Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
(a) on-site vehicle parking and the Australian Standards for Parking motorcycle can legally park in any of the
manoeuvring areas; and Facilities. excess car parking spaces.
(b) loading and manoeuvring areas for
delivery and service vehicles. AO7.2
Development includes purpose designed
spaces for motorcycles and motor
scooters, which are easily identified from
the driveway of the property and located
as close as practicable to the entrance of
the building on site.
PO8 AO8.1 Complies
Parking and manoeuvring areas are Parking, service areas and manoeuvring Parking, service areas and manoeuvring
designed to areas are setback a minimum of 2 metres areas are setback a minimum of 2 metres
(a) not unduly conflict with from road frontages to allow for from the road frontage to allow for
pedestrians; and landscaping, with the exception of Walter landscaping.
(b) be sufficiently setback from road Hay Drive, Eenie Creek Road and Holts
frontages to not dominate the Road frontages, where no development
streetscape or surrounding areas; occurs within the landscaped frontage
(c) allow for landscaping to reduce the setbacks.
visual impact of the parking,
servicing and manoeuvring areas; AO8.2
(d) complement the future planned In Centre zones, parking, service and
character of the area; and manoeuvring areas are either integrated
(e) avoid development within the within or under buildings and sleeved by
Walter Hay Drive, Eenie Creek Road usable floor space, or located to the rear of
and Holts Road frontage setbacks. buildings.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.