Skip to the record
Search everything, all in one place.

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                        Acceptable Outcomes                           Planning Comment
                                             Landscape elements do not shade solar
                                             collector devices during the middle 6 hours
                                             of the day.
 Stormwater Drainage
 PO7                                                                                       Complies
 Landscaping integrates stormwater           No acceptable outcome provided                Landscaping elements within the front
 drainage and water sensitive urban design                                                 setback to receive stormwater drainage
 elements.                                                                                 from car parking surfaces to improve local
                                                                                           stormwater quality.
 Natural Drainage
 PO8                                         AO8.1                                         N/A
 Landscaping maintains or enhances the       Landscaping works maintain and enhance        The site does not contain natural drainage
 quality of surface water and groundwater.   natural drainage lines (including creeks,     lines. Nearby riparian buffers are not
                                             gullies, waterways and wetlands) to convey    impacted by this development. No tree
                                             stormwater.                                   grates are proposed.

                                             AO8.2
                                             Riparian buffers are maintained and
                                             rehabilitated.

                                             AO8.3
                                             Within paved or sealed surfaces, tree
                                             grates provide for water and natural air
                                             movement however are not to be used as
                                             drain.
 Bank stability
 PO9                                         AO9                                           Performance




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.