Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2015-03-31 I&S Committee - Item 5 - Attachment 2 - Munna Pt Bridge Repairs Design Drawings

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Zn                                                                                                                                                                                                                                                          Zn
                                       Oct                                                                                                                                                                                                                                                         Oct
                                       no                                                                                                                                                                                                                                                          no
                                       ZZ                                                                                                                                                                                                                                                          ZZ
                                       ow                                                                                                                                                                                                                                                          ow
                                       bw                                                                                                                                                                                                                                                          bw
                                       x                                                                                                                                                                                                                                                           x
                                       ua                                                                                                                                                                                                                                                          ua
                                       Ore                                                                                                                                                                                                                                                         Ore
                                       ae                                                                                                                                                                                                                                                          ae
                                       OD                                                                                                                                                                                                                                                          OD
                                       ua                                                                                                                                                                                                                                                          ua
                                       =o                                                                                                                                                                                                                                                          =o
                                       aor                                                                                                                                                                                                                                                         aor
                                       150                                                                                                                                                                                                                                                         150
                                                                   2310                                                                                                                                                                                                2310
                                       |  f                                                                                                                                                                                                                                                      T    |
                                                                                                                            FILL CRACKS WITH
                                                                                                                            UNDERWATER EPOXY - SEE
                                                                                                                            DETAILA
                                                   FORM UP ENDS AND                                                                                                                                  FILL CRACKS WITH                                                     FORM UP ENDS AND
                                                   POUR REPAIR MORTAR                                                                                                                                UNDERWATER EPOXY - SEE                                               POUR REPAIR MORTAR
                                                   TYPE B.                                                                                                                                           DETAILA                                                              TYPE B.

                                         |                                                                                                                                                                                                                                                                                               Ww

                                                                                                                                                                               CONSTRUCTION SEQUENCE 2 - STEP C - EL                                 VATION                                                                                  eo
                                                                                                                                                                               (PIERS 2 & 6)                                                                                                                                           Ww
                                                                                                                                                                                1:40 UNREDUCED AT A3
                                                                                                                                                                                1:20 UNREDUCED AT At                                                                                                                             Ke
                                                                                                                                                                               °                                                                                                                                           s
                                                                                                                                                                                  ONSTRUCTION STEPS :
                                        50 MINIMUM                                                                                                                                 REMOVE BARNACLES / DEBRIS FROM PILE CAPS AND
                                                                                                                                                                                   WATER BLAST CLEAN.
                                                                                                                                                                                2  FILL FORMWORK WITH FRESH WATER TO EXPEL SALT
                                                                                                                                                                                   WATER.
                                                                                                                                                                                   LEAVE FORMWORK FLOODED WITH FRESHWATER FOR 2
                                                                                                                                                                                   HOURS MINIMUM.                                                                                         ws                    O
                                                                                                                                                                                   AT LOW TIDE, EMPTY FORMWORK USING REMOVAL PLUGS
                                                                                                                                                                                   AND OR "SLURPY" PUMP.
                                                                                                                                                                                   AT LOW TIDE , (WATER LEVEL TO BE BELOW UNDERSIDE
                                                    EPOXY(REFER NOTE PT1, DRG 02600-S01                                                                                            OF FORMWORK) COMMENCE PLACEMENT OF REPAIR                                                                             ©
                                                                                                                                                                                   MORTAR TYPE B (PUMPABLE CONSISTENCY)
                                                                                                                                                                                   LEAVE FORMWORK IN PLACE FOR 24 HOURS MINIMUM
                                                                                                                                                                                   AFTER FINISHING OF POUR.
                                                           FACE OF
                                                                                                                                                                                   COMMENCE FORMWORK STRIPPING DURING FALLING
                                                           PILECAP
                                                                                                                                                                                   TIDE. TIME STRIPPING WORKS TO BE COMPLETE AT LOW
                                                                                                                                                                                   TIDE.
                                                                                                                                                                                   IMMEDIATELY AFTER FORMWORK STRIPPED (AT LOW
   EXISTING REINFORCEMENT                                                                                                                                                          TIDE), CURE ALL PILECAP SURFACES PER CURING
                                                                                                                                                                                   METHOD TYPE A.                                             a                 <
                                                                                                                                                                                   COAT ALL PILECAP SURFACES WITH COATING TYPE 1; AND
                        DETAIL A - CRACK REPAIRS                                                                                                                                   CURE PER CURING METHOD TYPE A.
                                                                                                                                                                                10 FILL STEEL COLUMNS WITH NITROGEN OR CEMENT
                                       4:40 UNREDUCED AT A3                                                                                                     fy                 GROUT TO REMOVE INTERNAL OXYGEN / CORROSION.
                                       4:20 UNREDUCED AT A1
                                                                                                                                                                                                                                                                                                INSTALL SACRIFICIAL GALVANIC
                                                                                                                                                                                                                                                                                                PROTECTION (EXTERNAL) ELECTRICALLY
                                                                                                                                                                                                                                                                                                CONNECTED TO PILE CAP REINFORCEMENT
                                                                                                                                                              Sa              Z4

                                                                                                                                      “Co                                                 “<C>

    NOTES:
                                                                                                                                     CONSTRUCTION SEQUENCE 2 - STEP D - ELEVATION
    1    PLEASE PRINT IN COLOUR.
    2    REFER TO DRAWINGS NO01 - N004 FOR PROJECT SPECIFIC NOTES.                                                                   (ALL PIERS)
                                                                                                                                     1:40 UNREDUCED AT A3
                                                                                                                                     1:20 UNREDUCED AT At

   COPYRIGHT ©                                                          Associated Consultants       Client                                      TOD                    =                 Drawn             Verified           Project                                                             Drawing Title
This drawing is subject to                                                                             fp] NOOSA COUNCIL                                                                  P COOKE           C DOWDING         BRIDGE REMEDIAL WORKS - REFERENCE                                   |PILE CAP REPAIR TYPE 2
copyright in accordance with the
agreement between Tod                                                                                                                                                                     Designed          Verified
Consulting pty Itd (tc) and tc's                                                                                                                                                          C DOWDING         MAY 2014          DESIGN - MUNNA POINT, NOOSA                                         SHEET 2                                        Drawing Number
client. This drawing shall only be 20.10.14] AMENDED AS CLOUDED  NV                                                                                consulting engineers                   Approved          RPEQ No            RDP                                                                                                               02600 -S010
used for this specific project.
                          5.9.14 AMENDED AS CLOUDED              NV                                                                                          Noosa: 07 5449 9600              QWDING        8339               LOCAL AUTHORITY NOOSA SHIRE COUNCIL
This drawing shall not be used 02.7.14 ISSUED FOR TENDER         PC                                                                                  Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337      Date               MCU APPROVAL                           HORIZ DATUM                          0   10   20  30   40  50   60
for construction until marked as                                                                                                                          PO Box 61, Noosaville, QLD 4566
‘issued for construction’ in the 26.6.14 ISSUED FOR REVIEW       Pc                                                                                 [email protected] www todconsulting.com      ©C20.10.14          ROL APPROVAL                           VERT DATUM AHD                       Aid|
revision description. Rev! Date Revision Description            Drawn                                                                                        ABN. 39 128 805 336                                               OPW APPROVAL                           RL                                     MEASUREMENT BAR - INCREMENTS IN mm
Log in to download the original file

2015-03-31 I&S Committee - Item 5 - Attachment 2 - Munna Pt Bridge Repairs Design Drawings(PDF, 12MB).pdf · 12.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.