Original source · versioned page text
Planning Report IDAS Forms Cover letter, Owner's consent, Appendices 2- PLM minutes & 3 - Economic Needs - Email 1 of 4 MCU16/0153 & REC16/0041
MATERIAL CHANGE OF USE TO ESTABLISH MULTIPLE HOUSING & VISITOR ACCOMMODATION 215 DAVID LOW WAY, PEREGIAN BEACH 41 balustrades as well as an appropriate colour palette, which is consistent with existing development, as well as the coastal landscape; and, The proposed development provides a quality landscaping outcome that is consistent with the landscaping qualities of the Peregian Beach area. Environment The proposed development retains and protects an area of 5,276m2 for environment and conservation purposes. It is noted that this area was required to be dedicated as a reserve associated with Court Approval (Appeal 2587 of 2008). Despite this, the development has not been enacted upon and this development would replace the current Court Approval, should it be approved. Community Expectations (Residents and Local Businesses) The proposed development is consistent with Council’s and the community’s expectations on the site, due to the existing approved ‘Essence of Peregian’ development remaining current and containing very similar land use elements, as well as built form/character. 144. Accordingly, based on the above, the proposed development complies with the Strategic Framework, Desired Environmental Outcomes, as well as the Overall Outcomes of the Eastern Beaches Locality Code. The Eastern Beaches Locality has been addressed in full and is included within Appendix 12 of this Town Planning Report. 5.5.1.2 Building Height – Probable Solution S4.1 145. The proposed development generally complies with the preferred maximum building height of 8 metres specified within with code, with all detached units containing a maximum building height not exceeding 7 metres in height, when considered from the finished ground level. When considered from the Natural Ground Level, there are a number of roof forms associated with the detached Multiple Housing Units that exceed the 8 metre height limit, as demonstrated in Figure 22 below. Figure 22 Building Height Limit (Source: Sprout Architects) 146. Further, the Visitor Accommodation and shared Multiple Housing building, which is proposed to be constructed in Stage 2, contains a total building height not exceeding 12 metres (as demonstrated in Figure 23 below). THOMCO (NO 2087) PTY LTD DECEMBER 2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.