Original source · versioned page text
Meeting papers
Very large file (81.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 375, section 1. The text section number identifies this passage in the reader.
Page 375 of 438
ee I aoe 5
ASSOCIATED DOCUMENTS
Ensure all upgrade plan sheets are read in NOOSA AQUATIC CENTRE UPGRADE PLAN
conjunction with each other, including the SITE PLAN sheet 1 of 7
prioritised implementation plan (PIP) which
elaborates on the upgrade plan legend and 6 Girraween Ct, Sunshine Beach
listed improvements
NOTE
ae This upgrade plan drawing is conceptual only
Le and shall not be used for tendering and/or
‘tT uy EE ee construction purposes. A detailed survey of
ae | the site has not been undertaken. All works
15 aa a are subject to Council approval. Future
Pd a architectural and structural engineering
P “se a - detailed design shall refine building works
a*~€ Future civil engineering design shall refine car
park layout
| LEGEND & Boundary = Biodiversity Scenic amenity
overlay area buffer area
ALA
eS 4
—— ie ee y
New Wellness Hub Preservation and protection of 10m scenic
amenity vegetation buffer area
—_—— / f \ >.) Es Preservation and protection of biodiversity
ooo NS | aes a ea ih Me 3 a Upgraded 25m Pool Hub overlay area
— ins | 4/ Upgraded 50m Pool Hub Existing skate park
ae Retain existing maintenance access
¥ — INET A a i} \
—
eo t ie / Upgraded LTS and Play Hub Retain existing southern car park
| we S\
| } —_—_oo Reconfigure, seal and inst
— Pole eee Se all shade tree
oh = a ele) Upgraded and extended Changeroom, Creche planting in eastern car par
aT f een Gym and Multi-Purpose Room Building Retain maintenance access road
e 1 Retain existing path
ih
SN Paw aareene ape ECeS and Peeanneuied Administ:
IN nM Possible linemarking and portions
—— aN 6 Cafe Buil of time restricted parking (3P) along
EEA Girraween Court to maximise car parking
opportunities
= —
8 ——
——*%
rs 4 ; Pts — GENERAL WORKS CAR PARKING
|
—h e Critical 50m, and 25m pool filtration Current
ystem upgrade (including option for pool e Approx. 68 formalised (sealed and
cooling) linemarked) car parking spaces
4 mm 7y General cosmetic, landscaping and Approx. 55 informal (unsealed) car
— oe equitable access upgrades across the site parking spaces
» ant — woe em ST HH PD nn UTS including replacement of existing pool 6 motorbike/scooter parking spaces
ey ea es tan a a e
one Ba es hoist with one or more contemporary, Propesee
= = od a PP compliant pool hoists
ee jae a oy PS Approx. 149 sealed and linemarked car
aman age I aN waaeue eee he Girraween Ct Following completion and monitoring parking spaces (including min. 6 PWD
\ | heanwhialet. aad of above listed works, investigate the parking spaces)
feasibility and need for the following solar 8 motorbike/scooter parking spaces
ine in: L ~~, energy upgrades 1x bus set down area
euuhes a Installation of new panels to Secure bike storage zone
| |
Yu replace existing solar panels on the Electric vehicle charging stations
a Administration and Cafe building Formalised and portions of time restricted
an |
Installation of new panels to replace parking (3P) along Girraween Court
- existing solar panels on Wellness Hub Coordination of NAC Upgrade Plan with
YS €. oa building current and future active transport
IssueK 01.08.25 Scaled 4000 @A3 Design and construction of shade strategies and works
bd Ge structures with solar panels in car park
al - 10 25 bol] areas
rs _ - Installation of solar batteries
”
=
>
al
> NOOSA
i: es | iy a a AS Caypcil, 55See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.