Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
\/ Finn BROWN CONSULTING (QLD) PTY LTD ~ SUNSHINE COAST POMMUETENS. The frontage of the site is/will be provided with all frontage works as required by Council. Frontage works will be designed and constructed during the Operational Works phase of the project. It is proposed that the development works be undertaken in one stage. All alterations/repairs to existing services/infrastructure associate with the development site will be at the developer’s expense. Proposed Measures for Council’s Transport, Roads and Drainage Code can be found in Appendix D. 6.0 WASTE MANAGEMENT During construction all waste generated will be disposed of in accordance with PSP 11 and adequate area will be provided for storage and collection of all classes of waste material, as required. : Proposed Measures for Council’s Waste Management Code can be found in Appendix E. 7.0 CONCLUSION The proposed development is in accordance with all Council codes addressed in this report. There are no engineering constraints associated with this development. “ESSENCE OF PEREGIAN, DAVID Low WAY, PEREGIAN Pace 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.