Original source · versioned page text
Attachment B - Code Compliance Assessment
Infrastructure Table 6.5.1.3 Criteria for assessment (part) Performance Outcomes Acceptable Outcomes Planning Comment All activities Infrastructure PO41 AO41 Complies Development is supported by adequate Development is connected to reticulated All services are available to the site. infrastructure and urban services including water supply, sewerage and electricity reticulated water, sewerage, stormwater infrastructure networks. drainage, sealed roads, pathways, electricity and telecommunication infrastructure. PO42 Complies Development does not adversely impact No acceptable outcome provided Existing sewer and stormwater assets on the continued operation, viability and within the easement will not be impacted maintenance of existing infrastructure or by this development. Access as a condition compromise the future provision of of easement will be maintained. planned infrastructure. Car Parking Table 6.5.1.3 Criteria for assessment (part) Performance Outcomes Acceptable Outcomes Planning Comment All activities Car Parking PO43 AO43 Complies Sufficient car parking is available to Parking is provided in accordance with The development comprises of strata titled accommodate the number and type of Table 9.4.1.4 of the Driveways and Parking warehousing with a single tenancy vehicles likely to be generated by the use Code occupying no more than 188.96m2. on site. jrey.au | (07) 3106 3221 | [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.