Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Landscape elements do not shade solar
collector devices during the middle 6 hours
of the day.
Stormwater Drainage
PO7 Complies
Landscaping integrates stormwater No acceptable outcome provided Landscaping elements within the front
drainage and water sensitive urban design setback to receive stormwater drainage
elements. from car parking surfaces to improve local
stormwater quality.
Natural Drainage
PO8 AO8.1 N/A
Landscaping maintains or enhances the Landscaping works maintain and enhance The site does not contain natural drainage
quality of surface water and groundwater. natural drainage lines (including creeks, lines. Nearby riparian buffers are not
gullies, waterways and wetlands) to convey impacted by this development. No tree
stormwater. grates are proposed.
AO8.2
Riparian buffers are maintained and
rehabilitated.
AO8.3
Within paved or sealed surfaces, tree
grates provide for water and natural air
movement however are not to be used as
drain.
Bank stability
PO9 AO9 Performance
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.