Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Regardless of the width of the easement,
vegetation adjoining easements must be
separated from the power pole or other
infrastructure by a distance at least equal
to the maximum mature height of the
vegetation.
AO12.4
For power lines that connect to a premises,
the height of plant species at maturity
provides for a 2 metre clearance below the
power line.
AO12.5
With the exception of electricity
infrastructure, trees and large shrubs are
located a minimum of—
(a) 4 metres from street lamps;
(b) 2 metres from stormwater
catchment pits; and
(c) 2 metres from underground
services and utilities.
AO12.6
Plants are located to enable tradespersons
to access, view and inspect service meters,
such as water and electricity meters.
AO12.7
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.