Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                         Acceptable Outcomes                          Planning Comment
                                              Developments are designed to eliminate
                                              retaining walls in excess of 0.8m for any
                                              water quality treatment device.


Hydrology and waterway stability          Table 9.4.8.3 Criteria for assessable development (part)

 Performance Outcomes                         Acceptable Outcomes                          Planning Comment
 Hydrology and waterway stability
 PO10                                         AO10                                         Complies
 Development prevents increased bed and       The development is designed to:              The proposed development will reduce
 bank erosion and sedimentation in               (a) limit the peak 1 year ARI event       bank erosion and sedimentation in
 receiving waterways by avoiding changes             discharge within the receiving        receiving waterways over the existing
 in low rate, peak flow run-off and flow             waterway to the pre-development       situation.
 duration.                                           peak 1 year discharge;
                                                 (b) maximise pervious areas by using
                                                     pervious alternatives for otherwise
                                                     impervious areas wherever
                                                     possible;
                                                 (c) provide for capture and reuse of
                                                     stormwater for non-potable
                                                     purposes for gardening, toilet
                                                     flushing, laundry and hot water
                                                     supply uses;
                                                 (d) incorporate appropriate detention
                                                     features; and
                                                 (e) incorporate natural channel design
                                                     principles




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.