Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                          Acceptable Outcomes                           Planning Comment
                                               AO2.4
                                               A collector street is provided parallel to
                                               arterials particularly where they pass
                                               through centres.

                                               AO2.5
                                               Appropriate width of road and verge is
                                               provided to allow streets to perform their
                                               designated functions in the street network.
 PO3                                                                                         Complies
 Development access does not compromise        No acceptable outcome provided                The development does not compromise
 the functions of particular roads as                                                        the road hierarchy.
 indicated in the road hierarchy, and does
 not adversely impact on the safety,
 capacity and operations of the road
 system.


Transport Connectivity        Table 9.4.7.3 Criteria for assessable development (part)

 Performance Outcomes                          Acceptable Outcomes                           Planning Comment
 Transport Connectivity
 PO4                                                                                         Complies
 The transport network, including roads        No acceptable outcome provided                The development is located on an existing
 and pathways, has high levels of                                                            and established urban area with high
 connectivity, both within the development                                                   levels of transport connectivity.
 site and to the surrounding area.
 PO5                                           AO5.1                                         N/A
                                               Development is designed and arranged to:



jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.