Skip to the record
Every meeting, every word.

Council archive · source document

09/0363 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132009.363

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

»,
INTEGRATED PLANNING ACT 1997 Part D, Version 3.2

 

 

Mandatory Information

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. Confirm that the following mandatory information accompanies this application:
Confirmation of. |. 2
todgement, Method of lodgement
For. all applications “ , ‘ _
{i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, 4] Confirmed over the counter
number of seats, capacity of storage area)
When the. application involves reuse of existing buildings .
(ii) Plans showing the size and location of the buildings to be reused CJ Confirmed
EX} Not applicable
When the apptication involves new building work? . “ eS age
(ii) Plans showing the size and location of the proposed new building work &X Confirmed
- over the counter
[] Not applicable
When the application involves reuse of other.existing works;, ' ; yey aw Lo '.
(iv) Plans showing the nature and location of the works to be reused im] Confirmed
[X] Not applicable
© When the application involves new: operational: work == 7 9 Sere apr en ar eh ee ieee gen
(v) Plans showing the nature and lacation of the proposed new operational works &X] Confirmed
7 over the counter
(] Not applicable
OFFICE USE ONLY
Date received Reference numbers
Advice for completing Part D
General advice
. Part A must also be completed for all IDAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following a respanse there is a statement to go directly to
another question.
° When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the

process from the Information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form
Electronic Funds Transfer (EFT) payment notification to this application.

Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
© development to occur - a subsequent application for a development permit must be sought.

 

 

Table D If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the
operational work if approval for the operational work has not been applied for in this application or in a separate application.

 

 

 

1 This form is also used for material change of use assessable against the land use plan for Calms airport tand or Mackay airport land. Wherever planning scheme is
mentioned, take it to mean the land use plan for the airport land.

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0363 - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.