2015-03-31 I&S Committee - Item 5 - Attachment 2 - Munna Pt Bridge Repairs Design Drawings

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

P9. INSTALLED PILE JACKETS AND REINFORCEMENT SHALL BE FLUSHED OF SALT WATER BY PUMPING IN SUFFICIENT   R5. BAR SHAPES AS SHOWN ON:TMR STANDARD DRAWING 1043, U.N.O.
      LOCKING COMPOUND (STEEL COLUMN  7471 ACTIVATOR +LOCTITE 272      MUST USE ACTIVATOR OR 272 WON'T
      FIXINGS - REFER DRG 02600-S005)                                  BOND SS PARTS TOGETHER                  FRESH WATER AT BOTTOM TO REPLACEMENT ENTIRE VOLUME OF PILE JACKET + 10%; NOT MORE THAN 30 MINUTES      R6. HOOKS AND COGS SHALL BE AS DETAILED ON:TMR STANDARD DRAWING 1044.
                                                                                                               PRIOR TO GROUT INSTALLATION.
                                                                                                                                                                                                                      R7. LAPS AND OTHER SPLICES IN REINFORCEMENT SHALL ONLY BE MADE AT THE POSITIONS SHOWN ON THE
      AC WATERPROOFING (SACRIFICIAL - 2 YEAR SRS ROADS “SEALCOAT” MICRO-SURFACING TO PROTECT DECK CONCRETE FROM P10. GROUT TO BE INSTALLED BY PUMPING IN AT BOTTOM OF JACKET, TO DISPLACE THE FRESH WATER.
      TARGET LIFE)                    SEALANT                          SALTS, WITHOUT REMOVING EXISTING                                                                                                               DRAWINGS UNLESS ALTERNATIVE OR EXTRA LOCATIONS ARE APPROVED IN WRITING BY THE SUPERINTENDENT.
                                      CONTACT: STAFFORD FALLEN, P: 3851 4808; DWs                              P11. A MINIMUM OF 10 PILE JACKETS SHALL BE OPENED 14-28 DAYS AFTER POURING, AND COMPLETED PILE         R8. DO NOT CUT REINFORCEMENT TO CLEAR PENETRATIONS, SLEEVES OR H.D BOLTS. DISPLACE REINFORCEMENT
                                      0418 737 384
                                                                                                               ENCASEMENTS SHALL BE INSPECTED BY UNDERWATER CAMERA OR DIVER. JACKETS SHALL BE RE-CLOSED (IF           SLIGHTLY AS NECESSARY AND PROVIDE CORRECT COVER TO THE PENETRATIONS, SLEEVES OR H.D BOLTS.
                                                                                                               POSSIBLE) AT THE COMPLETION OF THE INSPECTION. ENCASEMENTS WITH CONCRETE WITH CRACKS EXCEEDING LIMIT
      OPTIONAL TYPE B WATERPROOFING   INSTALL WATERPROOFING MEMBRANE TYPE B                                    GIVEN IN CONCRETE NOTE C7 MUST BE REPLACED OR REPAIRED. OBTAIN SUPERINTENDANT APPROVAL FOR             R9, REINFORCEMENT LAP SPLICE LENGTHS (MILLIMETRES) (U.N.O ON DRAWINGS)
                                                                       REMOVE EXISTING DWS.
      (NON-SACRIFICIAL                PER MRTS 84                      INSTALL WATERPROOFING MEMBRANE          SOLUTION BEFORE COMMENCING WORK.
                                                                       PER MRTS 84.                                                                                                                                   BAR LOCATION                                 DS500N BAR DIAMETER (mm)
                                                                       INSTALL NEW DG14 ASPHALT DWS AT
                                                                                                               CONCRETE:                                                                                                                                           12       16       20      24       28       32
                                                                       COMPLETION.
                                                                                                                                                                                                                                                                   LAP LENGTH (mm)
      DECK JOINTS IN ROADWAY (PIERS 1-6) GRANOR XJS JOINT SYSTEM       REMOVE EXISTING STEEL JOINT SYSTEM.                                                                                                            ALL                                          450      600      850     1200     1400     1750
                                      CONTACT: MICHAEL HEARD P: 0433 103 445 OR                                C1. CONCRETE WORKS TO BE IN ACCORDANCE WITH: TMR MRTS 70 CONCRETE, WITH THE FOLLOWING SPECIFIC
                                      5476 8202                                                                REQUIREMENTS
      DECK JOINTS IN FOOTPATH         LATHAM HHS-50 FLEXIBLE STAINLESS STEEL USE GR 316 STAINLESS FIXING BOLTS
                                      EXPANSION JOINT                                                          C2. CONCRETE STRENGTH, REINFORCEMENT COVER, SLUMP AND SURFACE FINISH SHALL BE AS FOLLOWS:              WELDED MESH                                  450mm LAP

      PT2. PRODUCT TRADE NAMES HAVE BEEN USED TO ESTABLISH A QUALITY REQUIREMENT. SUBMIT ALTERNATIVES FOR                                                                                                             WELDING OF REINFORCEMENT:
      REVIEW, BEFORE PROCUREMENT.
                                                                                                                                                                                                                      WR1. WHERE LAPPED SPLICES ARE NOT POSSIBLE, EXISTING REINFORCEMENT MAY BE SPLICED TO NEW
                                                                                                                                                                                                                      REINFORCEMENT USING FILLET WELDS.
      DIMENSIONS/LEVELS:
                                                                                                                                                             REO COVER                                                WR2. WELDING TO BE IN ACCORDANCE WITH AS/NZS1554 PART 3. HYDROGEN CONTROLLED WELDING PROCESSES AND
      L1, CONSTRUCTION TO BE SET OUT USING:SURVEY BENCHMARKS PROVIDED BY CONTRACTOR'S REGISTERED                                          fic (MPa) / AGGREGATE (mm) - ALL TARGET                                     LOW HYDROGEN ELECTRODES TO BE UTILISED. INTERPASS TEMPERATURE TO BE LIMITED TO 200 DEG.C.
      SURVEYOR                                                                                                        ITEM         EXP         SIZE (mm)       FACES   SLUMP (MM)        REQUIREMENTS
                                                                                                                                           $32 FIBRE CONCRETE                                                         WR3. WELDS TO BE CONTINUOUS FILLET, CATEGORY SP, ELECTRODES TO BE E48XX.
      L2, ALL LEVELS AND SETOUT POINTS ARE TO BE CONFIRMED ON SITE BY REGISTERED SURVEYOR PRIOR TO
                                                                                                                                         IMPREGNATED WITH 50MM
      CONSTRUCTION. ADVISE ANY DISCREPANCY BEFORE PROCEEDING.                                                                                                                                                         WR4. WELDS SHALL NOT BE PERMITTED WITHIN 3 BAR DIAMETERS OF THAT PART OF A BAR THAT HAS BEEN BENT AND
                                                                                                                                          VIRGIN POLYPROPYLENE
                                                                                                                    FOOTPATH              AT RATE OF 0.9KG/CU.M.                         BROOMED FINISH               RESTRAIGHTENED.
      L3. DIMENSION STANDARDS:
                                                                                                                  FIBRECRETE AT             STEEL FIBRES NOT
         -  REDUCED LEVELS, CHAINAGES AND COORDINATES ARE ALL IN METRES.                                             JOINTS        B2         PERMITTED         N/A       100                                         WRS5. WELD SIZE AND LENGTH SHALL BE AS PER TABULATED BELOW:
         -  ALL OTHER DIMENSIONS ARE IN MILLIMETRES.                                                            ALL MIXES TO BE TRIALLED PER TMR MRTS 70 CLAUSE 11.5, BEFORE
                                                                                                                COMMENCING SITE WORKS.                                                                                                  DS500N BAR DIAMETER (mm)
      L4, ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM.                                                                                                                                                                                    12           16            20           24           28            32
                                                                                                                ALTERNATIVE MIXES TO BE SUBMITTED FOR REVIEW                                                          WELD SIZE (mm)    6            8             10           12           14            16
      L5. DIMENSIONS SHALL NOT BE SCALED FROM DRAWINGS.
                                                                                                                                                                   ALL CONCRETE TO BE VIBRATED, UNO.                  WELD LENGTH (DOUBLE /2 SIDES x 60mm 2 SIDES x 80mm 2 SIDES x 100mm 2 SIDES x 120mm 2 SIDES x 140mm 2 SIDES x
                                                                                                                                                                                                                      LAP SPLICE)                                                                          160mm
      PROGRAMME AND CONSTRUCTION CONSTRAINTS:                                                                  C3. EXPOSED CONCRETE EDGES HAVING CONTAINED ANGLE OF LESS THAN 120°: PROVIDE 25mm FILLETS OR           WELD LENGTH (SINGLE 1 SIDE x 110mm 1 SIDE x 145mm 1 SIDE x 180mm 1 SIDE x 220mm 1 SIDE x 260mm 1 SIDE x
                                                                                                               CHAMFERS AS APPROPRIATE, UNO.                                                                          LAP SPLICE)                                                                          290mm
      PR1. CONSTRUCTION CONTRAINTS:
                                                                                                               C4. SUPPORT REINFORCEMENT ON CHAIRS AND SPACERS TO GIVE CORRECT CONCRETE COVER USING EXTRUDED
            A) REFER TO SPECIFICATION AND DRAWINGS FOR TRAFFIC LANE & LOAD LIMITS, PEDESTRIAN PATH ACCESS,     FIBRE CONCRETE BLOCKS (60MPa MINIMUM COMPRESSIVE STRENGTH) OR STAINLESS STEEL NIBS WELDED TO THE       EPOXYING OF REINFORCEMENT:
               AND MARINE TRAFFIC REQUIREMENTS                                                                 REINFORCEMENT
            B) CONTRACTOR'S SITE COMPOUND TO BE LOCATED IN NOOSA-TEWANTIN APEX BICENTENIAL PARK (CNR                                                                                                                  RE1.REINFORCEMENT MAY BE EPOXIED INTO CONCRETE IN THE FOLLOWING LOCATIONS:
               QUAMBY PLACE AND NOOSA PARADE). REFER TO PROJECT SPECIFICATION FOR DETAILS                      C5. JOINTS                                                                                                - WHERE SHOWN ON THE DRAWINGS
            Cc) FRESH WATER TO BE SUPPLIED BY NOOSA COUNCIL - REFER TO PROJECT SPECIFICATION FOR DETAILS          -  PROVIDE JOINTS ONLY WHERE SHOWN ON THE DRAWINGS. OBTAIN RPEQ ENGINEER APPROVAL FOR ANY JOINT     RE2. EPOXY REQUIREMENTS:
                                                                                                                     CHANGES BEFORE CARRYING OUT WORK.
                                                                                                                  -  POUR JOINTS IN PILECAPS:
      TEMPORARY WORKS:                                                                                                                                                                                                EPOXY TYPE                     HILT! HIT-RE 500
                                                                                                                        o SCABBLE THE FACE OF ALL CONCRETE AGAINST WHICH NEW CONCRETE/MORTAR/GROUT IS TO BE
                                                                                                                                                                                                                      BAR DIAMETER (mm)              12      16     20      24      28     32
                                                                                                                           POURED UNO.CLEAN OFF DUST AND CONTAMINANTS BEFORE NEW POUR.
      T1. MAINTAIN THE WORKS IN A SAFE, STABLE CONDITION AT ALL TIMES. ENSURE WORK ITEMS/PARTS ARE NOT                                                                                                                HOLE DIAMETER (mm)             16      20     25      30      35     40
                                                                                                                        0  CONSTRUCTION JOINTS TO BE COATED WITH BONDING AGENT IF SPECIFIED ON DRAWINGS. BONDING
      OVER-STRESSED AT ANY TIME.                                                                                                                                                                                      HOLE DEPTH/EMBEDMENT (mm)      REFER DRAWINGS
                                                                                                                           AGENT: PARCHEM "NITOBOND EP", PREPARED AND INSTALLED PER MANUFACTURER SPECIFICATION.
                                                                                                                                                                                                                      HOLE CLEANING                  HOLES TO BE BLOWN/VACCUMED AND DRY
      T2. CONTRACTOR'S RPEQ TO CERTIFY DESIGN AND CONSTRUCTION FOR TEMPORARY WORKS: STRUTS, PROPPING,                      NEW CONCRETE TO BE APPLIED WHILE BONDING AGENT IS TACKY. IF BONDING AGENT BECOMES
      FORMWORK STRIPPING AND PROPPING PROCEDURES, TIE BACKS, PROTECTION WORKS, DE-WATERING SYSTEMS,                        TACK-FREE, APPLY SECOND COAT BEFORE CONCRETE.                                              LOAD TESTS OF BARS             REFER DRAWINGS
      FORMWORK, EARLY LOADING OF CONCRETE AND THE LIKE.                                                        C6. FORMWORK TO REMAIN IN POSITION FOR FOLLOWING MINIMUM TIMEFRAMES AFTER FINISHING OPERATIONS         WELDING OF BARS EPOXIED INTO   NOT PERMITTED - WILL CAUSE FAILURE OF EPOXY
                                                                                                                                                                                                                      CONCRETE
                                                                                                               COMPLETE, UNO:
      EXISTING SERVICES:
                                                                                                                  -  PILECAPS: REFER DRAWINGS 14500-S008 AND 14500-S010
      ES1. LOCATE SERVICES BEFORE STARTING: SERVICE LOCATIONS SHOWN ON DRAWINGS ARE APPROXIMATE ONLY.             -  PILE ENCASEMENTS: PREFERABLY USE PERMENANT PILE JACKETS AS FORMWORK. IF TEMPORARY FORMWORK       STEELWORK:
      PROTECT SERVICES FROM DAMAGE.                                                                                  IS REQUIRED FOR THE CONTRACTOR'S METHODOLOGY, FORMWORK SHALL REMAIN AROUND PILE                  $1. ALL STEELWORK IS TO BE EXECUTED IN ACCORDANCE   THE CURRENT EDITION OF MAIN ROADS STANDARD
                                                                                                                     ENCASEMENTS FOR 120 HOURS (5 DAYS) MINIMUM.                                                      MRTS 78 "FABRICATION OF STRUCTURAL STEEL  K"
      EROSION & SEDIMENT MANAGEMENT AND WATERWAY PROTECTION:
                                                                                                               C7. CONCRETE SHALL BE CURED IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS AND THE STANDARD (REFER      $2. TWO COPIES OF SHOP DETAIL DRAWINGS A         BMITTED FOR APPROVAL PRIOR TO COMMENCING
                                                                                                               NOTE C1):                                                                                              FABRICATION
      E1. REFER TO JOB SPECIFICATION
                                                                                                               PREFERRED CURING METHOD:                                                                               $3. FILLET WELDS SHALL BE 6 mm, C4     P. U.N.O
      PILE ENCASEMENT:                                                                                               WHILST WORKING: SPRAY WITH ALIPHATIC ALCOHOL AFTER FIRST SCREED, AND AGAIN AFTER EACH FINISHING  $4, ALL WELDING ELECTODES TO B       4918 OR W50X TO AS 4855, U.N.O.
                                                                                                                     OPERATION
      P1, PILE ENCASEMENTS ARE TO BE PROVIDED FOR TWO PURPOSES;                                                                                                                                                       $5. 100% OF ALL WELDS SHALL BE      EXAMINED. 10% MINIMUM SHALL BE SUBJECTED TO ULTRASONIC OR
         A) TO RESTRAIN ASR (ALKALI SILICA REACTION) OUTWARD-BURSTING STRESSES THAT WILL BE INDUCED BY THE           PILECAPS: REFER DRAWINGS 14500-S008 AND 14500-S010                                               MAGNETIC PARTICLE TESYNG.
            ORIGINAL PILES                                                                                           PILES: IF JACKETS USED, KEEP JACKETS CLOSED PERMENANTLY, APART FROM SHORT PERIODS FOR            $6. ALL STEELWORK UNL 'S OTHERWISE NOTED, SPECIFIED OR APPROVED, SHALL BE COATED IN ACCORDANCE WITH
         B) TO PROVIDE 100% OF THE REQUIRED LOAD-CARRYING CAPACITY FOR THE BRIDGE                                    INSPECTIONS. IF FORMWORK USED, REFER C6.                                                         THE PRODUCTS LIST      OTE PT1.
      P2. PILE ENCASEMENT WORKS TO BE IN ACCORDANCE WITH: TMR MRTS 63 CAST-IN-PLACE PILES AND THE FOLLOWING          FOOTPATH JOINTS (REFER 02600-S012): OPTION 1 - TO BE CURED UNDER PLASTIC, LAPPED AND TAPED. HOSE
      SPECIFIC REQUIREMENTS.                                                                                         WITH WATER ONCE DAILY UNDER PLASTIC AND RETAPE; OR
                                                                                                                     OPTION 2 - TO BE CURED USING PLATINUM CURE-IT CURING COMPOUND TO MRTS70 CLAUSE 24.3
      P3. CONSTRUCTION CONSTRAINTS: NO SEDIMENT OR CEMENTITIOUS MATERIALS TO ENTER WATERWAY
                                                                                                                     REQUIREMENTS.
      P4. ENCASEMENT JACKET TYPE: PREFERABLY PERMANENT AND CONSTRUCTED USING DURABLE MATERIALS THAT DO         REQUIRED CURING PERFORMANCE: CRACKS IN CONCRETE (90 DAYS AFTER PLACEMENT) SHALL NOT EXCEED 0.1mm         Ss                   >
      NOT CORRODE IN SALT WATER - PILEJAX “JOINLOX” OR APPROVED EQUAL.
      P5. DESIGN ULTIMATE LOADS: PILE ENCASEMENTS TO ACHIEVE THE FOLLOWING CAPACITIES - COMPRESSION 1230kN;    (BARELY VISIBLE).                                                                                                          KN
      TENSION 520kN; ASR BURSTING STRESSES FROM ORIGINAL PILE 3.25MPa; BENDING MOMENT 135kNm DURING PEAK       CONCRETE WITH CRACKS EXCEEDING ABOVE LIMIT MUST BE REPLACED OR REPAIRED. OBTAIN SUPERINTENDANT
      COMPRESSION AND 70kNm DURING PEAK TENSION.                                                               APPROVAL FOR SOLUTION BEFORE COMMENCING WORK.
      P6. REQUIRED PILE ENCASEMENT TOLERANCES:                                                                 REINFORCEMENT:                                                                                                     Re
      JACKET DIMENSIONS: OUTSIDE CIRCUMFERENCE -0MM, +10MM WHERE +ve VALUE INDICATES INCREASED SIZE            R1. REINFORCEMENT SHALL CONFORM WITH:MRTS71 "REINFORCEMENT STEEL"                                            s
      OUT-OF-ROUND < 2% OF DIAMETER
                                                                                                               R2. ALL REINFORCEMENT TO BE ACRS (AUSTRALIAN CERTIFICATION AUTHORITY FOR REINFORCING STEEL) CERTI
      REINFORCEMENT COVER: -Smm, +10mm OF SPECIFIED VALUE, WHERE +ve VALUE INDICATES INCREASED COVER           THE DESIGN ENGINEER RESERVES THE RIGHT TO REQUEST ACRS CERTIFICATES AT ANY TIME.
      P7. FOUND PILE ENCASEMENTS AT 500MM BELOW THE CANAL BED, AS SHOWN ON DRAWING 02600-S003, UNLESS          R3. ALL EXISTING AND NEW REINFORCEMENT CAGES TO BE MADE ELECTRICALLY CONTINUOUS, BY T, WEL       &
      APPROVED BY THE DESIGN ENGINEER.                                                                         SUITABLE ALTERNATIVE, FOR SACRIFICIAL GALVANIC PROTECTION AND FUTURE/OPTIONAL CATHO! PI
      P8. INSTALLED ENCASEMENT REINFORCEMENT SHALL NOT BE LEFT IN SALT WATER FOR LONGER THAN 4 HOURS           R4. REINFORCEMENT SHALL BE GRADE DS500N HOT ROLLED HIGH YIELD BARS TO AS 4671. U.N. RI "    S ARE
      (PRIOR TO FLUSHING JACKET WITH FRESH WATER AND INSTALLING GROUT). STEEL REINFORCEMENT IN SALT WATER      SPECIFIED, THESE SHALL BE ROUND BARS GRADE R250N                                             ©
      LONGER THAN THIS PERIOD SHALL BE REMOVED AND HYDRO-BLASTED WITH FRESH WATER.
                                                                                                                                                                                     <
    NOTES >
    4   PLEASE PRINT IN COLOUR

    2   REFER TO DRAWINGS NO01 - N004 FOR PROJECT SPECIFIC NOTES

   COPYRIGHT ©                                                   Associated Consultants     Client                                 TOD                  =               Drawn            Verified         Project                                                      Drawing Title
This drawing is subject to                                                                                                                                              P COOKE          C DOWDING       BRIDGE REMEDIAL WORKS - REFERENCE                             |NOTES
copyright in accordance with the                                                              £ SCONCE                                                                  Designed         Verified        DESIGN - MUNNA POINT, NOOSA
agreement between Tod
Consulting pty Itd (tc) and tc's                                                                                                                                        C DOWDING        MAY 2014                                                                                                                Drawing Number
client. This drawing shall only be 20.10.14, AMENDED AS CLOUDED NV                                                                   consulting engineers               Approved         RPEQ No         RDP                                                                                                     02600 -N002
used for this specific project.
                       5.9.14 AMENDED AS CLOUDED           NV                                                                                 Noosa: 07 5449 9600          OWDING        8339            LOCAL AUTHORITY NOOSA SHIRE COUNCIL
                                                                                                                                                                          Q
This drawing shall not be used 02.7.14 | ISSUED FOR TENDER PC                                                                         Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337 d) Date          MCU APPROVAL                        HORIZ DATUM                      0   10  20  30  40   50  60
for construction until marked as                                                                                                           PO Box 61, Noosaville, QLD 4566
‘issued for construction’ in the 26.6.14 | ISSUED FOR REVIEW Pc                                                                       [email protected] www todconsulting.com ~S CS 20.10.14   ROL APPROVAL                        VERT DATUM AHD                    Aid|
revision description. Rev| Date |Revision Description    Drawn                                                                                ABN. 39 128 805 336                                        OPW APPROVAL                        RL                                 MEASUREMENT BAR - INCREMENTS IN mm
Log in to download the original file

2015-03-31 I&S Committee - Item 5 - Attachment 2 - Munna Pt Bridge Repairs Design Drawings(PDF, 12MB).pdf · 12.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.