Original source · versioned page text
ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401
Attached to the e-mail Response to Information Request - MCU16/0138.
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
suitably qualified person (RPEQ) that indicates that the development does not require
assessment against the code.
RESPONSE
It is requested that Council condition this as part of the assessment, to ensure that all excavation or filling on land below 5
metres AHD is undertaken in accordance with the Acid Sulphate Soils Management Plan.
This response represents our complete response to the Information Request issued by the Noosa Council, and we
look forward to the decision notice being issued by Council in accordance with the relevant provisions of the SPA.
As always, please feel free to contact me direct should you require any additional information or clarification.
Yours faithfully,
ADAMS + SPARKES
TOWN PLANNING + DEVELOPMENT
Cameron Adams
MANAGING DIRECTOR
Encl: Amended Architectural Plans, prepared by Icon Building Design (Attachment 1)
Engineering Correspondence, prepared by JTC Consulting Engineers (Attachment 2)
Hydraulic Modelling Report, prepared by TOPO Consulting (Attachment 3)
Amended Engineering Drawings, prepared by JTC Consulting Engineers (Attachment 4)
Cc: Paddy Guilford
Jason & Susan Payne
Amritash Rai
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.