Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                          Acceptable Outcomes                             Planning Comment
        (i) avoiding bulky or large                   and is generally perpendicular to
             structures; and                          the revetment wall;
        (ii) minimising structures above the      (d) the highest part of the boat lifting
             water level;                             device is no higher than the top of
    (d) ensure the structural integrity of            the revetment wall under normal
        the works is maintained and not               canal water level conditions;
        compromised; and                          (e) the boat lifting device is not located
    (e) avoid a secondary boat lifting                on the jetty head; and
        device (floating dock) that exceeds       (f) the outermost projection of any
        8m².                                          boatlifting device is setback a
                                                      minimum of 1 metre from the
                                                      prolongation of the boundaries.

                                               AO21.2
                                               Only one primary boat lifting device and
                                               one secondary small device (floating dock)
                                               per jetty. The small secondary floating
                                               dock is no greater than 8m² and purpose
                                               designed for personal watercraft such as
                                               jet skis, kayaks, paddleboards etc.

                                               AO21.3
                                               A shared jetty contains only one boat lifting
                                               device on either side of the jetty.

                                               AO21.4
                                               The structure may be securely attached,
                                               excluding roped, chains and straps, to an
                                               existing jetty where a structural engineer's


jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.