Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
(b) place an additional load on the stormwater infrastructure. Care will be
service; and taken to avoid impact.
(c) unduly increase future maintenance
costs.
PO2 AO2.1 Complies
Maintenance access is provided to all For trunk infrastructure, a registered A registered easement exists for both
stormwater drains, overland flow paths easement in favour of Council is created stormwater and sewerage infrastructure
and associated structures. over all underground infrastructure that crosses the site. Driveways are
located in private property. proposed over the easements which will
provide ease of access.
AO2.2
The width of the easement required is in
accordance with Council’s Planning
Scheme Policy PSP6 Engineering Design
Standards – Roads, drainage and
earthworks.
AO2.3
The easement is centred over the
centreline of the infrastructure.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.