Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Any damage to footpaths, street plantings,
natural vegetation, kerb and channel,
bridges or roadways at the removal site,
the new site or between the sites is
repaired or reinstated to at least pre-
existing conditions.
PO8 AO8.1 N/A
Waste materials are removed from the site Waste materials are removed from the To be considered in future Building Works
to avoid causing unhealthy conditions site. application.
including:
(a) potential fire hazard; AO8.2
(b) ponding of water; and If a development permit has not been
(c) breeding of vermin. issued for the future use of the site:
(a) hard surfaced areas including
concrete slabs are removed or
covered with a minimum of 300
millimetres of soil; and
(b) disturbed areas are revegetated.
PO9 N/A
The potential for movement from the site, No acceptable outcome provided. To be considered in future Building Works
of soils or similar materials is minimised. application.
PO10 N/A
Vacant sites do not have an adverse impact No acceptable outcome provided. To be considered in future Building Works
upon the amenity of the surrounding application.
areas.
PO11 AO11.1 N/A
The demolition or removal of a building All building materials containing asbestos, To be considered in future Building Works
does not cause a health risk. including asbestos cement sheeting or application.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.