Original source · versioned page text
Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
Park and Weyba Bridge (Refer to Figure
9.4.9.3M).
PO8 N/A
Prescribed tidal works do not include No acceptable outcome provided This development does not include
extensions of on-site recreational areas prescribed tidal works.
unless there is a clear demonstrated
community benefit and community
support.
Character and amenity Table 9.4.9.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Character, amenity & access – prescribed tidal works outside Noosa Waters Estate
Site Responsive Design
PO9 AO9.1 N/A
Prescribed tidal works are designed and For lots with waterway frontage greater This development does not include
sited to ensure— than 15 metres in width, jetties and prescribed tidal works.
(a) they are contained within the pontoons are setback a minimum of 3
prolongation of boundaries of the metres from the prolongation of the
lot; boundaries (Refer Figure 9.4.9.3A).
(b) that when a vessel is berthed it
does not encroach over the AO9.2
prolongation of boundaries of the For lots with waterway frontage of less
lot; than 15 metres in width (including lots
(c) a high level of visual amenity is located in waterway bends or at the head
maintained when viewed from the of the waterway)—
waterway and adjoining lands; (a) a joint application is made with the
adjoining owner; or
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.