Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
hazard risk and preparing a bushfire hazard
management plan.
Hazardous Materials
PO5 AO5 Complies
Public safety and the environment are not Hazardous materials are not The nature of the use intended for the
adversely affected by the impacts of manufactured or stored in bulk in a proposed development does not allow for
bushfire on hazardous materials bushfire hazard area. storing of hazardous materials
manufacturing or storing in bulk. manufacturing in bulk.
Access and Evacuation Routes
PO6 AO6.1 N/A
Roads provide for easy and safe The road layout provides for through- No new roads are provided as part of this
evacuation of residents of premises and roads and avoids cul-de-sacs and dead-end development.
access by emergency services. roads.
OR
AO6.2
The development has a perimeter road
reserve with a minimum width of 20
metres and maximum gradient of 12.5%.
OR
AO6.3
Cul-de-sacs or no-through roads are
provided with fire trails or access
easements, which are capable of being
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.