Original source · versioned page text
Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
Designs small improvements, new ideas,
concepts and sketch designs for
stormwater filtration systems (Healthy
Waterways Water by Design).
AO11.5
Floodplain management is designed in
accordance with the Framework for the
Integration of Flood and Stormwater
Management into Open Space published
by Healthy Waterways Water by Design
(version current at the time of
development application)
PO12 AO12.1 Complies
Development protects in-stream ecology Where run-off from or within the site The development will improve stormwater
by maintaining pre-development low flow passes through or drains to natural conditions from the existing situation
discharge regimes and maintaining fish channels, waterways or wetlands, where stormwater from hardstand flows
passages. development protects in-steam ecology by directly into rear drainage lines. The
maintaining pre-development low flow proposed development will include
discharge regimes in accordance with the stormwater management to manage flow.
frequent flow management objectives in No barriers to existing fish communities
PSP6 Engineering Design Standards - are proposed.
Roads, drainage and earthworks
AO12.2
Instream structures such as roads, bridges,
culverts, and other stormwater
infrastructure do not cause barriers to fish
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.