Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
(b) do not present an appearance of appearance of bulk to Rene Street or other
bulk to roads or other areas in the areas in the vicinity of the site with high
vicinity of the site; quality building façade and landscaping
(c) maximise the retention of existing treatments visually breaking up the bulk of
vegetation; the building.
(d) allow for soft landscaping between Soft landscaping is to be provided between
buildings and within frontages; the building and street frontage.
(e) allow for adequate area at ground For ground level staff amenity, each
level for staff amenity; warehouse unit is self-contained with its
(f) facilitates onsite stormwater own bathroom facilities. The micro-
management and vehicular access; industrial strata units labelled as Trade
(g) are in keeping with surrounding Hubs have access to a bathroom and end-
development. of-trip facility within the basement area.
Stormwater is appropriately managed on
the site with discharge flowing to Rene
Street and to available nearby stormwater
piping.
Vehicular access is able to service the
entire lot and the proposed development
is in keeping with the surrounding
development.
Factory Street Business and Industry
Precinct
PO11 No acceptable outcome provided N/A
Buildings and other roofed structures for The proposed development is not in the
non-industrial uses have a plot ratio not Factory Street Business and Industry
exceeding 1:1. Precinct.
jrey.au | (07) 3106 3221 | [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.