Negotiated Decision Notice MCU22 0201
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH
Act.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with
the requirements of the National Construction Code - Building Code of Australia (Volume 1)
as they relate to people with disabilities. Your attention is also directed to the fact that in
addition to the requirements of the National Construction Code as they relate to people
with disabilities, one or more of the following may impact on the proposed building
work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Advertising Devices
3. All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
(Administration) 2015 including both temporary and permanent signage. All
freestanding, pylon or pole signs or signage that is illuminated requires approval from
Council prior to being installed. All signage identified in s6 of Schedule 10 of Subordinate
Local Law No. 1 is prohibited from being erected in the Shire.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details that
the Levy has been paid.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues.
Page 9 of 41
Document Set ID: 23372937
Version: 2, Version Date: 27/11/2024