Original source · versioned page text
Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
AO5.4
Bus routes are located to maximise patron
catchment and to consider personal safety,
lighting and traffic management.
AO5.5
Development on bus routes does not
impact on bus stop infrastructure or the
efficient running of bus services.
AO5.6
Roads catering for buses are designed and
constructed in accordance the relevant
State government standards.
Editor’s Note — Queensland’s Department of
Transport and Main Roads, and the TransLink
division within the Department have design
standards for public transport networks and
infrastructure.
PO6 AO6.1 N/A
Development enhances connectivity Development provides direct and The proposed development does not
between existing and future public convenient pathway linkages between involve interchange of different modes of
passenger transport facilities and other existing and future public passenger travel between users of the transport
transport modes. transport facilities. network.
AO6.2
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.