Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
\ abi identified PSP3— Landscaping Plants and Guidelines. AND $4.2 Earthworks are undertaken only during the hours of 7am to 6pm, Monday to Friday and 7am | to 6pm on Saturday. No work is undertaken on Sunday or public -| holidays. | $5.1 Cleared vegetation is. _| transported off-site for disposal in | an approved green waste disposal facility; OR $5.2 Cleared vegetation is mulched onsite and reused for landscaping of the finished development; OR $5.3 Cleared vegetation is disposed of for the purpose of _| firewood. : All cleared vegetation will be transported off-site for disposal in an approved green waste disposal facility or alternatively mulched on site and used for landscaping of the finished development. $6.1 The fill material is sold clean earth, free of putrescible or refuse material, vegetation, acid sulfate ‘| soils, building or construction | material or other material of contaminants. OR $6.2 The site is not on the contaminated land register. All earthworks will be supervised to a Level 1 standard to avoid contamination of land. The site is not on the contaminated land register. No solution provided. No haulage of material to or from the site is proposed. | $8.1 All earthworks, including cut and fill batters, retaining walls etc are contained within the subject site. All earthworks are contained within the subject site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.