Performance Outcomes Acceptable Outcomes Planning Comment
Developments are designed to eliminate
retaining walls in excess of 0.8m for any
water quality treatment device.
Hydrology and waterway stability Table 9.4.8.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Hydrology and waterway stability
PO10 AO10 Complies
Development prevents increased bed and The development is designed to: The proposed development will reduce
bank erosion and sedimentation in (a) limit the peak 1 year ARI event bank erosion and sedimentation in
receiving waterways by avoiding changes discharge within the receiving receiving waterways over the existing
in low rate, peak flow run-off and flow waterway to the pre-development situation.
duration. peak 1 year discharge;
(b) maximise pervious areas by using
pervious alternatives for otherwise
impervious areas wherever
possible;
(c) provide for capture and reuse of
stormwater for non-potable
purposes for gardening, toilet
flushing, laundry and hot water
supply uses;
(d) incorporate appropriate detention
features; and
(e) incorporate natural channel design
principles
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.