Original source · versioned page text
Attachment B - Code Compliance Assessment.pdf
(iii) safety and navigation of any waterways;
(iv) natural values of waterways, including water quality and bed and bank habitat;
(v) the flood storage area of waterways of the Noosa Waters Estate; and
(vi) the structural integrity, operation or maintenance of any existing structure.
Table 9.4.9.3 - Criteria for assessment
Landing Table 9.4.9.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Landing – prescribed tidal works outside Noosa Waters Estate
Role and function
PO1 N/A
A landing— No acceptable outcome provided This development does not include
(a) provides a high level of amenity prescribed tidal works.
with no adverse effects on the
surrounding area including changes
to light, views, air quality and noise;
(b) is compatible with the scenic values
of the waterway; and
(c) does not adversely affect the
natural landscape character and
vegetation along the foreshore.
Landings in conjunction with a
commercial use N/A
PO2 No acceptable outcome provided This development does not include
Development— prescribed tidal works.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.