Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Editor’s Note— Design and technical
requirements for infrastructure from third
party providers are to be in addition to, and
integrated where possible, into the overall
design, built form and landscaping
requirements for the development.
Road technical standards
PO2 N/A
Road widths and construction within the No acceptable outcome provided No new roads are provided as part of this
development are adequate for QFES development.
vehicles to gain access to a safe working
area close to buildings and near water
supplies whether or not on-street parking
spaces are occupied.
Editor’s Note—Roads should be designed
and constructed in accordance with Road
Planning and Design manual- 2nd edition.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.