Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                       Acceptable Outcomes                        Planning Comment
 Fixed Floating Structures & Boat Ramps within Noosa Waters Estate waterways
 PO22                                                                                  N/A
 Fixed floating structures whether or not   No acceptable outcome provided.            This development does not include
 attached to land (e.g. pontoons and any                                               prescribed tidal works.
 associated walkways) and boat ramps are
 not located within the Noosa Waters
 Estate.


Flooding and amenity functions Table 9.4.9.3 Criteria for assessable development (part)

 Performance Outcomes                       Acceptable Outcomes                         Planning Comment
 Flooding and amenity functions – operational works within Noosa Waters Estate waterways
 PO23                                       AO23.1                                      N/A
 The flood detention and amenity functions For premises adjoining a waterway within     This development does not include
 of the area adjacent to the revetment wall the Noosa Water estate, no building work,   prescribed tidal works.
 within Noosa Waters Estate are retained    filling or excavation works within 4.5
 and enhanced by ensuring—                  metres of the centre line of the top of the
     (a) works do not protrude through a    concrete revetment wall.
         batter line of 1:4.5 measured from
         the centre line of the revetment   AO23.2
         wall;                              A minimum of 25% of the area within 4.5
     (b) there is no additional load placed metres of the revetment wall is planted
         on the revetment wall;             with shrubs and small trees with a mature
     (c) works do not pose a risk to the    height of 3 metres or less.
         membrane adjoining the revetment
         wall;                              AO23.3
     (d) amenity of the waterway and        The ground surface within the first metre
         surrounding land uses is not       of the revetment wall—



jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.