20517 App I.pdf [As Published] · 132007.1259
BROWN CONSULTING (QLD) PTY LTD —- SUNSHINE COAST COMMONS. 3.0 EXISTING SERVICES All proposed relocation and adjustments to existing services will be undertaken in accordance with Sections 3, 4 and 5 of PSP 6 — Engineering Design Standards — Water and Sewerage and Section 4 of PSP 5 -— Engineering Design Standards — Roads, Drainage and Earthworks. As-constructed data for both water and sewer will be submitted in accordance with Sections 3 and 7 of PSP 6 — Engineering Design Standards — Water and Sewerage. Easements will be registered in favour of Council for all sewer, water and stormwater infrastructure in accordance with Council’s requirements. Proposed Measures for Council's Existing Services Code can be found in Appendix C. 3.1. Water Reticulation It is proposed that water supply to the site will be obtained via connection to an existing 150mm diameter water main on the Eastern Side of David Low Way as detailed in the Water Supply Analysis prepared by John Wilson and Partners (refer Appendix H). The connection to the existing water main will be made by Council at the developer’s expense and the external extension of the watermain will be tunnel bored under David Low Way to avoid any disturbance to the existing road network. It is proposed that all internal water reticulation will be designed as per AS 3500 - 1998 National Plumbing and Drainage as this is a group title development. Proposed Measures for Council's Water Supply and Sewerage Reticulation Code can be found in Appendix F. Please refer Drawing Number N0O7046-04 for the Water Reticulation Layout Plan. 3.2. Sewerage Reticulation The site is currently serviced by sewer lines 1A and 1B. The commercial development towards the Northeast corner of the site is also currently serviced by this sewer line. / It is proposed to realign this sewer along the Northern boundary of the site and make adjustments to the internal sewer reticulation within the commercial site (refer Drawing Number NO7046-04 for the Sewer Reticulation Layout Plan). Lines 1A and 1B would remain online until such a time as the proposed sewer is constructed and accepted on maintenance by Council and the live connection for the commercial property can be made. This would be subject to discussion with the adjoining property owner but we do not foresee that this will be an issue. "ESSENCE OF PEREGIAN, DAVID LOW WAY, PEREGIAN PaGE 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.