Original source · versioned page text
Bushfire
GMA Certification Group Pty Ltd 3.0 Site Bushfire Attack Category Assessment Table 3 shows the results of the site inspection which determined the separation distance of the predominant vegetation class and type in each direction. The Category of Bushfire Attack will be derived from the worst case scenario for the proposed site. Table 3 Site Address: Site Slope & Separation Distance of the Site from the Predominant Vegetation Class Direction <15m 15 to 40 m >40 m to 100 m >100 m Slope (>10° or <10° >10° >10° >10° <10°) Location Predominant Vegetation Class & Type North 28 9 12 or8 8 South 28 8 12 or 8 12 or 8 East 28 9 12 or8 12 or 8 West 28 28 28 28 Determination of Category of LOW HIGH MED LOW Bushfire Attack for Site Category of Site Bushfire Attack Result: Predominant Vegetation Class A.C Level 2 Construction Required 4.0 Level of Building Construction Required. The results of Part 3 Site Bushfire Attack Category Assessment have determined that Level .2 Construction is required for the proposed site. Section 3 of AS 3959 sets out the construction requirements of various elements of the building in order to reduce the likelihood of ignition of the building when subjected to bushfire attack. GOLD COAST OFFICE WESTERN REGION OFFICE PHONE 07 5578 1622 PHONE 07 4742 2022 FAX 07 5596 1294 FAX 07 4742 2033 Suite 26 “Advance POSTAL 42B Ramsay St POSTAL Business Centre” PO Box 2760 CLONCURRY QLD 4824 PO Box 557 39-47 Lawrence Drive NERANG QLD 4211 CLONCURRY QLD 4824 NERANG QLD 4211 5 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.