Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2015-03-31 I&S Committee - Item 5 - Attachment 2 - Munna Pt Bridge Repairs Design Drawings

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

CONSTRUCTION SEQUENCE 1 : BRIDGE OPEN TO TRAFFIC :                                                                                CONSTRUCTION SEQUENCE 1 :
                                                                              NO LOAD LIMIT (144 DESIGN LOAD)                                                                                                   ONE SPAN MINIMUM OF BRIDGE
                                                                              1 x 44000kg SEMI TRAILER PER LANE                                                                                                 TO BE OPEN TO BOAT TRAFFIC.
                                                                                                                                                                                                                (SPAN 4 OR 5)

                                                                                                                                           CHECK PREVIOUS TESTED
                                                                                                                                           COLUMN FOR REO COVER
                                                                                                                                           (DEPTH) AND RETEST
                                                                                                                                           CHLORIDE LEVELS FROM                                                                                Om
                                                                               o                                                           SURFACE TO REO DEPTH

         TO NOOSAVILLE
         GYMPIE TERRACE                                                      ©        OVO                                                                                                                                                                                               TO HASTINGS STREET
                                     SPAN 1                              SPAN 2              EUIF            SPAN 3              E               SPAN 4                    E           SPAN 5           F      E         SPAN 6             FILE             SPAN 7
                                                                        NEW CENTRAL
                                          SURFACE LEVEL                 COLUMN 6108                                                                                                    Oooo)                            NEW CENTRAL
                                                                                                                                                                            1.137                                       COLUMN 6108
                                          FROM SURVEY
                                                           IT                                                                                   NEW CENTRAL                          ty                        R.L. U/S PILE CAP 0.037         TI
                                     SAND                  IM       R.L. U/S PILE CAP 0.023       \  R.L. U/S PILE CAP 0.037             custo                              RL. U/S PILE                                  R.L. U/S PILE CAP 0.036 I \               SAND
                                                            AlN                                                                                                              CAP 0.016                      "hy                                 H
                                                                  \    reso                      Hl v               —             TL  \y               a                  ttt
                                    k:                                 FROM ORIGINAL
                                  FI INDURATED.                        DESIGN DRAWINGS
                                     SAND
         DATUM -10. 00               CLAY                                                                                -                                SAND                                                                                                      CLAY

                                         15m                                 15m                                 15m                             15m                                     15m                                 15m                                 15m

                                                                                                                                                          CLAY

                                                                                                                    LONGITUDINAL SECTION
                          E F = BRIDGE DECK FIXITY                                                                  4:400 UNREDUCED AT A3
                                                                                                                    4:200 UNREDUCED AT At
                          E  =_ EXPANSION
                             =
                          F  _  FIXED
                             =

                                                                                                                                                                                                                                                                                                           6330

                                                                                                                                                                                                                                                       EXISTING STEEL
                                                                                                                                                                                                                                                       WATER PIPE

                                                                                           Ww                                                                                                                                           ALL PIERS : NEW 610@ CENTRAL COLUMN                               Lie                                   PIERS 3, 4, & 5 ONLY
                                                                                                                                                                                                                                                                                                                                                IF CONCRETE CRACKED :
                                                                                                                                                                                                                                        AND PARTIAL HEADSTOCK REPAIR                                                                            BREAK OUT AND REPLACE 1000 x
                                                                                                                                                                                                                                        - 6 COLUMNS TOTAL.                                                                                      1200 x 170 NOM CONCRETE BEFORE
                                                                                                                                                                                                                                        REFER TO DRAWING S005 & S006                                                                            INSTALLING COLUMN. REFER TO
                                                                                               ~                                                                                                                                        (NOTE : THIS WILL REDUCE STRESSES IN THE                                                                DRAWING S005, S006 & NO04
                                                                                                                                                                                                                                        PILE CAPS TO 20% - 50% OF CURRENT
                                                                                        Ww  «KS                                                                                                                                         LEVELS.)                                   en                                                \
                                                                                  Ke
                                                                           s                                                                                                                                                                               BED LEVEL NOMINAL - 3.60

                                      SS                         O
                                                         ©

                                                                                                                                                                                                                                                               DATUM -10.00                   4                               | |                   a

    NO
         TE
         PLEASE P'  iT IN COLOUR

    2    THE NOMINATED TIDE LEVELS ARE APPROXIMATE, BASED ON MONITORING
         STATION AT MUNNA POINT, AND QUEENSLAND TIDE TABLES (2010). WAVE ACTION
         & LOCAL TOPOGRAPHY COULD AFFECT WATER LEVELS. THE CONTRACTOR
         SHALL MAKE PROVISION FOR THIS BY EITHER CONFIRMING LOCAL TIDE LEVELS
         BY SURVEY, AND / OR CONTINGENCY PLANS.                                                                                                                                                                                                                                           CROSS SECTION PIER 4
         THE NOMINATED FLOOD LEVELS ARE TAKEN FROM FLOOD IMPACT STUDY                                                                                                                                                                                                                     4:200 UNREDUCED AT A3
         PREPARED BY ARUP - REFER MUNNA POINT BRIDGE REMEDIATION WORKS -                                                                                                                                                                                                                  4:100 UNREDUCED AT At
         BRIDGE DESIGN REPORT, REV C. 10TH OCTOBER 2011.

         REFER TO DRAWINGS NO01 - NO04 FOR PROJECT SPECIFIC NOTES

   COPYRIGHT ©             5.9.14 AMENDED AS CLOUDED                NV     Associated Consultants          Client                                       TOD                       =                 Drawn              Verified            Project                                                                Drawing Title                                     Scale             Sheet Size}
This drawing is subject to 02.7.14 ISSUED FOR TENDER                PC                                      CSCO                                                                                    P COOKE            C DOWDING          BRIDGE REMEDIAL WORKS - REFERENCE                                       |CONSTRUCTION SEQUENCE 1:                        AS SHOWN              Al
copyright in accordance with the
agreement between Tod      26.6.14 ISSUED FOR REVIEW                PC                                                                                                                              Designed           Verified           DESIGN - MUNNA POINT, NOOSA                                             COLUMN         INSTALLATION                       Drawing Number
Consulting pty Itd (tc) and tc's 17.6.14 PILE DIA / BREAK OUT AREA REVISED PC                                                                                                                       C DOWDING          MAY 2014
client. This drawing shall only be 22.5.14 NEW COLUMN REVISED       PC                                                                                     consulting engineers                     Approved           RPEQ No             RDP                                                                                                                      02600 -S001
used for this specific project.
                           20.3.14 INCORPORATES NSC AND             PC                                                                                                Noosa: 07 5449 9600                WDING         8339                LOCAL AUTHORITY  NOOSA SHIRE COUNCIL
This drawing shall not be used    FREYSINNET COMMENTS                                                                                                        Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337 a       Date                MCU APPROVAL                             HORIZ DATUM                            0    10  20   30   40   50  60
for construction until irked as                                                                                                                                   PO Box 61, Noosaville, QLD 4566
‘issued for construction’ in the 14.3.14| ISSUED FOR COMMENT        PC                                                                                      [email protected] www todconsulting.com         20.10.14             ROL APPROVAL                             VERT DATUM AHD                         Aid|
revision description. Rev| Date |Revision Description              Drawn                                                                                              ABN. 39 128 805 336                                                  OPW APPROVAL                             RL                                       MEASUREMENT BAR - INCREMENTS IN mm
Log in to download the original file

2015-03-31 I&S Committee - Item 5 - Attachment 2 - Munna Pt Bridge Repairs Design Drawings(PDF, 12MB).pdf · 12.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.