Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                      Acceptable Outcomes                            Planning Comment
                                           AO4.3
                                           Any alterations or repairs to infrastructure
                                           as a result of the development are made at
                                           no cost to Council.

                                           AO4.4
                                           Development avoids stormwater inflow
                                           and infiltration to the sewer infrastructure
                                           network.

                                           AO4.5
                                           Stormwater infrastructure is designed to
                                           minimise maintenance costs and the
                                           requirement for specialized equipment for
                                           maintenance techniques.
 PO5                                       AO5.1                                          N/A
 Stormwater drainage infrastructure is     Stormwater drainage infrastructure avoids      Proposed stormwater drainage
 aligned to avoid crossing waterways,      crossing waterways, wetlands drainage          infrastructure does not cross waterways,
 wetlands, drainage lines and ecological   lines and ecologically important areas or      wetlands, drainage lines and ecological
 important areas, or where it is           follows the edge of existing disturbed         important areas.
 demonstrated this is unavoidable,         areas.
 disturbed areas are reinstated and
 revegetated upon completion of works.     AO5.2
                                           Stormwater drainage infrastructure is co-
                                           located with other infrastructure within a
                                           combined utility corridor where
                                           appropriate.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.