system shall be 52 weeks from
be stockpiled on site. Herbicide must never drift, fall or run-off onto open water Plant material is to be matured enough to support
or onto adjacent sites, gardens or ground not intended for themselves without staking. the date of Practical Completion.
Adequate and appropriate provision is made for storage
prior to deliveries arriving on site. ALL materials in treatment. 5.0 FILL & TOPSOIL
storage are to be suitably protected from physical damage Fill and subsoil material used to make up levels shall be Branches should be evenly distributed, exhibit a full well
The Landscape Subcontractor will be responsible for re-used from previous earthworks operations on site or 12.0 TANK INSTALLATION
and extremes of weather and to minimise hazards assessing any potential wildlife problem when tendering formed canopy that occupies a minimum 1/3 of the
imported as required and shall be excavated material Supply and install tank to size and location specified as per
persons, materials and equipment. Keep storage areas and during the course of the works. Allowance must be overall current height. Specimens are to be prepared for
which is composed of natural site subsoils but free from: drawing by others.
neat and tidy. made for any protection or control of such pests the their intended purpose. For ex-ground stock where
Do not use roads, driveways, paths hard standings and the Landscape Subcontractor deems necessary. Subsequent canopy modification is intended, provide details of how
· Logs, stumps or other un-decomposed vegetative each specimen's visual character will be at time of
like forming part of the works for access or storage unless wallaby or rabbit damage to planting or other works will 13.0 LIGHTING
material. delivery.
prior written approval has been given. be deemed as defective work and subject to replacement All lighting is to be carried out out a qualified electrician.
· Materials susceptible to spontaneous combustion.
as per the normal contract conditions. Foliage shall be evenly distributed across the crown in All recommended lighting is merely a suggestion, with the
Operatives must be appropriately skilled and experienced · Clay, of liquid limit exceeding 90 and/or plasticity index
proportion to the branching structure as well as be of a ultimate style of lighting used at the description of the
for the type and quality of work and familiar with the exceeding 65.
Any proposed method of protection or control of pests true colour typical of the specie, dense and of good size. client.
terms of the specification. · Refuse and rubbish, including paper, plastics, rubber,
must be agreed with the Superintendent prior to use on Ensure foliage is free of deficiencies and burn. Plant
Inspect products/materials/stock carefully before use and metal and all type of containers.
site. material is to be 'hardened' to full sun and exposed
· Concrete, bitumen, brick, steel, masonry rubble or other
reject any which are defective. conditions by the supplier to ensure successful plant 14.0 MAINTENANCE/ESTABLISHMENT PERIOD
deleterious material.
Use products/materials only in the method and for the Restrict dust caused by the Works to a minimum. Take all establishment into the site environment. For ex-ground Maintenance of all landscape works is to be carried out by
· Toxic substances and compounds that would inhibit
purpose recommended by the manufacturer. practicable steps to minimise noise resulting from the stock apply an anti-transpirant. the Contractor until completion of the landscape works.
healthy plant life.
Ensure appropriate quantities are utilised, provide Works. Maintenance includes replacement of dead and/or
· Any material not capable of being satisfactorily At the time of the last plant stock review prior to site
adequate measures for mixing and spreading of all diseased plant stock, removal of weeds and rubbish, weed
EROSION AND SEDIMENT CONTROL compacted. delivery, plant material is to conform with the specified
products or materials. spraying and mowing.
Set out components or stock to ensure correct Take all precautions necessary to prevent erosion, minimum plant sizes in the Plant Schedule. Plants shall not
contamination and sedimentation of the site, surrounding Any such material shall be removed from site to the exhibit signs of having been stressed at any stage during
positioning and spacings are achieved.
areas, water and drainage systems, in accordance with Landscape Subcontractors own tip. their development due to inadequate watering, excessive
Protect finished work from subsequent operations and
interference by others as project progresses. the Environmental Protection (Water) Policy 1997. shade/sunlight, suffered physical damage or have
restricted habit due to growth in nursery rows.
seed landscape design NOTES
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Attn: Developer/Builder
Landscape Compliance Certification may be
necessary at BA Stage of development.
DRAWING
specification
CLIENT
KIDD + Co
PROJECT
160614
Please contact Landscape Designer for Detailed drawing no. 160614 01
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps DESIGNERS 46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au © 2016 SEED Landscapes ISSUE
Document Set ID: 21024968
abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
28/10/18
B
Page 5
-
1:200@ A3
NOOSA COUNCIL LANDSCAPE PLAN
Scale 1:200 @ A3
0 5 10 20 50 100 APPROVED PLAN
Elizabeth Street OPW19/0278 8 JAN 2020
06 TURFED AREA:
04 Install A-Grade Green Couch Turf over
100mm topsoil to council verge
CONCRETE DRIVEWAY:
EXISTING TREES: Standard entry driveway, Standard BCC
Protect and retain existing trees as per crossover; all necessary council
BCC Guidelines and AS4970 approvals to be in place prior to
01 TREE PLANTING: constructing driveway or crossover
04 Shade trees with non-invasive root
systems to maintain privacy and aid in SCREEN PLANTING: 03
sustainable building practices Shrubs and trees to screen fence 04
and provide privacy from street and
02 CLIMBING PLANTING: develop visually interesting frontage
04 Climbing vine to narrow garden bed to
GARDEN EDGING: 07
grow over fence and reduce visual impact
Concrete edging to separate garden 04
and turfed areas
HARDSTAND AREA:
Extended precast concrete pavers or TURFED AREA: 06
Install A-Grade Green Couch Turf 04
concrete slab of decking around pool to
accommodate pool fencing and extend over 100mm topsoil to private open
recreation space for residents space
enjoyment
03
04
SCREEN PLANTING:
Shrubs and trees to screen fence and U1
provide privacy from neighbours
U2 SCREEN PLANTING:
Shrubs and trees to screen fence
and provide privacy from
neighbours
03
04
ORGANIC MULCH: 04
75mm deep organic Hoop Pine (no 04
fines) mulch to all garden beds unless
otherwise stated
02 GARDEN PLANTING:
04 Native local species planting for GARDEN PLANTING: 02
environmental responsible practice, Small groundcovers in gap between 04
300mm cultivated garden soil to beds concrete slabs to soften visual impact
HARDSTAND AREA:
Precast concrete pavers or concrete slab
U4 ORGANIC MULCH:
75mm deep organic Hoop Pine (no 04
fines) mulch to untility area to allow
04
DRAINAGE:
All paths and garden beds to fall
away from proposed building and
excess storm water to be collected
06
to extend passive recreational area for
resident
TURFED AREA:
U3 access and 'soft' edge for planting
HARDSTAND AREA:
Extended precast concrete pavers or
in stormwater pits where available concrete slab of decking around pool to
04 Install A-Grade Green Couch Turf over accommodate pool fencing and extend
IRRIGATION: 100mm topsoil to council verge recreation space for residents
Drip line irrigation system to be fully enjoyment
automated to cover all garden areas; POOL FENCING:
Spray irrigation pop-ups in all turf Frameless glass pool fencing and gate to pool TURFED AREA: 06
zone; fencing must comply to local council Install A-Grade Green Couch Turf 04
SOIL CONDITIONER: and Australian Standards codes over 100mm topsoil to private open
ECO Hydro Terraplex (source from POOL: space
Eco-environment) conditioner to all Pool and pool position by architect; refer to
garden beds; refer to manufacturers architects details POOL:
specifications Pool and pool position by architect;
04 SANDSTONE GRAVEL MULCH: refer to architects details
04 70-140mm tumbled Sandstone River rock
gravel mulch in all pool area planting DRYING AREA:
seed
zone Fence mounted clotheslines to drying
area; refer to manufacturer's detail
NOTES DRAWING CLIENT LEGEND PROJECT
landscape design Attn: Developer/Builder
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Landscape Compliance Certification may be
necessary at BA Stage of development.
Please contact Landscape Designer for Detailed
landscape plan KIDD + Co proposed tree
existing tree
driveway
pedestrian path
160614
drawing no. 160614 02
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps DESIGNERS groundcovers/grasses paved area
46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au north proposed shrubs
ISSUE
'
© 2016 SEED Landscapes
Document Set ID: 21024968
abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
turfed areas 28/10/18
B
Page 6
-
1:200@ A3 PLANTING PLAN
NOOSA COUNCIL Scale 1:200 @ A3
0 5 10 20 50 100
APPROVED PLAN
Elizabeth Street OPW19/0278 8 JAN 2020
3 BAN eri
3 BAN spi
3 BAN spi 5 LOM lon
3 HIB spl 5 BAN eri
2 HIB div
3 COR rub 5 ALP cae
3 HIB div
1 BAN rob 1 MEL qui 5 CAR app 2 BAN spi
3 WES fru 5 WES fru
3 SYZ aus
3 PAN tec 2 ARC cun
3 PAN tec
6 LEP art 6 SYZ HG
3 ALP cae 1 ARC cun
6 SYZ HG 1 ARC cun
4 HIB spl 7 CAR app 4 WES fru
2 BAC cit 10 LEP art
4 WES fru
12 LEP art 6 SYZ aus
3 ARC cun
1 STE sin
3 ALP cae 6 LEP art
6 ALP cae
U1
4 SYZ HG
2 COR rub
4 WES fru
U2
26 DIA cae
2 MEL ell 7 COR rub
15 LEP art
3 ALO bri
3 LIN mon 2 PAN tec
4 HIB sca 6 ALP cae
3 LIN mon
4 SYZ aus 4 WES fru
9 ALP cae
6 WES fru 6 SYZ HG
5 WES fru 1 ARC cun
3 LOP con 4 ALO bri
6 SYZ HG 10 COR rub
9 ALP cae 3 CRI ped
14 LEP art 3 WES fru
5 SYZ aus 2 MEL ell
4 VIO ban
5 ALP cae
18 CAR app
U4
1 MEL ell 6 SYZ HG
1 ARC cun
1 SYZ aus
U3 8 VIO ban
5 COR rub
6 COR rub 1 SYZ aus
1 ARC cun
5 WES fru
25 CAR app
1 MEL qui
4 SYZ HG
5 ALP cae
1 STE sin
6 SYZ aus 6 SYZ aus
6 COR rub 1 STE sin
1 LOP con
4 WES fru 4 WES fru
2 ARC cun 4 BAC cit
seed
1 ARC cun
30 CRI ped 5 SYZ HG
4 SYZ aus 6 SYZ aus
4 BAC cit
10 LOM lon
NOTES DRAWING CLIENT LEGEND PROJECT
landscape design Attn: Developer/Builder
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Landscape Compliance Certification may be
necessary at BA Stage of development.
Please contact Landscape Designer for Detailed
planting plan KIDD + Co proposed tree
existing tree
driveway
pedestrian path
160614
drawing no. 160614 03
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps DESIGNERS groundcovers/grasses paved area
46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au north proposed shrubs
ISSUE
'
© 2016 SEED Landscapes
Document Set ID: 21024968
abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
turfed areas 28/10/18
B
Page 7
- LANDSCAPE DETAILS
NOOSA COUNCIL
APPROVED PLAN
OPW19/0278 8 JAN 2020
Provide depression
in mulch at base
of plant
Provide depression
in mulch at base of
plant
75mm Mulch
75mm Mulch
Stake and tie single
stemmed stock with
appropriate materials SUBGRADE
Excavate hole 100mm cultivated Excavate hole 200mm wider &
1000mm wide subgrade deeper than pot size and backfill
with imported topsoil
and 1000mm
deep, backfill 03 SHRUB PLANTING DETAIL
hole with 04 Scale 1:25 @A3
modified site
topsoil 100mm mulch layer
75mm mulch layer
300mm deep modified
300mm deep modified site soil except where
4 x 10g slow site soil except where
release tree plantings occur
tree plantings occur
fertilizer tablets Cultivate subgrade to
Cultivate subgrade to
Install root 100mm depth. 100mm depth.
barrier to
900mm
deep
Cultivate soil at
base of hole to
100mm depth SUBGRADE
01 TREE PLANTING DETAIL 04 ORGANIC MULCH DETAIL 05 GRAVEL MULCH DETAIL
04 Scale 1:25 @A3 04 Scale 1:25 @A3 04 Scale 1:25 @A3
Provide depression
in mulch at base of
plant 75mm
Mulch
MULCH: Refer to
Specification.
CONCRETE MOWING STRIP:
Continuous extruded mowing strip.
Profile as indicated below and refer
to drawings.
TURF: A-Grade turf TOPSOIL:Refer to Specification
SUBGRADE IMPORTED SOIL: CULTIVATED SUBGRADE:Refer to
100mm depth bedding course Specification.
100mm Excavate hole 200mm wider CULTIVATED SUBGRADE: COMPACTED SUBGRADE:Min.
& deeper than pot size and 100mm min depth cultivated SUBGRADE
cultivated sub-grade 150mm thickness.
subgrade backfill with imported topsoil
NOTES
02 MASS PLANTING DETAIL 1. CONSTRUCTION JOINTS:Place at
04 Scale 1:25 @A3 minimum 5m centres.
2. TOOL JOINTS:Make tool joint at
equal distances from both ends.
seed
SUBGRADE Make joint at points of change in
curvature/ direction. Joints to be at
05 TURF DETAIL 07 CONCRETE EDGE DETAIL
04 Scale 1:25 @A3 04 Scale 1:25 @A3
NOTES DRAWING CLIENT PROJECT
landscape design Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Attn: Developer/Builder
Landscape Compliance Certification may be
necessary at BA Stage of development.
details KIDD + Co 160614
Please contact Landscape Designer for Detailed drawing no. 160614 04
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps
DESIGNERS 46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au © 2016 SEED Landscapes ISSUE
Document Set ID: 21024968abn 85 468 007 510
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
28/10/18
B
Version: 1, Version Date: 11/12/2019
Used in these records
Compiled Approved Plans OPW19-0278.01 pdf.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.