SUPERSEDED Approved Plans OPW17/0561
Plans and drawings: the text below has words only, no drawings.
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................................... 2
SUMMARY ................................................................................................................................................... 3
SCOPE OF THE TREE PROTECTION PLAN ................................................................................................... 4
CAVEATS, LIMITATIONS, AND DEFINITIONS ............................................................................................... 5
Trees proposed for retention: ................................................................................................................... 6
RECOMMENDATIONS ................................................................................................................................ 7
APPENDIX A: Tree location plan ........................................................................................................... 8
APPENDIX B: Tree Protection Zone specification ................................................................................ 9
APPENDIX C: Trunk and ground protection ...................................................................................... 10
APPENDIX D: All works within a Tree Protection Zone (TPZ) ............................................................. 11
Access Through A TPZ ........................................................................................................................ 11
Demolition Of Structures Within A TPZ .............................................................................................. 11
Construction Work Within A TPZ .......................................................................................................... 12
APPENDIX E: Scaffolding location set out ......................................................................................... 13
APPENDIX F: Installation of piles and capping ................................................................................. 15
Environmental Control Plan to prevent pollution from concreting operations during the
construction (Grouting & Pile Caps) .................................................................................................. 15
Background....................................................................................................................................... 15
Controls: ............................................................................................................................................. 15
INSTALLATION OF PILES AND CAPPING .............................................................................................. 16
Methodology for installation of hollow bar micro-piles as deep foundation support for the
new timber deck. ............................................................................................................................. 16
REFERENCES .............................................................................................................................................. 17
12 PARK ROAD 1A / 357 – 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 2 9699 2622 2
NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Approved Plans OPW17/0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.