Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
APPENDIX | Engineering Assessment Prepared by Brown Consulting 743 Ann Street, PO Box 1559, Fortitude Valley QLD 4006 Phone 07 3287 8899 Facsimile 07 3237 8833 Page 38 | 20517_PlReport_FINAL_FW MC.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 32 pages
Page 2
ONSULTING Engineering Submission Material Change of Use "Essence of Peregian” David Low Way, Peregian Scanlon Property Group NO7046CEROO2 28 June 2007 BROWN CONSULTING (QLD) PTY LTD Consulting Engineers & Managers ABN 38 109 428 506 Telephone (07) 5477 6469 Facsimile (07) 5477 6486 Level 1 / 15 Nicklin Way, PO Box 997, Buddina QLD 4575 E-mail [email protected] Website www.brownconsulting.com.au
Page 3
\/ TABLE OF CONTENTS 1.0 INTRODUCTION .........ccseescessessessseneeseecseesseneeseesessaneeeeesesaeneneeseeeeneaeesteassnensensersenense 1.1. Site Description pete eaceeenaceeeasesenanaeensnesensesesenesenscesedsaeeeaenneeennaeessaaeesanensesessnenensneeteeesenens 2.0 EROSION AND SEDIMENT CONTROL ..........cscsesssssseeseesessneseneressnessenseesennennentenensaee 3.0 EXISTING SERVICES. ........ccssssescsessetecsereneeeeeeeeseennier sees snveeeessetnaveeneeenneaninnneeneaeeee 3.1. Water Reticulation .........ccecsscsssscsssssseeessreeeseeseeeesesseseeseesesuseesesessesssaeeneesoneesanenecnnaee 3.2. Sewerage Reticulation ........ccsccssscnesseessseessseeeseseeeesseeseseeneesseesesaeessneesseenseennesseeesees 4.0 EARTHWORKS. ......ccccssssseeessesceseesensessesereesessesseceecessesaeensaeseusesaseneesansessesseeesaseesnsaes 5.0 ROADS AND DRAINAGE .........::cccscceeseeeeeteeneeeeenesenenneenes a nennensnensunenseuensessasootennesceeneee 6.0 WASTE MANAGEMENT..........cccccccscsseeeseseseeseeneseesesseeeseesaesessesesseeeneeseeessanseseensenaee 7.0 CONCLUSION .........:ccscssssseenessereesesseseresnesoesnesseusaveneesesesseecseseesaseessessanspensesonsensaaneeee APPENDICES Earthworks Code — Proposed Measures Sediment & Erosion Control Code — Proposed Measures Existing Services Code — Proposed Measures Transport, Roads & Drainage Code — Proposed Measures com> Water Supply & Sewerage Reticulation Code — Proposed Measures Engineering Drawings am
Page 4
BROWN CONSULTING (QLD) PTY LTD — SUNSHINE COAST Sommurtine 1.0 INTRODUCTION This Material Change of Use application addresses Lots 215-219 David Low Way, Peregian. The proposed development consists of the following: e 66 x Accommodation Units; e 34x Accommodation Shacks; e 1x Caretaker’s Unit; * 978m? of Retail Ground Floor area; and e 978m? of Office Ground Floor area. This report addresses civil engineering issues supporting the Development Application for the Material Change of Use for the subject site. 1.1. Site Description The subject site is bounded by David Low Way to the east, an existing residential housing and commercial development to the north, bushland/wet area to the west and Grebe Street to the south. The site gently slopes downwards to the western portion of the site. The subject site currently contains a small caravan park. Refer to Drawing No. N07046-01 for the proposed site layout in Appendix G. 2.0 EROSION AND SEDIMENT CONTROL During the construction phase of this project, a number of measures will be put into place to mitigate any possible detrimental erosion and sediment issues to surrounding sites and/or watercourses. Disturbed areas will be minimised to include only areas where construction will occur. Sediment basins will be constructed prior to any earthworks at downstream locations on the site. These will be sized accordingly during the Operational Works phase of this development project. Diversion drains will also be constructed as required to direct all runoff to these sediment basins. Sediment fences will be erected at the low lying boundaries of the site to prevent sediment runoff to surrounding areas. Further to this, the boundary between the construction zone and the bushland/wet areas will be delineated by a barrier mesh and sediment fence arrangement to prevent any disturbance to the bushland/wet areas. Proposed Measures for Council's Erosion and Sediment Control Code can be found in Appendix B. : Please refer Drawing Number N07046-02 for the Erosion and Sediment Control Plan. "ESSENCE OF PEREGIAN, DAVID LOW WAY, PEREGIAN Pace 1
Page 5
BROWN CONSULTING (QLD) PTY LTD —- SUNSHINE COAST COMMONS. 3.0 EXISTING SERVICES All proposed relocation and adjustments to existing services will be undertaken in accordance with Sections 3, 4 and 5 of PSP 6 — Engineering Design Standards — Water and Sewerage and Section 4 of PSP 5 -— Engineering Design Standards — Roads, Drainage and Earthworks. As-constructed data for both water and sewer will be submitted in accordance with Sections 3 and 7 of PSP 6 — Engineering Design Standards — Water and Sewerage. Easements will be registered in favour of Council for all sewer, water and stormwater infrastructure in accordance with Council’s requirements. Proposed Measures for Council's Existing Services Code can be found in Appendix C. 3.1. Water Reticulation It is proposed that water supply to the site will be obtained via connection to an existing 150mm diameter water main on the Eastern Side of David Low Way as detailed in the Water Supply Analysis prepared by John Wilson and Partners (refer Appendix H). The connection to the existing water main will be made by Council at the developer’s expense and the external extension of the watermain will be tunnel bored under David Low Way to avoid any disturbance to the existing road network. It is proposed that all internal water reticulation will be designed as per AS 3500 - 1998 National Plumbing and Drainage as this is a group title development. Proposed Measures for Council's Water Supply and Sewerage Reticulation Code can be found in Appendix F. Please refer Drawing Number N0O7046-04 for the Water Reticulation Layout Plan. 3.2. Sewerage Reticulation The site is currently serviced by sewer lines 1A and 1B. The commercial development towards the Northeast corner of the site is also currently serviced by this sewer line. / It is proposed to realign this sewer along the Northern boundary of the site and make adjustments to the internal sewer reticulation within the commercial site (refer Drawing Number NO7046-04 for the Sewer Reticulation Layout Plan). Lines 1A and 1B would remain online until such a time as the proposed sewer is constructed and accepted on maintenance by Council and the live connection for the commercial property can be made. This would be subject to discussion with the adjoining property owner but we do not foresee that this will be an issue. "ESSENCE OF PEREGIAN, DAVID LOW WAY, PEREGIAN PaGE 2
Page 6
own BROWN CONSULTING (QLD) PTY LTp — SUNSHINE COAST The proposed connection point for the development is Manhole ex5/1A. The internal sewerage reticulation will be designed as per AS 3500 - 1998 National Plumbing and Drainage as this is a group title development. Proposed Measures for Council's Water Supply and Sewerage Reticulation Code can be found in Appendix F. Please refer Drawing Number NO7046-04 for the Water Reticulation Layout Plan. 4.0 EARTHWORKS It is proposed that minor earthworks be undertaken to the development site in order to create a pad for the Accommodation and Commercial Buildings. All areas where natural surface levels are altered will have a slope between 0.5% and 1.5%. All earthworks will be designed during the Operational Works phase to drain towards internal Stormwater Drainage. No major changes to natural surface levels are proposed therefore the development site will not have a major impact on the flooding characteristics of the surrounding areas. During the construction phase, all filling works will be undertaken in accordance with Section 28 of Council's PSP 5 — Engineering Design Standards — Roads and Drainage and Earthworks and Sections 3 to 6 of AS3798 — Guidelines for Earthworks on Commercial and Residential Development. Proposed Measures for Council's Water Supply and Sewerage Reticulation Code can be found in Appendix A. Please refer Drawing Number NO7046-04 for the Water Reticulation Layout Plan. 5.0 ROADS AND DRAINAGE Proposed access to the site is via Grebe Street, as shown on Drawing NO7046-03. The proposed drainage layout is as per the Concept Stormwater Management Plan by Brown Consulting. Design of roads and pedestrian/cycle paths will be in accordance with Sections 2 and 3 of PSP 5- Engineering Design Standards — Roads, Drainage and Earthworks. Roads and stormwater drainage design and construction will be undertaken in accordance with Sections 2, 3 and. 4 of PSP 5 — Engineering Design Standards — Roads, Drainage and Earthworks, Queensland Design Code for Residential Streets and Austroads during the Operational Works phase of the development. As-constructed data will be submitted in accordance with Section 6 of PSP 5 — Engineering Design Standards — Roads, Drainage and Earthworks. All roads and stormwater drainage is located clear of the bushland/wet areas. All native vegetation is to be clearly marked and fenced off prior to construction. "ESSENCE OF PEREGIAN, DAVID Low Way, PEREGIAN PaGE 3
Page 7
\/ Finn BROWN CONSULTING (QLD) PTY LTD ~ SUNSHINE COAST POMMUETENS. The frontage of the site is/will be provided with all frontage works as required by Council. Frontage works will be designed and constructed during the Operational Works phase of the project. It is proposed that the development works be undertaken in one stage. All alterations/repairs to existing services/infrastructure associate with the development site will be at the developer’s expense. Proposed Measures for Council’s Transport, Roads and Drainage Code can be found in Appendix D. 6.0 WASTE MANAGEMENT During construction all waste generated will be disposed of in accordance with PSP 11 and adequate area will be provided for storage and collection of all classes of waste material, as required. : Proposed Measures for Council’s Waste Management Code can be found in Appendix E. 7.0 CONCLUSION The proposed development is in accordance with all Council codes addressed in this report. There are no engineering constraints associated with this development. “ESSENCE OF PEREGIAN, DAVID Low WAY, PEREGIAN Pace 4
Page 8
a CONSULTING APPENDIX A EARTHWORKS CODE Proposed Measures
Page 9
DIVISION 14: EARTHWORKS Table 14-49 Earthworks $1.1 The finished surface gradient | of any filled or excavated’ area is within the range 0.5% to 1.5% and drains to Council’s stormwater _| infrastructure where available or where stormwater infrastructure is not available, toward the street. Surface levels of all earthworks areas will have a _ gradient between 0.5% and 1.5% and will drain towards :internal stormwater infrastructure. No solution provided. No major changes to levels are proposed. Runoff storage will be _ provided as per the Stormwater Management Plan as prepared by Brown Consulting and thus will not have an adverse flooding impact off-site: -| For Assessable Development: $3.1 Filling works are undertaken -| in accordance with Section 28 — Filling of Site of Council's PSP5 — Engineering Design Standards — Roads and Drainage and Earthworks. AND $3.2. Where the filling is for residential commercial or industrial purposes the works comply with Sections 3 to 6 of AS3798 -— Guidelines for earthworks on commercial and residential development. All filling works will be undertaken in accordance with Section 28 of Councils PSP5 — Engineering Design Standards — Roads and Drainage and Earthworks and Sections 3 to 6 of AS3748 — Guidelines for Earthworks on commercial and residential development. ‘| (c) Protective ‘| d) If $4.1. The following control measures are implemented: (a) Regular water spraying of exposed areas to suppress dust; : . (b) Provision of dust stabilised or sealed internal roads; covering of exposed areas that are left for more than 2 weeks; and there is no valid development permit for the site, disturbed areas are revegetated using species A Sediment and Erosion Control Plan will be implemented during earthworks ‘so as to not disturb the amenity of neighbouring land as per drawing NQ7046-02 by Brown Consulting.
Page 10
\ abi identified PSP3— Landscaping Plants and Guidelines. AND $4.2 Earthworks are undertaken only during the hours of 7am to 6pm, Monday to Friday and 7am | to 6pm on Saturday. No work is undertaken on Sunday or public -| holidays. | $5.1 Cleared vegetation is. _| transported off-site for disposal in | an approved green waste disposal facility; OR $5.2 Cleared vegetation is mulched onsite and reused for landscaping of the finished development; OR $5.3 Cleared vegetation is disposed of for the purpose of _| firewood. : All cleared vegetation will be transported off-site for disposal in an approved green waste disposal facility or alternatively mulched on site and used for landscaping of the finished development. $6.1 The fill material is sold clean earth, free of putrescible or refuse material, vegetation, acid sulfate ‘| soils, building or construction | material or other material of contaminants. OR $6.2 The site is not on the contaminated land register. All earthworks will be supervised to a Level 1 standard to avoid contamination of land. The site is not on the contaminated land register. No solution provided. No haulage of material to or from the site is proposed. | $8.1 All earthworks, including cut and fill batters, retaining walls etc are contained within the subject site. All earthworks are contained within the subject site.
Page 11
, No solution provided. Earthworks design will be undertaken to minimise impact on groundwater, watercourse, drainage lines, wetlands and native vegetation during the operational works phase. | | No solution provided. No dams are proposed within the site.
Page 12
APPENDIX B EROSION & SEDIMENT CONTROL CODE Proposed Measures
Page 13
J DIVISION 15: EROSION AND SEDIMENT CONTROL Table 14-50 Erosion and Sediment Control $1.1 Site disturbance is limited: to building areas, their surround and other use areas; AND $1.2 Sediment barriers are provided throughout and downslope of disturbed areas to ‘| prevent sediment washing into .| gutters, drains and watercourse either on or off the site. AND $1.3 All stockpiles including sand, | soil or building materials are within the premises and contained within individual sediment barriers; AND $1.4 Sediment basins are provided where the site contains fine or dispersive soils; OR $1.5 A stormwater catchpit incorporating a stormwater ‘| catchpit protection device is | installed so that all runoff from disturbed areas flows to the catchpit; AND $1.6 For buildings: (a) Temporary or permanent downpipes are connected to the stormwater system before laying the roof; OR (b) Locatised erosion is avoided by directing flow from downpipes over non-erosive areas. Sediment runoff from all disturbed areas is directed, via temporary diversion drains, to sediment basins at low end of site to minimise sediment runoff from the site, as per the Erosion and Sediment Control Plan, Drawing No. NO07046-02 by Brown Consulting. Sediment fences are proposed to low lying boundaries of the site to prevent sediment working into gutters, drains and watercourses. All stockpiles will be contaminated within individual sediment barriers. diverted’ $2.1 Diversion drains or bunds are designed and constructed to | drain upstream runoff around the | disturbed site; “= | AND Stormwater runoff will be diverted to sediment basins as per drawing No. NO07046-02 by Brown Consulting.
Page 14
$2.2 Discharge from the diversion drains do not cause runoff impacts to other properties; OR | $2.3 Alternative methods, as described in the Institution of '| Engineer's Australia (Queensland Division) Soil Erosion and Sediment Control — Guidelines for Queensland Construction Sites, are used.
Page 15
“BROWN CONSULTING APPENDIX C EXISTING SERVICES CODE Proposed Measures
Page 16
DIVISION 16: EXISTING SERVICES CODE Table 14-51 Existing Services $1.1 The footing of any structure or building is located clear of the | zone of influence but no closer | than 15.m (measured horizontally) from infrastructure —_ including | sewers, water mains and 1 | stormwater structures; | AND $1.2. No building of. structure | overhangs the zone of influence; AND | $1.3 Finished surface levels | maintain a minimum of 600mm of cover, but not greater than 3m of ‘| cover to the underground infrastructure; AND $1.4 If the existing surface level is altered, surface level services including manholes and inspection points are altered to match the new surface level; .| AND $1.5 Alterations are constructed in accordance with Sections 3, 4 and 5 of PSP6 - Engineering Design Standards -Water and Sewerage and Section 4 of PSPs5 Engineering Design Standards — Roads, Drainage and Earthworks; OR $1.6 Existing services are relocated and the design and construction of the relocated services is in accordance with Sections 3, 4 and 5 of PSP 6 — Engineering Design Standards — Water and Sewerage and Section 4 of PSP 5 — Engineering Design Standards — Roads, Drainage and Earthworks. Existing services are to be protected or relocated in accordance with Sections 3, 4 and 5 of PSP 6 — Engineering Design Standards — Water and Sewerage and Section 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks. | all $2.1. A registered easement in favour of Council is created over underground _ infrastructure located in private property; -| AND | $2.2 The width of the easement is in the greater of 3m or the width of the zone of influence; | AND Easements will be registered in- favour of NSC for all sewer, water and stormwater infrastructure in accordance with NSC requirements.
Page 17
$2.3 The easement is centred over the centreline of the infrastructure.
Page 18
APPENDIX D TRANSPORT, ROADS AND DRAINAGE CODE Proposed Measures
Page 19
DIVISION 18: TRANSPORT, ROADS AND DRAINAGE CODE Table 14-56 Roads and Drainage || $5.1 Road planning and design supports the hierarchy and functional aspects identified in Sections 2 and 3 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks; AND $5.2 Road and pathway planning and design is in accordance with, in order of precedence: (a) | (b) (c) Noosa Integrated —_Local Transport Plan; Queensland Transport's Shaping Up; Queensland Design Code for Residential Streets; AUSTROADS Guide to Traffic Engineering Practice; Sections 2 and 3 of PSPS 5 Engineering Design Standards - Roads, Drainage, Earthworks; or The Noosa Cycling and Walking Network Development Plan; or A combination of the principles in these documents. AND Operational Works design of roads and pedestrian/cycle paths will be in accordance with Sections 2 and 3 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks. To be further addressed by traffic engineer.
Page 20
$5.3 On road cycling treatment is utilised to provide safe and continuous movement of cyclist along a roadway, such as: | (a) (b) (c) sealed shoulders; wide kerbside lane; exclusive or peak period bicycle lane; () advisory treatments such as Bicycle Awareness Zone; shared parking/bicycle lane; (f) contra flow bicycle lane; and bus/bicycle lane. $5.4 The provision of bicycle | lanes at intersections is generally in accordance with AUSTROADS Part 14, Section 5 and the Manual PSP 5 Engineering Design Earthworks; AND planning, design and construction : is in accordance with Section 4 of : of Urban Traffic Devices (MUTCD) Part 9. , $6.1 Stormwater drainage Stormwater drainage planning is in accordance with Section 4 of PSP 5 Engineering Design . Standards — Roads, Drainage and "| Standards — Roads, Drainage and | : Urban Drainage Design Manual, - as per the Stormwater : Management plan prepared by : Brown Consulting. Earthworks and the Queensland
Page 21
$6.2. As constructed data is submitted in accordance with Section 6 of PSP 5 Engineering Design Standards - Roads, Drainage and Earthworks; AND $6.3 Stormwater drainage planning, design and construction is in accordance with the Queensland Urban Drainage Design Manual. Stormwater design and construction will be undertaken in accordance with Section 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks and the Queensiand Urban Drainage Design Manual, during the Operational Works Phase. As Constructed data will be submitted in accordance with Section 6 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks upon completion of construction. $7.1 Road and stormwater drainage infrastructure is constructed in accordance with: (a) Sections 2,3 and 4 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks; (b} Queensland Design Code for Residential Streets; (c) AUSTROADS; or (d) A combination of the principles of these documents. AND $7.2 Erosion and _ sediment control measures are designed and implemented in accordance with the Institution of Engineers Australia (Qld Division) Soil Erosion and Sediment Control — Guidelines for Queensland Construction Sites. Roads and stormwater drainage will be constructed in accordance with Sections 2, 3 and 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks, Queensland Design Code for Residential Streets and Austroads. -
Page 22
‘ ; | AND $8.1 Roads and stormwater drainage follow the edge of existing disturbed areas; or fo | alternatively, these works are co- located within a combined utility corridor; | $8.2 Roads avoid native -| vegetation and provide for fauna -| underpasses and associated fencing where appropriate; | AND $8.3 Road infrastructure within or adjacent to native habitat incorporates fences which allow for protected wildlife movement and controls unrestricted access of domestic cats and dogs; AND $8.4 Native vegetation is protected from clearing or construction activities by: (a) clearly marking vegetation to be retained with flagging tape; (b) installing protective fencing around the dripline of vegetation; and (c) ensuring stock piling, storage and vehicle parking occur outside the areas of vegetation to be retained; AND $8.5 Low impact construction -| techniques are used around areas of vegetation to be retained to minimise interference with the | vegetation. Roads and stormwater drainage infrastructure is located and aligned to avoid disturbance to native vegetation, native fauna, minimise changes to hydrological regime, avoid crossing watercourses, drainage lines and wetlands and minimise bulk earthworks as per Drawing No. A- 05 by JMA Architects, the Stormwater Management Plan prepared by Brown Consulting and Drawing No. NO7046-03 by Brown Consulting. All native vegetation to be clearly marked and fenced off prior to construction. | No solution provided. On and- off maintenance inspections of all assets to be dedicated to Council will be undertaken - as per Council requirements prior to handover of assets.
Page 23
-| located on $10.1 The location, design and construction of stormwater drainage __ structures is in f | accordance with Sections 4 and 5 =| of PSP5, Engineering Design -~| Standards ~ Roads, Drainage and Earthworks; | AND $10.2 Where infrastructure is private land an easement is dedicated over the infrastructure in accordance with | Section 4 of PSP5 Engineering Design Standards - Roads, Stormwater drainage planning, design and construction is/will be in accordance with Section 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks, as per the Stormwater Management plan prepared by Brown Consulting and as per future Operational Works design. Where infrastructure is located in private property easements will be dedicated to Council as per Section 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks. Drainage and Earthworks. —| AND $11.1 The following infrastructure components already existing at the frontage of the site or are provided at the developer's expense: | (a) full width sealed road; (b) concrete kerb and channel where appropriate; (c) forming and grading to footpaths; (d) vehicular kerb and footpath crossings; (e) aconstructed bikeway; (f) aconstructed footpath; (g) aconstructed carriageway; (h) required alterations to public utility mains, services or installations; (i) . construction of any required alterations to public utility | &) mains, services or installations; | G) stormwater drainage works; and installation of electrical conduits. ‘| $11.2 Road and drainage design and construction is in accordance with Sections 3 and 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks. The frontage of the site is/will be provided with all required frontage works. Road and stormwater design and construction will be undertaken in accordance with Sections 3 and 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks . and the Queensland Urban Drainage Design Manual, during the Operational Works Phase.
Page 24
No solution provided. The development works are proposed to be undertaken in one stage. $14.1 Any alteration or repair to infrastructure as a result of the development are completed at the developer's expense. All alterations/repair to existing infrastructure associated with the development of this site will be at the developer's expense.
Page 25
= a APPENDIX F WATER SUPPLY AND SEWERAGE RETICULATION CODE Proposed Measures
Page 26
DIVISION 21: WATER SUPPLY AND SEWERAGE RETICULATION CODE Table 14-59 Water Supply ‘| $1.1 Water supply infrastructure =| is designed in accordance with Section 3 of PSP 6 — Engineering Design Standards — Water and Sewerage and As Constructed data submitted in accordance with Section 7 of PSP 6 — Engineering Design Standards — Water and Sewerage. Water supply infrastructure will be designed in accordance with Section 3 of PSP 6 — Engineering Design Standards — Water and Sewerage during the Operational Works phase. As-constructed data for water supply infrastructure will be designed in accordance with Section 3 of PSP 6 — Engineering Design Standards — Water and Sewerage at the completion of construction. $2.1 Water supply infrastructure is constructed in accordance with Section 6 of PSP 6 — Engineering Design Standards — Water and Sewerage; AND $2.2 Erosion and.Sediment control measures are designed and implemented in accordance with the Institution of Engineers Australia (Qld Division) Soil Erosion and Sediment Control — Guidelines for Queensland Construction Sites. Water supply infrastructure will be constructed in accordance with Section 6 of PSP 6 - Engineering Design Standards — Water and Sewerage during the Operational Works phase. Erosion and sediment control measures will be implemented as per Drawing No. NO7046-02 by Brown Consulting. No solution provided. On and off maintenance inspections and testing of all assets to be dedicated to Council will be undertaken as per Council requirements prior to handover of assets. No solution provided. All required technical documentation associated with water supply infrastructure will be provided in the Operational Works submission. $5.1 The footing of any building _| or structure is located clear of the zone of influence but no closer -| than 1.5m (measured horizontally) from infrastructure including sewers, water mains and | stormwater structures. AND $5.2 A registered easement in favour of Council is created over all underground infrastructure located in private property; AND During Operational Works design the water supply infrastructure shall be positioned to ensure all buildings are located outside the zone of influence. An easement will be registered in Council’s favour for any water supply infrastructure located within private property as per Council's requirements.
Page 27
'| $5.3 The width of the easement is the greater of 3m or the width of the zone of influence; AND $5.4 The easement is centred : over the centreline of the infrastructure. $6.1 Infrastructure is designed and constructed on the preferred alignments in accordance with Section 3 of PSP 6 Engineering Design Standards — Water and Sewerage. Water supply infrastructure will be designed and constructed on Council’s preferred alignment in accordance with Section 3 of PSP 6 — Engineering Design Standards — Water and Sewerage during the Operational Works phase. $7.1 Any alterations or repairs to infrastructure as a result of the development are completed at the developer's expense. All alterations/repair to existing infrastructure associated with the development of this site will be at the developer's expense. $1.1 Sewerage Reticulation infrastructure is designed in accordance with Sections 4 and 5 of PSP 6 — Engineering Design Standards — Water and Sewerage. Sewerage reticulation infrastructure will be designed in accordance with Sections 4 and 5 of PSP 6 — Engineering Design Standards — Water and Sewerage during the Operational Works phase. $9.1 Sewerage Reticulation infrastructure is constructed in accordance with Section 6 of PSP 6 — Engineering Design Standards — Water and Sewerage and As Constructed data submitted in -| accordance with Section 7 of PSP 6 — Engineering Design Standards — Water and Sewerage; AND Sewerage infrastructure will be constructed in accordance with Section 6 of PSP 6 — Engineering Design Standards — Water and Sewerage during the Operational Works phase. As-constructed data for sewerage supply infrastructure will be designed in accordance with Section 7 of PSP 6 — Engineering Design Standards — Water and Sewerage at the completion of construction.
Page 28
_| $9.2 Erosion and Sediment control measures are designed and implemented in accordance with the Institution of Engineers Australia (Qld Division) Soil Erosion and Sediment Control — Guidelines for Queensland Construction Sites. Erosion and sediment control measures will be implemented as per Drawing No. NO7046-02 by Brown Consulting. No solution provided. On and off maintenance inspections and testing of all assets to be dedicated to Council will be undertaken as per Council requirements prior to handover of assets. No solution provided. All required technical . documentation associated with sewerage reticulation infrastructure will be provided in the Operational Works submission. $12.1 The footing of any building or structure is located clear of the zone of influence but no closer than 1.5m (measured horizontally) from infrastructure including sewers, water mains and stormwater structures. AND $12.2 A registered easement in favour of Council is created over all underground infrastructure located in private property; AND $12.3 The width of the easement is the greater of 3m or the width of the zone of influence; AND $12.4 The easement is centred over the centreline of the infrastructure. During Operational Works design the sewerage reticulation infrastructure shall be positioned to ensure all buildings are located outside the zone of influence. An easement will be registered in Council's favour for any water supply infrastructure located within private property as per Council's requirements. $13.1 Infrastructure is constructed on the preferred alignments in accordance with Section 4 of PSP 6 — Engineering Design Standards — Water and Sewerage. Sewerage reticulation infrastructure will be designed and constructed on Council's preferred alignment in accordance with Section 4 of PSP 6 -— Engineering Design Standards — Water and Sewerage during the Operational Works phase. $14.1 Any alterations or repair to infrastructure as a result of the development are completed at the developer's expense. All alterations/repair to existing infrastructure associated with the development of this site will be at the developer's expense.
Page 29
= “BROWN CONSULTING APPENDIX G ENGINEERING DRAWINGS
Page 30
ESSENCE OF PEREGIAN BEACH
SCANLON PROPERTY GROUP
DRAWING INDEX N
NO7046-01 DRAWING INDEX, LAYOUT AND LOCALITY PLAN wz
NO7046-02 SEDIMENT AND EROSION CONTROL PLAN xc
NO7046-03 BULK EARTHWORKS PLAN aT
N07046-04 SEWER RETICULATION & WATER COONECTION LAYOUT PLAN mo
= 2s ee A ”
ee ee es
‘ Som STS SSS Se eee eee ee eee
4 Tree Line
‘ ‘
‘ \
DEVELOPMENT SUMMARY \ \ / Cy
\ \
978m? OF COMMERCIAL GROUND FLOOR AREA 1 \ \
(RETAIL) 4 \ ‘ oO
\
978m? OF COMMERCIAL FIRST FLOOR AREA ‘ ‘
(OFFICE) \
A Poperbarts
66 ACCOMODATION UNITS [APARTMENTS} ‘
A
34 ACCOMODATION SHACKS (CABINS) 147
1 CARETAKERS UNIT
EASTERN BEACHES LOCALITY
SEMI-ATTACHED HOUSING €
é
af
eo
zs
>
o
: 2
LOCALITY PLAN
RP DESCRIPTION “?
LOT 76 on DP175024
DAVID LOW WAY, PEREGIAN
— ‘DATE: 28-66-2007 TRE: 1228
Tat [care [mame] ene crane [oemon comox ‘scan Cua) WACROFLD Na | ABOOCIATED COMMA TANTS ‘DRAWOIO THLE
eT SURVEYOR, PMM GROUP SCANLON PROPERTY GROUP DRAWING INDEX, LAYOUT &
rk 7H3 Aun Street, Forbuce ¥
6 wn so n mm Ph (07) 3237 8699 Fax (0?) 3237 0833 LOCALITY PLAN
a eee Se = | oss | ESSENCE OF a —_
i RENT TWAS ea TOK Fb UL OF ARN CSELTAG LD PTY LTD PEREGIAN BEACH NO7046-01
Page 31
Sediment control fabric to be
‘Propex’ or similar approved
wT:
WETLANDS TO BE EXCAVATED DURING BULK
EARTHWORKS TO ACT AS SEDIMENT BASINS
THROUGHOUT CONSTRUCTION
Posts at 2.0m ctrs
. to be steel picket
or 50 x 50 hardwood
Top edge to be suitably aa
supported between posts.
sm
Fi
450 /| 700 Approx
200 x 200
trench
SILT FENCE DETAIL
NTS
Posts af 2.0m ctrs
to be steel pickets
Sediment control Fabric to be
‘Propex’ or similar approved
Top edge to be suitably
supported between posts.
4500 APPROX
Faperbarks
>\eS Hy
200 x 200 Fy) .
Trench . a 3 \ <|
\ x
SILT/BARRIER MESH FENCE DETAIL ‘ BR ow ri
NTS ak ( iT ‘
a8
8 GED
& x
‘ a tre
DEVELOPMENT suMMaRy Ss & (Se
~ | f
978m? OF COMMERCIAL GROUND FLOOR AREA 4 TEHPORARY FEDIENT SS lac
(RETAIL) 1 A }
‘ \ 4 H
- 978m? OF COMMERCIAL FIRST FLOOR AREA f
(OFFICE) \
66 ACCOMODATION UNITS (APARTMENTS) ‘ e i /
A x8 i
34 ACCOMODATION SHACKS (CABINS) ‘ 8 3 is eos
1 CARETAKERS UNIT Wo eee /
A 4 OF¢ a ,
EASTERN BEACHES LOCALITY y\ 4 bss nd p INS
1 an * peiGrtssed Arec
SEMI-ATTACHED HOUSING 1 g KS . ay
‘ Trl Ey
a candle
LEGEND a ee ee oe i
‘TEHPORARY SEDIMENT BASID m
_y yo SILT FENCE/BARRIER MESH FENCE OR sit Fence
{AS DIRECTED BY SITE ENGINEER) /
____ SILT FENCE OR (AS DIRECTED 147 /
BY SITE ENGINEER]
+> —+> —-» — DIVERSION DRAIN
——l2.._______ NATURAL SURFACE CONTOURS
PROPOSED DRIVEWAY
TEMPORARY SEDIMENT BASIN
ote DATE: 20-06-2007 THE: 12:28
(Nosek8-t
eae smcemee peTans enn crm ’ meee | SuRvevoR. PHM GROUP - ee SE
ae 1h Se, Ve pmm SCANLON PROPERTY GROUP SEDIMENT AND EROSION
ie wn st 0 am Ph {07} 3237/8699 Fox (07) 3237 6833 CONTROL PLAN
omen a PRCT Me weno
E veo *| loose ESSENCE OF oar a
a RENT THOMAS FOE TA? Fl tl BOLE OF Ni CONRAN LD) PTY LTD PEREGIAN BEACH NO7046-02
Page 32
co
BASEMENT
Carus REFER ARCHITECTS DRAWHHISS FOR BUILDINGS
N
eee ef BLO208
40 =~
SECTION (AN i
© \\snnee [ !
BASES
REFER ARCHTEDTS DRAWINGS FOR BULDIRGE
ee
SECTION
CABS eAsEhENT
* HEFER ARUDTECIS DRAWINGS FO Suk BENGE | COMMER AL MAT as
Foperbarks
RL. 4.98
SECTION £ E 5
1500 1) 5D 1 2 AL
no 5
TOSS Gnd Ferry
Het streq
Read G
NOTE
NATURAL SURFACE IS TO REMAIN AS
THERE (S NO FLOOD RISK. MINOR
‘GROUND SHAPING AND BASEMENT
EXCAVATION ONLY
rar
of Trees
DEVELOPMENT SUMMARY.
978m? OF COMMERCIAL. GROUND FLOOR AREA
(RETAIL)
l2ay
O88 Ind Fern
Area cy,
Wet Are,
Reed Gr
978m? OF COMMERCIAL FIRST FLOOR AREA
(OFFICE)
66 ACCOMODATION UNITS (APARTMENTS)
34 ACCOMODATION SHACKS {CABINS}
1 CARETAKERS UNIT
EASTERN BEACHES LOCALITY
SEMI-ATTACHED HOUSING
LEGEND
oe oe es em PROPOSED STAGE BOUNDARY
pi
at NATURAL SURFACE LEVEL
~~ —___ SURFACE CONTOUR
BULK EARTHWORKS
PLAN
=
SCANLON PROPERTY GROUP
L. onan DATE: 28-06-2007 THE: (2:28
e's RUSK
(cats tase] _ pare Some There? ors i
pmo CCH SURVEYOR: PMM GROUP
CE
743 Ann Street, Fortitude V
Ph (07) 3237 8899 Fox (07) 3237 8833
Ss a 0 2 Al paowet tte. raeD
No7046 ESSENCE OF
PEREGIAN BEACH
BRETT THOMAS REA 7862 FOR 6 C8 DOME OF AUR CONSULTING (OLD) PTY 70.
en NO7046-03
aaaaa
i
i
if
a
Page 33
as
MANHOLE No. hsp "A
MANHOLE TYPE/DROP s\< 3|<
MANHOLE COVER 3 3
JUNCTION LINE NO.
JUNCTION DROP TYPES
I
Paperbarks
“ 4 OSSIBLE HOUSE DRAIN
147 {1 suasecr to anionic
4 "t PROPERTY OWNERS CONSENT f
&
e
xo
&8
eS
D
@
ges
5
PRIVATE PROPERTY 3S
LOCATION vee
se
eee
OTE
DIAMETER 150% _ uPVC ese
CLASS SNB £8 .
&
£ “
GRADE Lin 15.8 ® us
/12.0 Top WARN NS
DATUM RL - BY NOOSA SHIRE COUNCL
¢ AT DEVELOPERS EXPENSE
7300 ct aa
LENGTH / DAVID LOW WAY
147
DEPTH TO elm e s
INVERT ale 3 A
ie x DEVELOPMENT SUMMARY ia
INVERT LEVEL Pd 2 978m? OF COMMERCIAL GROUND FLOOR AREA &
ais 3 (RETAIL)
FINISHED z Pa 978m? OF COMMERCIAL FIRST FLOOR AREA
SURFACE LEVEL a a (OFFICE)
LEGEND
CHAINAGE s s 66 ACCOMODATION UNITS [APARTNENTS)
&
3 R
= & 34 ACCOMODATION SHACKS (CABINS) NOTE: tent EXISTING SEWER
sara Se
LINE 1 4 CARETAKERS UNIT ND SUBECT TO OPERATIONAL fe PROPOSED tag SEWERAGE
EASTERN BEACHES LOCALITY
1: 1000 105 0 0 2030 40S AT NOTE: : DESIGN CONTOURS
1: 2000 TAL BS SEMI-ATTACHED HOUSING ALL INTERNAL WATER AND SEWERAGE TO BE TR
DESIGNED AND CONSTRUCTED IN ACCORDANCE PROPOSED WATER RETICULATION
f:10 1 0 4 2003 SAL WITH THE PLUMBING CODE AS 3500. 7
112) 3
FALE: [email protected] GATE: 28-06-2007 TIME: 12:28
[Xref's: NOSOGE-tit
ar [ones [rma] sane — SR TTRETT a Saar Tr TE
wm {ao} | nam (MECMENT CETARS cnx -
n Fae Seek Rothe eke SCANLON PROPERTY GROUP SEWER RETICULATION &
: wm wos 6 2 wa Ph (07) 3237 8899 Fax (07) 3237 8633 TORT WATER CONNECTION
e panne cate] 59 aa 5 rower mm | seracwm ESSE! LAYOUT PLAN
No7046 NCE OF en
F RU Toth ron Ta Fv Oo es OF fo Cont LDN PY LTD PEREGIAN BEACH NO7046-04
Used in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.